Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX RELEASE.
Quarterly Activity Report
ASX Announcement
26th October 2023
Catalina Resources is an
Australian diversified
mineral exploration and
mine development
company.
Period ending 30th September 2023
Highlights
Nelson Bay River Iron Project (DSO Pit)
❖
o
Referral Application (EPBC 2023/09571) validated by DCCEW in Aug
23.
➢
EPBC 2023/09571 published for public consultation.
➢
Decision expected in Nov 23 whether this proposed project
is a controlled action or not.
Directors
Executive Chairman and
Company Secretary
Sanjay Loyalka
Laverton Project
❖
o
Technical Director and
Chief Geologist
Michael Busbridge
Non-Executive Director
Richard Beazley
Access agreement concluded with neighbouring party (Mt Weld Mining Pty
Ltd) holding overlapping miscellaneous licenses, following prolonged
negotiations.
➢
Minutes for withdrawal of objections lodged in Aug 23. Grant of
tenement is expected following processing of withdrawal of
objections in the Warden’s court.
➢
E38/3697 is located:
▪
adjacent to the Mt Weld Intrusive Carbonatite REE
complex, a major source of critical metals and Australia’s
only producing REE mine; and
▪
along strike of Pelican Laterite Nickel Resource; and
▪
along strike of Barnicoat Shear Zone that is host to
multiple gold deposits along its length including Mon Ami,
Ida H and Barnicoat
ASX Code
CTN
CONTACT DETAILS
Unit 38
18 Stirling Highway
NEDLANDS WA 6009
Lachlan Fold Belt Project
❖
o
T +61 8 61181672
E info@catalinaresources.com.au
Pursuing actions to enable consideration of revoking of the suspension at
EL9155, Rock Lodge Project:
➢
➢
▪
Independent review of compliance systems.
▪
Biodiversity Assessment.
Comments received from Heritage NSW in Aug 2023 on the
application for Aboriginal Heritage Impact Permit (AHIP).
Accordingly, the Aboriginal Cultural Heritage Assessment Report
was revised after due consultation with all Registered Aboriginal
parties & an updated application for AHIP lodged in Sept 23.
o
Resources Regulator, NSW has in July 23 accepted the Mining Act
Enforceable Undertaking (“EU”) by Catalina Resources Ltd to conclude
investigations and enforcement actions in connection with the alleged
breaches at EL9155. All agreed commitments were completed during the
quarter.
o
Company reviewing its strategic options at EL9346, Oak Hill due to the
resistance to exploration by landowners in the immediate region.
Dundas Project
❖
o
Conservation Management Plan (CMP) to enable further exploration has
been updated & lodged with the DBCA in Sept 23. This was following
comments from DBCA in Aug 23 on the draft CMP lodged in Feb 23.
Business Development
❖
o
Catalina Resources Ltd
Regulator has conveyed acceptance of following activities:
Catalina is continuing to actively identify and assess exploration and early
development opportunities in Lithium, Rare Earths, Gold and Base Metals
projects.
ACN: 130 618 683
W: www.catalinaresources.com.au
ASX RELEASE.
Page 2 of 10
Nelson Bay River Iron Project (DSO pit)
Catalina Resources Ltd (“Catalina” and/or “the Company”) received communication from Department of
Climate Change, Energy, the Environment and Water (“DCCEW” and or “the Department”) that the
Department has successfully received and validated our Referral Application (EPBC 2023/09571) regarding
NBR DSO Project for consideration under the Environment Protection and Biodiversity Conservation
Act 1999 (EPBC Act).
Information about this proposed action has been published on the Department’s website for public
consultation. The period of consultation will extend for 10 business days. At the end of the consultation
period, the information included in the referral, along with any comments received, will be used to help
decide whether this proposed action:
➢
is a controlled action (one that is likely to have a significant impact on matters protected under the
EPBC Act and therefore needs to be assessed and approved by the Minister for the Environment
and Energy before it can proceed), or
➢
is not a controlled action and may be undertaken but only as described in the referral, or
➢
does not require approval under the EPBC Act.
The Decision is expected in November 2023.
While the Company is deeply disappointed with the inordinate delays and ever changing and new
requirements in the permitting process, it continues to follow up with the Government authorities. As the
process is not controlled by the Company, Catalina is not in a position to forecast a timeline around the
permitting process but hopes it would be completed during the coming year, 2024. On that basis, the
Company expects to be in a position to consider the decision for recommencement of the mine once the
permitting process is completed.
NBR Project (Mining Lease 3M/2011) is located in the far north-west of Tasmania and is approximately
150km from the Burnie Port. The Project is within an established mineral province in the region. Operating
mines include Grange Resources’ (ASX: GRR) Savage River Iron Ore.
The Direct Shipping Ore (DSO) project at NBR is an all-contract mining, processing and haulage operation
using local contractors in the region. It requires no major processing beyond crushing and screening after
which the ore is then trucked to the port and shipped. It was developed in 2013 with the first shipment of
ore leaving the Port of Burnie in January 2014. NBR project was placed on care and maintenance in June
2014 following sharp iron ore price falls.
Historical production from the previous mining campaign totalled 181,000 tonnes shipped with average
grades of Fe 57.5%, SiO2 7.7%, Al2O3 1.3%, P 0.07% and S 0.04%.
The historic price received for NBR ore was enhanced with premiums (in line with market benchmarks) for
➢
low Alumina; and
➢
Lump. (About 40% of the DSO Iron ore at NBR is Lumps with Iron ore Fines being approx. 60%)
Historic costs during FY2014 when the mine was last in production was approximately AUD $72 per tonne
FOB Burnie Port (as derived from 2014 Annual Report to Shareholders).
ASX RELEASE.
Page 3 of 10
With the improvement in the iron ore price in recent years, the Company has been actively working to repermit the NBR. The strategy has been to recommence the production of the DSO resources from the
existing open pit at NBR. Iron Ore prices while volatile, are expected to remain at healthy levels as the
near-term supply response is expected to be limited, particularly with little latent capacity left at major Iron
Ore exporting ports and railways in Australia.
Laverton Project
During the quarter, following prolonged negotiations, the Company was successful in completing an access
agreement with Mt Weld Mining Pty Ltd. Consequently, the minutes to withdraw objections were lodged
with the Department in August 2023 and the tenement is expected to be granted following processing of
these matters at the Warden court.
As reported in the Company’s March 2023 & June 2023 Quarterly Reports, the following agreements with
other relevant parties were negotiated & executed.
•
Heritage agreement with NTS Goldfields Limited as agent for the Nyalpa Pirniku, native title
party.
•
Access agreement with GSM Mining Company Pty Ltd, a wholly owned subsidiary of Gold
Fields Ltd.
•
Access agreement with Focus Minerals (Laverton) Pty Ltd
•
Access agreement with Murrin Murrin Operations Pty Limited
The Laverton Project is located within the Laverton Gold Province, an exceptionally mineralised terrain in
the Eastern Goldfields, Western Australia. The region hosts several world class deposits of gold, nickel,
and rare earth element (REE) including Sunrise Dam (>10Moz Au), Wallaby (> 8Moz Au), Windara Nickel
(combined 85K tonnes nickel sulphide) and the Mt Weld REE deposit, one of the highest-grade rare-earth
deposits in the world (Mineral Resource of 54.7 Mt @ 5.3% TREO).
Within Catalina’s Laverton Project, E38/3697 is the largest tenement in a group of seven tenements,
illustrated in Figure 1. Catalina has identified several very compelling under-cover REE, gold, and nickel
mineralization drill target areas within E38/3697. The targets have been generated through an integrated
approach using interpretation of low-level detailed aeromagnetic images, ground gravity images, historical
exploration drilling programs and the mineralisation models developed from the neighboring world class
deposits. Historical drilling within the tenement has been sporadic and non-systematic with significant
geochemical anomalies not followed up. Lynas Rare Earth also operates the Mt Weld Rare Earth Element
(REE) operation only 2 kms to the south of E38/3697.
ASX RELEASE.
Page 4 of 10
Figure 1. Regional location of the Laverton project
Lachlan Fold Belt Project
Rock Lodge EL9155
The Company continues progressing actions to enable consideration for revoking the suspension at Rock
Lodge EL9155. Resources Regulator, NSW has conveyed acceptance of the following activities:
•
Independent review of compliance systems.
•
Biodiversity Assessment.
Comments were received from Heritage NSW in August 2023 on the application for Aboriginal Heritage
Impact Permit (AHIP). Accordingly, the Aboriginal Cultural Heritage Assessment Report was revised after
due consultation with Registered Aboriginal parties and the updated application for the AHIP was lodged in
September 2023.
Additionally, the Company also finalised negotiations with the Regulator for the conclusion of investigations
and enforcement actions in connection with the alleged breaches and suspension at Rock Lodge EL9155.
Consequently, the Resources Regulator, NSW, in July 2023, accepted the Mining Act Enforceable
Undertaking (“EU”) by Catalina Resources Ltd, including a minimum expenditure of $141,964 in carrying
out terms of the EU, aimed at delivering benefits in relation to the management of the title, industry and
community. All the commitments have been completed during the quarter.
The EU includes the following text:
“Catalina Resources Ltd reiterates its submissions on 23 May 2022 and 16 June 2022 in particular:
a) The alleged contraventions were not caused by Catalina Resources Ltd, rather by Rangott
Mineral Exploration Pty. Limited who had extensive mining exploration experience, and who
had been engaged to supervise and manage the works as a result of COVID-19 travel
restrictions; and
b) Catalina Resources Ltd took all reasonable steps practically possible to prevent any
contravention and met its obligations of environmental care under the Mining Act.
ASX RELEASE.
Page 5 of 10
Catalina Resources Ltd as the holder of EL9155 accepts ultimate responsibility for the aforesaid alleged
contraventions. Catalina Resources Ltd seeks to enter into this enforceable undertaking to jointly carry
out strategies with Rangott Mineral Exploration Pty. Limited to carry out rectification activities in respect
of the alleged contraventions.
Rangott Mineral Exploration Pty. Limited has accepted the responsibility for the alleged contravention
under the aid and abet the commission of an offence - section 378EA of the Mining Act 1992 and
offered a separate enforceable undertaking committing to a minimum of $87,500 to deliver benefits in
relation to the management of the title, industry and community.”
Catalina’s RC drilling in 2022 intersected a wide zone of stacked vertical lenses of polymetallic
mineralisation at Rock Lodge. For example, RC hole SRLRC005 intersected 4 significant mineralised
zones over a width of 24m, from 75m to 99m (including 2m @ 2.13 g/t Au & another 2m @ 2.12 g/t
Au). At the end of hole, 102m, rocks were still pervasively hydrothermally altered (pyrite, silica, sericite)
suggesting that additional downhole zones may have been intersected if excessive water flows had not
stopped drilling. West of SRLRC05, Shree’s drilling has intersected mineralisation in SRLRC02 (8m @ 1.08
g/t Au including 3m @ 2.12 g/t Au), illustrated in figure 2. The intersections from Catalina’s drill holes
SRLRC02 to SRLRC05 and also the historical drilling, including MYRC01, constitute a very wide
(60m) mineralised envelope of stacked vertical lenses of significant polymetallic sulphide at Rock
Lodge. Two hundred meters to the north, IP anomalies and similar anomalous rock chip
geochemical signatures suggest the mineralisation envelope may be continuous at least to this
area. As the mineralised envelop is open in all directions further drilling focusing on the continuity, depth
and lateral extent of the stacked veins is now a very high priority and represents an exciting drill target.
Figure 2
ASX RELEASE.
Page 6 of 10
After the lifting of the suspension, the Company plans to drill two or three deeper angled diamond drill holes
beneath previously drilled RC holes, illustrated in figure 2. Down Hole Electro Magnetic Surveys (DHEM)
will also be employed, searching for off-hole conductors, which may represent wider massive sulphide
mineralisation than what has already been found in the RC drilling. Additionally, diamond drilling will enable
the collection of orientated structural data, including dips and strikes of mineralised veins, necessary for
future drill hole planning and calculations of the true widths of mineralisation.
Oak Hill, EL9346
Catalina’s Oak Hill Project (EL9346) is located 25 kms northwest of Albury in NSW. It abuts EL7544 on its
eastern side. Within EL7544 the Stoney Park and Elm Park gold prospects, discovered in 2015 by Minerals
Aust Pty Ltd, have a combined JORC 2012 Mineral Resource of 154koz Au.
As reported in previous ASX announcements, Catalina conducted geochemical studies including soil
sampling & rock chip sampling within EL9346 earlier this year. Soil and rock chip assays outline a robust
southwest orientated anomaly exceeding 600m in strike length with assays up to 1.4 g/t Au, 28 g/t Ag,
0.44% Pb and 1.27% As have been received from rock chips. The anomaly has been interpreted as
southwestern extension of the mineralised trend that contains the two gold resources discussed above.
The Company completed follow up studies including RC drill planning for which approval has been received
from the Department in September 2023.
EL9346 consists of several private land holdings. The Company has pursued discussions with the
respective landholders for access agreements to conduct exploration within the tenement area. However,
many of the landholders have not engaged in access agreement negotiations & have rather conveyed a
lack of support for exploration in the immediate region due to land & water degradation concerns both in
the immediate proposed exploration area and nearby.
The Company has been able to secure only one land access agreement within the tenement. However,
this agreement does provide access to the main area of interest being the identified trend as discussed
above. Also, the council road which is required to access the area of interest has been illegally blocked by
a neighbouring landholder. We understand that the council ranger has issued a notice to the relevant
person.
In light of the above circumstances, the Company has not proceeded with the planned RC drill campaign
and is reviewing its strategic options at EL9346, Oak Hill project due to lack of a conducive environment
and community support for exploration in the immediate region of EL9346.
Dundas Project
Catalina received comments from DBCA in August 2023, on the draft Conservation Management Plan
(CMP) which was lodged with the DBCA in February 2023. The Company has updated the CMP
appropriately & has lodged the revised version in September 2023.
The CMP contains details for the next phase of exploration including deeper drilling on the two existing
granted ELs (“exploration licences”) in the Dundas project and exploration plans for the two ELAs
(“exploration licence applications).
Background of CMP: As the project is in the Dundas National Park, additional tenement conditions over
and above that for normal exploration licences are in force. These tenement conditions include, prior to
any environmental disturbance, the licensee preparing a detailed CMP for each phase of proposed
exploration for approval. The Minister for Environment and the Conservation and Parks Commission has
formal requirements under Section 24 of the Mining Act 1978 (Mining Act) to provide formal
recommendations on proposed activities in Dundas Nature Reserve prior to the Minister for Mines and
Petroleum providing his consent. DBCA reviews and presents the information prepared by and on behalf
of the applicant (including copies of the proposal document(s)) to the Minister for Environment and the
Conservation and Parks Commission in the form of a CMP.
ASX RELEASE.
Page 7 of 10
A 105-hole air core drill program was completed at the Dundas Project in December 2022 for a total of
2,909m with an average depth of 27.7m. A 6-20m blanket of transported colluvium and lake clays overlies
and masks the bedrock geology. To look below this blanket air core drilling successfully intersected
geochemical and lithological information of the bedrock to plan follow up RC drilling. Essentially the air
core work has identified the geochemical halo to a potentially larger target at depth. Deeper RC drilling
will be planned to drill underneath and along strike of these air core anomalies.
Significant REE intersections include:
•
6m @ 0.6% TREO from 16 – 22m in hole 22DAC066, including.
• 2m @ 1.02% TREO from 16-18m, includes 0.23% Nd₂O₃, 0.42% Ce₂O₃, 223 ppm
Dy₂O₃, 0.12% La₂O₃.
•
3m @ 0.92% TREO from 22 – 25m in hole 22DAC095, including.
• 1m @ 1.8% TREO, includes 0.35% Nd₂O₃, 0.75% Ce₂O₃, 284 ppm Dy₂O₃, 0.31%
La₂O₃.
The assays display an ‘exceptional’ critical magnet metal (NdPr+DyTb) ratio of 24% to total TREOs.
These four HREEs are the core ingredients for the manufacturing of permanent magnets which are used
in electric motors and generators. The growth in permanent magnets is attributed to increased use in the
automotive industry and electric vehicle drivetrains.
The Dundas Project area is situated within the inferred SE extensions of the mineralised Norseman –
Wiluna Belt of the Archaean Yilgarn Craton and comprises a tectonostratigraphic assemblage of mafic,
ultramafic and sedimentary dominated units. A major northwest trending fault system transects the
tenements and may represent the prospective Boulder-Lefroy Fault Zone (BLFZ) and the Zuleika Shear
Systems (ZS). These shears and faults are highly prospective for gold (Swager et al., 1995). The
tenements are also prospective for lithium mineralisation, being only 25 kms to the southwest of
Liontown’s Buldania Lithium Project, also along the Zuleika Shear Zone. Field work and historical
drill hole reporting has confirmed the presence of pegmatites within Catalina’s tenements.
Business Development
Catalina is continuing to identify and assess exploration and early development opportunities in Lithium,
Rare Earths, Gold and Base Metals projects. As previously reported, the Company has successfully built
up an exciting portfolio of exploration projects in world class mineral provinces. These exploration
tenements/projects acquired are at an early stage and the Company is systematically completing the initial
steps of access agreements, heritage agreements, surveys and desktop studies to enable the
advancement of exploration activity.
As the Company continues its efforts to seek new projects and advance its exploration porfolio, it has also
implemented a process of continuous evaluation & prioritisation of its projects. Consequently, the Company
decided to voluntarily surrender E40/384, Ulysses South in October 2023.
ASX RELEASE.
Page 8 of 10
Tenements
The mining tenements held at the end of quarter and their location.
Mine
Lease/
Locality
Remarks
Exploration License
3M/2011
ML
Nelson Bay River
100% Catalina Resources Ltd
E40/378
EL
Golden Chimney
100% Catalina Resources Ltd
E40/384 *
EL
Ulysses South
100% Catalina Resources Ltd
E63/2046
EL
Dundas
100% Catalina Resources Ltd
E63/2048
EL
Dundas
100% Catalina Resources Ltd
E63/2136
ELA
Dundas
100% Catalina Resources Ltd
E63/2227
ELA
Dundas
100% Catalina Resources Ltd
EL9155
EL
Rock Lodge
100% Catalina Resources Ltd
EL9346
EL
Oak Hill
100% Catalina Resources Ltd
E38/3677
EL
Laverton
100% Catalina Resources Ltd
E38/3697
ELA
Laverton
100% Catalina Resources Ltd
E38/3698
ELA
Laverton
100% Catalina Resources Ltd
E38/3726
EL
Laverton
100% Catalina Resources Ltd
P38/4554
EL
Laverton
100% Catalina Resources Ltd
P38/4555
EL
Laverton
100% Catalina Resources Ltd
P38/4556
EL
Laverton
100% Catalina Resources Ltd
E38/3771
ELA
Laverton
100% Catalina Resources Ltd
E38/3772
ELA
Laverton
100% Catalina Resources Ltd
E63/2269
ELA
Dundas
100% Catalina Resources Ltd
E63/2270
ELA
Dundas
100% Catalina Resources Ltd
E38/3847
ELA
Laverton
100% Catalina Resources Ltd
ELA: Licence Application
* E40/384 Ulysses South surrendered in October 2023.
➢
The mining tenement interests relinquished during the quarter and their location.
o NIL
➢
The mining tenements interests acquired and disposed of during the quarter and their location.
o NIL
➢
The beneficial percentage interests held in farm-in or farm-out agreements at the end of the
quarter.
o NIL
➢
The beneficial percentage interests in farm-in or farm-out agreements acquired or disposed of
during the quarter.
o NIL.
Corporate
During the Quarter, a total sum of $96 (thousand) was paid to related parties and their associates. The
Company advises that this relates to executive directors’ salaries, consulting charges to directors, nonexecutive director’s fees and superannuation.
Exploration and Evaluation Expenditure during the Quarter was $54 (thousand). Details of exploration
activity is included in this Quarterly Activities Report.
Mining development activities during the Quarter was $4 (thousand) for permitting efforts for the NBR
project, as detailed in this Quarterly Activities Report. There were no substantial mining production activities
during the Quarter.
ASX RELEASE.
Page 9 of 10
Top 20 Holdings as at 24-10-2023
HSBC CUSTODY NOMINEES (AUSTRALIA) LIMITED
IACG PTY LTD
MR PAUL COLEMAN
CITICORP NOMINEES PTY LIMITED
MS CHUNYAN NIU
MR VIKRANT JINDAL
MR DAVID WILLIAM MOSS
CHINA ALLIANCE INTERNATIONAL HOLDINGS GROUP LIMITED
MR ALEX GORDON
MR SANJAY KUMAR LOYALKA
MEGAWILD ENTERPRISES PTY LTD <VEER POONAM POOJAN PROP
A/C>
OCEANIA COAL RESOURCES NL
FINCLEAR PTY LTD <SUPERHERO SECURITIES A/C>
MR RUPERT JAMES GRAHAM LOWE
HELMSDALE INVESTMENTS PTY LTD
MR PATRICK ROMAN GALICKI
MOUNT STREET INVESTMENTS PTY LTD <THE M J BLAKE S/F A/C>
MR SHANE ROY WOOLFORD
AMRITLAL V SHAH & NEETA A SHAH <VEER SUPERANNUATION A/C>
MR SAMUEL JACOB CARROLL
Total Securities of Top 20 Holdings
Total of Securities
Balance as at 24-102023
217,313,417
84,142,411
33,333,333
31,741,636
28,500,000
27,722,000
25,450,000
23,223,632
22,000,000
21,931,280
15,736,240
%
17.547%
6.794%
2.691%
2.563%
2.301%
2.238%
2.055%
1.875%
1.776%
1.771%
1.271%
15,000,000
13,632,917
13,244,128
11,875,000
11,600,000
9,625,750
7,010,389
6,968,460
6,089,491
1.211%
1.101%
1.069%
0.959%
0.937%
0.777%
0.566%
0.563%
0.492%
626,140,084 50.557%
1,238,486,892
Competent Person Statement
The review of historical exploration activities and results contained in this report is based on information
compiled by Michael Busbridge, a Member of the Australian Institute of Geoscientists and a Member of the
Society of Economic Geologists. He is a consultant to Catalina Resources Ltd and has joined the Board of
Catalina Resources Ltd effective 19 January 2023. He has sufficient experience which is relevant to the
style of mineralisation and types of deposits under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (the JORC Code).
Michael Busbridge has consented to the inclusion in the report of the matters based on his information in
the form and context in which it appears.
ASX RELEASE.
Page 10 of 10
The Company confirms that it is not aware of any new information or data that materially affects the
information in the original reports, and that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original reports.
Where the Company refers to the Mineral Resources in this report (referencing previous releases made to
the ASX), it confirms that it is not aware of any new information or data that materially affects the information
included in that announcement and all material assumptions and technical parameters underpinning the
Mineral Resource estimate with that announcement continue to apply and have not materially changed.
This Quarterly Activities Report contains information extracted from ASX market announcements reported
in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code reporting
tables where applicable) of exploration results referred to in this Quarterly Activities Report can be found in
the following announcements lodged on the ASX:
31/05/2022
RC Drilling hits multiple Gold, Silver, base metal lenses
02/05/2023
Air core re-splits reveal assays exceeding 1% TREO at
Dundas
06/07/2023
Surface geochemistry outlines drill target at Oak Hill
These announcements are available for viewing on the Company’s website. The Company confirms that it
is not aware of any new information or data that materially affects the information included in any original
ASX announcement.
Forward looking statements
This announcement may contain certain “forward looking statements” which may not have been based
solely on historical facts, but rather may be based on the Company’s current expectations about future
events and results. Where the Company expresses or implies an expectation or belief as to future events
or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis.
However, forward looking statements are subject to risks, uncertainties, assumptions, and other factors
which could cause actual results to differ materially from future results expressed, projected or implied by
such forward looking statements. Such risks include, but are not limited to exploration risk, mineral resource
risk, metal price volatility, currency fluctuations, increased production costs and variances in ore grade or
recovery rates from those assumed in mining plans, as well as political and operational risks in the countries
and states in which we sell our product to, and government regulation and judicial outcomes.
Readers should not place undue reliance on forward looking information. The Company does not undertake
any obligation to release publicly any revisions to any “forward looking statement” to reflect events or
circumstances after the date of this announcement, or to reflect the occurrence of unanticipated events,
except as may be required under applicable securities laws.
The release of this document to the market has been authorised by the Board.
ABOUT CATALINA RESOURCES LTD
Catalina Resources Ltd is an Australian diversified mineral exploration and mine development company
whose vision is to create shareholder value through the successful exploration of prospective gold, base
metals, lithium, rare earths and iron ore projects and the development of these projects into production.
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Catalina Resources Ltd
ABN
Quarter ended (“current quarter”)
74 130 618 683
30/09/2023
Consolidated statement of cash flows
Current quarter
$A’000
Year to date (3
months)
$A’000
(b) development
(4)
(4)
(c) production (Care & Maintenance)
(6)
(6)
(d) staff costs
(86)
(86)
21
(e) administration and corporate costs
(36)
(36)
1.3
Dividends received (see note 3)
1.4
Interest received
102
102
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (EU Rock Lodge)
(142)
(142)
1.9
Net cash from / (used in) operating
activities
(172)
(172)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(54)
(54)
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date (3
months)
$A’000
(54)
(54)
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginnin