Aircore Drilling completed at Laverton
Project
Highlights
•
Drilling completed at E38/3697
•
The program comprised 25 holes for 1,593m.
•
Drilling targeted gold and REE targets.
A program of Aircore drilling at the Laverton Project testing gold and
REE targets has been completed (Figure 1).
Director
Michael Busbridge
The program comprised twenty-five Aircore holes for a total meterage
Director
Martin Bennett
test for gold mineralization along the interpreted strike of the Barnicoat
ASX Code
CTN
of 1,593m (Appendix 1). Twenty holes were drilled in four traverses to
Shear Zone between the Lily Pond Well and Pendergast gold
prospects (Figure 2-3). The remaining five holes were drilled to test for
rare earth element (REE) mineralization associated with point source
magnetic anomalies modelled by Southern Geoscience Consultants.
CONTACT DETAILS
Unit 38
18 Stirling Highway
NEDLANDS WA 6009
T +61 8 61181672
E info@catalinaresources.com.au
Figure 1: E38/3697 location plan
Catalina Resources Limited
ACN: 130 618 683
W: www.catalinaresources.com.au
ASX RELEASE.
Page 2 of 12
The holes were sampled by taking 4m composites downhole that were submitted to the Bureau Veritas
Laboratory in Perth for analysis for low level gold, nickel and REE using methods AR001 and AR102 - an
Aqua Regia digest with ICP-MS finish. A 1m split of each meter sample was also collected and stored for
follow up analysis if required. Assay results will be available in approximately 8 weeks.
Figure 2: Location of drill collars (LVAC001-25) within E38/3697
ASX RELEASE.
Page 3 of 12
Figure 3: Aeromagnetic image (1VD) showing location of Aircore holes and magnetic anomalies tested
Background
E38/3697 is a ~45km2 (15 sub-block tenement) located 20km southeast of Laverton within the Laverton
Gold Province, an exceptionally well mineralised terrain in the Eastern Goldfields, Western Australia. The
region hosts several world class deposits of gold, nickel, and rare earth elements (REE) including Sunrise
Dam (>10Moz Au), Wallaby (> 8Moz Au), Windara Nickel (combined 85k tonnes nickel sulphide) and the
Mt Weld REE deposit, one of the highest-grade rare-earth deposits in the world (Mineral Resource of 54.7
Mt @ 5.3% TREO).
The Aircore drilling targeted areas along strike from the Lily Pond Well Mineral Resource (340kt @ 1.4 g/t
Au1) that is hosted by the north-south trending Barnicoat Shear Zone. The shear zone traverses the
southwest corner of E38/3697 and is interpreted to link the Lily Pond Well resource with the Mon Ami
(1.56Mt @ 1.1g/t Au2) and Ida H (630kt @ 1.4 g/t Au3) Mineral Resources to the north. In addition, drilling
tested REE targets associated with magnetic anomalies.
ASX RELEASE.
Page 4 of 12
References
This announcement contains information extracted from ASX market announcements reported in
accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code reporting
tables where applicable) of Mineral Resources and exploration results referred to in this announcement
can be found in the following ASX announcements and reports:
1Westaway, J., Lily Pond Well Project: Annual Report for period 1 Jan 1999 to 31 Dec 1999. Sons of
Gwalia WAMEX Report 1999 (A60870).
2Great Southern Mining Ltd (ASX: GSN) announcement, 21st July 2021; Indicated Mineral Resource Mon
Ami.
3Minedex 2003: Ida H Mineral Resource: 630kt @ 1.4 g/t Au.
4Catalina Resources Ltd (ASX:CTN) announcement, 3rd November 2023: Prospective Gold-Nickel-REE
Tenement Granted near Laverton.
Competent Person Statement
The review of historical exploration activities and results contained in this report is based on information
compiled by Martin Bennett, a Member of the Australian Institute of Geoscientists. He is a Director of
Catalina Resources Ltd. He has sufficient experience which is relevant to the style of mineralisation and
types of deposits under consideration and to the activity which he is undertaking to qualify as a Competent
Person as defined in the 2012 edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (the JORC Code).
Martin Bennett has consented to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information in the original reports, and that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original reports.
Where the Company refers to the Mineral Resources in this report (referencing previous releases made
to the ASX), it confirms that it is not aware of any new information or data that materially affects the
information included in that announcement and all material assumptions and technical parameters
underpinning the Mineral Resource estimate with that announcement continue to apply and have not
materially changed.
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development
company whose vision is to create shareholder value through the successful exploration of prospective
gold, base metal, lithium and iron ore projects and the development of these projects into production.
The release of this document to the market has been authorised by the Board of Catalina Resources Ltd.
ASX RELEASE.
Page 5 of 12
APPENDIX 1
Aircore Drill Hole Coordinates
Tenement
Hole Id Drill Type
MGA
East
MGA
North
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
E38/3697
LVAC001
LVAC002
LVAC003
LVAC004
LVAC005
LVAC006
LVAC007
LVAC008
LVAC009
LVAC010
LVAC011
LVAC012
LVAC013
LVAC014
LVAC015
LVAC016
LVAC017
LVAC018
LVAC019
LVAC020
LVAC021
LVAC022
LVAC023
LVAC024
LVAC025
452567
452768
452955
453064
453160
453261
452663
452858
453563
453448
453663
453767
453864
453962
454064
454161
453831
452861
452955
452860
452968
454895
455284
455734
456151
6811952
6811957
6811952
6811954
6811961
6811949
6811962
6811944
6810852
6810848
6810850
6810846
6810844
6810856
6810847
6810849
6811099
6812994
6813006
6812598
6812600
6813117
6812449
6812400
6813096
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
AC
Inclination Azimuth Elevation
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-90
-60
-60
-60
-60
-90
-90
-90
-90
270
270
270
270
270
270
270
270
270
270
270
270
270
270
270
270
0
270
270
270
270
0
0
0
0
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
450
Depth
(m)
59
33
60
77
88
69
20
77
87
91
97
76
66
57
55
28
17
78
84
84
78
73
31
55
53
Hole
MGA Grid ID
Diameter
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
85mm
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
GDA94 Z51
ASX RELEASE.
Page 6 of 12
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
JORC Code explanation
Commentary
• Nature and quality of sampling (eg
• Catalina Resources completed 25 Aircore
cut channels, random chips, or
drill holes for 1,593m at its Laverton
specific specialised industry standard Project, near Laverton WA.
measurement tools appropriate to the • Drilling is located within Catalina’s
minerals under investigation, such as
E38/3697, during February 2024.
down hole gamma sondes, or
• Sampling of the Aircore holes was
handheld XRF instruments, etc).
conducted by taking 4m composites
These examples should not be taken
downhole. A 1m split was also taken
as limiting the broad meaning of
using a manual splitter for follow up
sampling.
analysis if required.
• Include reference to measures taken • The majority of the 1m and 4m samples
to ensure sample representivity and
were dry and weighed between 1.5 and
the appropriate calibration of any
2.5kg. Occasional groundwater
measurement tools or systems used.
intersected at the bottom of holes caused
• Aspects of the determination of
some samples to be wet.
mineralisation that are Material to the • 1m sample piles from the cyclone were
Public Report.
laid out in orderly rows on the ground.
• In cases where ‘industry standard’
• Using a hand-held trowel, 4m composite
work has been done this would be
samples were collected from the 1m
relatively simple (eg ‘reverse
piles. This compositing was aimed to
circulation drilling was used to obtain
reduce assaying costs.
1 m samples from which 3 kg was
• These composite samples weighed
pulverised to produce a 30 g charge
between 1.5 and 2.5kg.
for fire assay’). In other cases more
• Any 4m composite sample that returns an
explanation may be required, such as anomalous assay will be re-assayed
where there is coarse gold that has
using the corresponding 1m split samples
inherent sampling problems. Unusual that will be assayed by Fire Assay.
commodities or mineralisation types • Quality control of the assaying comprised
(eg submarine nodules) may warrant
the collection of duplicate samples and
disclosure of detailed information.
insertion of industry (OREAS) standards
(certified reference material) every
twentieth sample.
• Samples were sent to the Bureau Veritas
Laboratory in Perth.
• Samples will be pulverized so that 75% of
the sample passes 75µm.
• A representative sample of the pulp will
then be digested using Aqua Regia (acid)
and assayed by ICP-MS for low level
gold, Ni, Co and Cr using method AR001
and REEs using method AR102.
• Drill type (eg core, reverse
• The drilling contractor was Gyro Drilling
circulation, open-hole hammer, rotary from Kalgoorlie. Gyro uses 3m drill rods.
air blast, auger, Bangka, sonic, etc)
• Holes were drilled to blade refusal.
and details (eg core diameter, triple
• Hole diameter was 85mm / 3.5”.
or standard tube, depth of diamond
• Aircore drilling uses a three-bladed steel
tails, face-sampling bit or other type,
or tungsten drill bit to penetrate the
whether core is oriented and if so, by
weathered layer of loose soil and rock
what method, etc).
fragments. The drill rods are hollow and
feature an inner tube with an outer barrel
(like RC drilling).
• Aircore drilling uses small compressors
(750 cfm/250 psi) to drill holes into the
ASX RELEASE.
Page 7 of 12
Criteria
Drill sample
recovery
JORC Code explanation
•
•
•
Logging
•
•
•
Sub-sampling •
techniques and
sample
preparation
•
•
•
•
•
Commentary
weathered layer of loose soil and
fragments of rock. After drilling is
complete, an injection of compressed air
is unleashed into the space between the
inner tube and the drill rods inside wall,
which flushes the cuttings up and out of
the drill hole through the rod’s inner tube,
causing less chance of crosscontamination.
• Gyro used an Air 750 CFM / 250 PSI
Sullair Compressor.
Method of recording and assessing
• Representative Aircore samples were
core and chip sample recoveries and collected at 1m intervals, with drill chips
results assessed.
from end of hole placed into chip trays
and kept for reference at Catalina’s
Measures taken to maximise sample
facilities.
recovery and ensure representative
nature of the samples.
• Most samples were dry and sample
recovery was very good.
Whether a relationship exists
between sample recovery and grade • Catalina does not anticipate any sample
and whether sample bias may have
bias from loss/gain of material from
occurred due to preferential loss/gain cyclone.
of fine/coarse grained material.
Whether core and chip samples have • All Aircore samples were lithologically
been geologically and geotechnically
logged using standard industry logging
logged to a level of detail to support
software on a notebook computer.
appropriate Mineral Resource
• Logging is qualitative in nature.
estimation, mining studies and
• All geological information noted above
metallurgical studies.
has been completed by a competent
Whether logging is qualitative or
person as recognized by JORC.
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of
the relevant intersections logged.
If core, whether cut or sawn and
• Aircore sampling was undertaken on 1m
whether quarter, half or all core
intervals using manual splitter.
taken.
• Most 1m samples were dry and weighed
between 1.5 and 2.5kg.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether • Samples from the cyclone were laid out in
sampled wet or dry.
orderly rows on the ground.
For all sample types, the nature,
• Using a hand-held trowel, 4m composite
quality and appropriateness of the
samples were collected from the onesample preparation technique.
meter piles.
Quality control procedures adopted
• These composite samples weighed
for all sub-sampling stages to
between 1.5 and 2.5kg.
maximise representivity of samples. • For any anomalous 4m composite sample
Measures taken to ensure that the
assays, the corresponding 1m sample
sampling is representative of the in
splits will be collected and assayed.
situ material collected, including for
• Quality control of the assaying comprised
instance results for field
the collection of a duplicate samples and
duplicate/second-half sampling.
insertion of industry (OREAS) standards
Whether sample sizes are
(certified reference material) every
appropriate to the grain size of the
twentieth sample.
material being sampled.
• Samples were sent to Bureau Veritas
Laboratory in Perth.
• Samples will be pulverized so that 95% of
the sample passes 75µm.
ASX RELEASE.
Page 8 of 12
Criteria
JORC Code explanation
Commentary
• A representative sample of the pulp will
then be digested with Aqua Regia and
assayed by ICP-MS.
Quality of
• The nature, quality and
• All assaying will be completed by Bureau
assay data and appropriateness of the assaying and
Veritas Laboratory.
laboratory
laboratory procedures used and
• 4m composite samples were assayed by
tests
whether the technique is considered
Aqua Regia with ICP-MS, method AR001.
partial or total.
The detection limit is 1ppb Au.
• For geophysical tools, spectrometers, • REE will be assayed by Aqua Regia with
handheld XRF instruments, etc, the
ICP-MS, method AR102.
parameters used in determining the
• Standards from OREAS were added
analysis including instrument make
every twentieth sample.
and model, reading times,
• The methods used are considered
calibrations factors applied and their
appropriate for this style of mineralization
derivation, etc.
expected.
• Nature of quality control procedures • No density data available.
adopted (eg standards, blanks,
• Bureau Veritas routinely re-assay
duplicates, external laboratory
anomalous assays (greater than 0.3 g/t
checks) and whether acceptable
Au) as part of their normal QAQC
levels of accuracy (ie lack of bias)
procedures.
and precision have been established.
Verification of •
sampling and
assaying
•
•
•
Location of
data points
•
•
•
Data spacing •
and
distribution
•
•
The verification of significant
• No verification of significant intersections
intersections by either independent or was undertaken by independent
alternative company personnel.
personnel, only the site geologist.
The use of twinned holes.
• Validation of 4m composite assay data
involves checking of duplicate and
Documentation of primary data, data
standard assays.
entry procedures, data verification,
data storage (physical and electronic) • Comparison of assay results between the
protocols.
composite samples and the 1m samples
(Fire Assay) will be made.
Discuss any adjustment to assay
data.
• Data is entered into a software program in
a desk top computer for eventual
download into the company database.
Accuracy and quality of surveys used • All Aircore drill hole coordinates are in
to locate drill holes (collar and downGDA94 Zone 51 (Appendix 1).
hole surveys), trenches, mine
• All Aircore holes were located by
workings and other locations used in
handheld GPS with an accuracy of +/- 5m.
Mineral Resource estimation.
• There is no detailed documentation
Specification of the grid system used. regarding the accuracy of the topographic
control.
Quality and adequacy of topographic
control.
• No elevation values (Z) were recorded for
collars.
• There were no downhole surveys
completed because Aircore drill holes
were not drilled deep enough to warrant
downhole surveying.
Data spacing for reporting of
• Aircore holes were spaced at 100m
Exploration Results.
intervals along traverses.
Whether the data spacing and
• Given the first pass nature of the
distribution is sufficient to establish
exploration programs, the spacing of the
the degree of geological and grade
exploration drilling is appropriate for
continuity appropriate for the Mineral
understanding the exploration potential
Resource and Ore Reserve
and the identification of structural controls
estimation procedure(s) and
of the mineralisation.
classifications applied.
• 4m sample compositing has been applied.
Whether sample compositing has
ASX RELEASE.
Page 9 of 12
Criteria
JORC Code explanation
Commentary
been applied.
Whether the orientation of sampling • The relationship between drill orientation
achieves unbiased sampling of
and the mineralised structures is not
possible structures and the extent to
known at this stage as the prospects are
which this is known, considering the
covered by a ~10m blanket of transported
deposit type.
cover.
• If the relationship between the drilling • It is concluded from field observations that
orientation and the orientation of key
the structures and foliation trends ~160
mineralised structures is considered
degrees. Dips are interpreted to be
to have introduced a sampling bias,
approximately vertical.
this should be assessed and reported • Azimuths and dips of Aircore drilling was
if material.
aimed to intersect the strike of the rocks
at right angles.
• Downhole widths of mineralisation are not
known with assays not yet received.
• The measures taken to ensure
• All samples packaged and managed by
sample security.
Catalina personnel up to and including the
delivery of all samples to the laboratory in
Perth.
• The results of any audits or reviews • No sampling techniques or data have
of sampling techniques and data.
been independently audited.
Orientation of •
data in relation
to geological
structure
Sample
security
Audits or
reviews
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
•
tenement and
land tenure
status
Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical sites,
wilderness or national park and
environmental settings.
The security of the tenure held at the
time of reporting along with any known
impediments to obtaining a licence to
operate in the area.
• The Laverton Project is located within
E38/3697.
• Catalina holds several Exploration
Licences in the Laverton area. None are
contiguous with E38/3697.
• The project area was culturally surveyed
and cleared.
• There are no registered cultural heritage
sites within the area.
• E38/3697 is held 100% by Catalina
Resources. All tenements are secured by
the DEMIRS (WA Government).
• All tenements are granted, in a state of
good standing and have no impediments.
• The area southeast of Laverton has been
explored by multiple companies resulting
in the discovery of the Granny Smith Gold
Mine and the Mt Weld REE mine.
• There have been several phases of
Aircore and RC drilling within E38/3697.
Between the Lily Pond Well and
Pendergast South gold prospects drilling
has been conducted by exploration
companies including: Anglogold Ashanti,
Crescent Gold, Acacia, Metex Resources,
Placer Exploration and Sons of Gwalia.
• Previous drilling programs have been
primarily of a reconnaissance style
focused on the Lily Pond Well and
Pendergast South Well areas.
•
Exploration
• Acknowledgment and appraisal of
done by other
exploration by other parties.
parties
ASX RELEASE.
Page 10 of 12
Criteria
JORC Code explanation
Commentary
• Between these gold prospects along the
interpreted strike of the Barnicoat Shear
the drilling has been sparce.
• A small gold resource was discovered at
Lily Pond Well and a supergene gold zone
was discovered at Pendergast Well.
Geology
• Deposit type, geological setting and
style of mineralization.
Drill hole
Information
• A summary of all information material • Appendix 1 provides details on the
to the understanding of the
coordinates and specifications of the
exploration results including a
Aircore holes drilled.
tabulation of the following information • The documentation for drill hole locations
for all Material drill holes:
is shown in the appendices of this
o easting and northing of the drill hole
announcement and is considered
collar
acceptable.
o elevation or RL (Reduced Level –
• Consequently, the use of any data
elevation above sea level in metres)
obtained is suitable for presentation and
of the drill hole collar
analysis.
o dip and azimuth of the hole
• Given the early stages of the exploration
o down hole length and interception
programs, the data quality is acceptable
depth
for reporting purposes.
o hole length.
• The exploration assay results have not yet
• If the exclusion of this information is
been received.
justified on the basis that the
• Future drilling programs will be dependent
information is not Material and this
on the assays received.
exclusion does not detract from the
understanding of the report, the
Competent Person should clearly
explain why this is the case.
• In reporting Exploration Results,
• NA.
weighting averaging techniques,
• At the date of this announcement, drill
maximum and/or minimum grade
sample assay results have not been
truncations (eg cutting of high
received for the Laverton Project.
Data
aggregation
methods
• The Laverton Project is located in the
Laverton Tectonic Zone, a north-south
trending structural domain within the
Archean Yilgarn Craton.
• The eastern half of the zone comprises
predominantly of a sedimentary sequence
with subordinate mafic volcanics and
intrusives.
• The Barnicoat Shear Zone trends in a
NNW direction through the tenement
linking the Ida H, Lily Pond Well and
Pendergast prospect areas.
• There is minor deeply weathered
exposure in the Lily Pond Well area but
the majority of the tenement is covered by
~10m of transported cover that obscures
the bedrock geology.
• A Proterozoic dyke cross cuts the
sequence within the tenement in a NNW
direction and is delineated by a prominent
magnetic signature.
• The sequence is also intruded by the
circular Mt Weld Carbonatite just to the
south of the tenement that hosts REE
mineralization.
ASX RELEASE.
Page 11 of 12
Criteria
JORC Code explanation
•
•
Relationship •
between
mineralisation
widths and
•
intercept
lengths
•
Diagrams
•
Balanced
reporting
•
Other
substantive
exploration
data
•
Further work •
•
Commentary
grades) and cut-off grades are
usually Material and should be
stated.
Where aggregate intercepts
incorporate short lengths of highgrade results and longer lengths of
low- grade results, the procedure
used for such aggregation should be
stated and some typical examples of
such aggregations should be shown
in detail.
The assumptions used for any
reporting of metal equivalent values
should be clearly stated.
These relationships are particularly
• NA
important in the reporting of
• The geometry and extent of any
Exploration Results.
mineralisation and geology will be
provided upon receipt.
If the geometry of the mineralisation
with respect to the drill hole angle is
known, its nature should be reported.
If it is not known and only the down
hole lengths are reported, there
should be a clear statement to this
effect (eg ‘down hole length, true
width not known’).
Appropriate maps and sections (with • At the date of this announcement, drill
scales) and tabulations of intercepts
sample assay results have not been
should be included for any significant received for the Laverton Project.
discovery being reported These
should include, but not be limited to a
plan view of drill hole collar locations
and appropriate sectional views.
Where comprehensive reporting of all • Assays are yet to be received from the
Exploration Results is not practicable, drilling discussed in this announcement.
representative reporting of both low
• Exploration results that may create
and high grades and/or widths should biased reporting have been omitted from
be practiced to avoid misleading
these documents.
reporting of Exploration Results.
• Appendix 1 details Aircore drill hole collar
coordinates and specifications.
Other exploration data, if meaningful • No additional exploration data has been
and material, should be reported
reported.
including (but not limited to):
geological observations; geophysical
survey results; geochemical survey
results; bulk samples – size and
method of treatment; metallurgical
test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious
or contaminating substances.
The nature and scale of planned
further work (eg tests for lateral
• Further drilling in E38/3697 is dependent
extensions or depth extensions or
on the Aircore assay results for this
large-scale step-out drilling).
program that will be available early in Q2
2024.
Diagrams clearly highlighting the
areas of possible extensions,
• Additional targets were generated but not
including the main geological
drilled in the current drill program. Testing
ASX RELEASE.
Page 12 of 12
Criteria
JORC Code explanation
Commentary
interpretations and future drilling
areas, provided this information is not
commercially sensitive.
of these targets will be conducted at a
time to be determined.
Share your feedback
Discover