Kirkalocka Drilling Nears Following Field Success
Released
Released
Announcement PDF
Page 1
Kirkalocka Drilling Nears Following Field Success
HIGHLIGHTS
➢ Initial ~2,200m RC drilling program planned across four priority gold targets, with drilling
targeted to commence following receipt and interpretation of soil assay results.
➢ Systematic evaluation of multiple gold targets surrounding the Kirkalocka Gold Mine
continues to support Catalina's Mid-West Gold growth strategy
➢ Geological mapping and historical rock-chip sampling confirm encouraging gold
mineralisation across multiple target areas.
➢ Historical rock-chip results at Avis include up to 9.89g/t Au.
➢ Historical drilling1
confirms gold mineralisation at Highway and 2 Mile Bore, including 6m
@ 1.79g/t Au from 42m and 1m @ 4.66g/t Au from 34m.
Catalina Resources Limited (ASX: CTN) is pleased to announce an advancement of exploration
activities at its 100%-owned Kirkalocka Gold Project in Western Australia's Mid-West region.
Following the recent acquisition of the Project, Catalina has rapidly progressed from historical data
compilation to active field exploration, with reconnaissance programs completed across four priority
gold prospects: Highway, Capra, Avis and 2 Mile Bore.
An initial RC drilling program of approximately 2,200 metres has been planned across the four priority
targets and will be finalised following receipt and interpretation of the soil assay results.
Executive Director, Ross Cotton, commented:
“Kirkalocka is an important part of our Mid-West Gold strategy of systematically consolidating and
advancing a district-scale gold inventory surrounding the Kirkalocka processing facility. With multiple
priority targets located adjacent to an established gold mine and processing infrastructure, we believe
the Project offers significant exploration upside and a compelling opportunity to build value through
exploration success.
Our priority has been to rapidly transition the Project from historical review to drill-ready targets, and we
have made excellent progress in a short period of time.
The field reconnaissance work combined with historical assay data have delineated priority targets, this
work has allowed us to confidently prioritise drill targets across Highway, Capra, Avis and 2 Mile Bore.
We're keen to get drill rigs turning at Kirkalocka as soon as possible. The work completed to date has
put us in a strong position to move rapidly into drilling, and we expect that to occur in the near-term
following completion of the current soil program, receipt of the and assay results.”
ASX Announcement
8 July 2026
Page 2
Kirkalocka Project Background
The Kirkalocka Gold Project is located within the southern Wydgee–Meekatharra Greenstone Belt and
includes tenure immediately adjacent to the Kirkalocka Gold Mine, which hosts a published Mineral
Resource of approximately 240,000 ounces of gold. The Project is also located adjacent (Figure 1) to
the 2.0Mtpa Kirkalocka Gold Processing Plant, which is being advanced towards recommencement by
Gylden Resources Limited.
Catalina Resources has rapidly advanced exploration activities at Kirkalocka completing initial
reconnaissance across four priority gold targets: Highway, Capra, Avis and 2 Mile Bore (Figure 1). The
program included geological mapping, prospect reviews and rock-chip sampling to assess the
prospectivity of each target and identify opportunities for near-term drill testing.
Figure 1: regional map showing location of soil program at each priority prospect
Highway Prospect
The Highway Target comprises a fold closure interpreted from airborne magnetic data and supported
by geological mapping (Figure 2). An amphibolite unit forms the core of the fold structure and, together
with minor interbedded banded iron horizons represents the primary target horizon.
Page 3
Historical drilling has confirmed the presence of gold mineralisation associated with this amphibolite
sequence.
The target is characterised by a magnetic anomaly associated with a banded iron formation (BIF) within
the fold closure. Previous drilling1
returned encouraging gold intersections, including:
• 6m @ 1.38g/t Au from 27m in hole KKA795; and
• 6m @ 1.79g/t Au from 42m in hole KKA796.
These drillholes are located on either side of the Great Northern Highway. Gold anomalism is
associated with ferruginous saprolite developed from weathered banded iron formation units,
highlighting the potential for structurally controlled gold mineralisation along the fold axis within the
target area.
Figure 2: Highway Prospect Magnetics highlighting the interpreted fold closure and soil sample locations
Page 4
Capra
The Capra target lies on the northwestern flank of the Wydgee syncline.
Previous soil sampling recovered elevated gold values close to a possible offset zone in the syncline
where steeply dipping banded iron and chert formations underlie mafic volcanic units. Brecciated and
pitted quartz and chert were recovered in rock chip samples from close to the contact between the
volcanics and the chemical sediments. This suggests that mineralised fluids may possibly have
intruded along the brittle/ductile contact close to the offset zone in the syncline. Major north-south
faulting controlling the western flank of the syncline lies about 200 metres to the west of the prospect
which could represent an important conduit for mineralised fluids.
While historical drilling has been limited, geological mapping and historical soil geochemistry have
identified several compelling targets that warrant systematic follow-up. Further close-spaced soil
sampling is underway to better define priority targets, with the results to guide the initial RC drilling
program.
Figure 3: Local geological mapping at the Capra prospect and location of planned soils.
Page 5
Avis
The Avis Target is underlain predominantly by high-strain amphibolite, basalt agglomerate and felsic
volcanic units, with a north-south oriented banded iron formation forming the eastern ridge of the
prospect area (Figure 4). Gabbroic units occur along the eastern margin and numerous calcrete
occurrences have also been mapped.
Several historical workings occur within basalt-hosted quartz veins, indicating previous exploration and
mining activity. Structurally, the prospect is characterised by north-south trending wrench-related
structures and a series of east-west and east-northeast fault splays, providing favourable pathways for
fluid movement and gold deposition.
A major barren quartz vein follows the regional NNE-SSW structural trend along the eastern boundary
of the prospect, while transported cover obscures portions of the western and southwestern areas.
Historic rock chip sampling by Mount Magnet South NL (ASX:MUM) in the vicinity of the historical
workings returned significant gold anomalism, including:
➢ 9.89g/t Au (sample 17959);
➢ 2.59g/t Au (sample 18955);
➢ 2.08g/t Au (sample 17954); and
➢ 1.18g/t Au (sample 17956)
Annexure 1 contains full table of rock chip results and location details.
These results support the prospectivity of the Avis Target and warrant further systematic exploration.
Page 6
Figure 4: Local geological mapping at the Avis prospect including planned soils and preliminary drill targets.
2 Mile Bore prospect
The T10 prospect is largely covered by transported material with limited outcrop exposure. The
prospect is dominated by a major north-south trending structure, the Cuddingwarra Shear, which
separates basaltic and felsic volcanic units from migmatites, granitic and gabbroic rocks to the east
(Figure 5).
The primary exploration focus is the prospective basalt-amphibolite sequence adjacent to the main
shear corridor, particularly where northeast-southwest-trending faults offset the main structure. These
structural positions are considered favourable sites for gold mineralisation.
Historical drilling within the broader target area has intersected gold mineralisation associated with
amphibolite and basalt units. Reconnaissance mapping also identified coarse-grained gabbro exposed
along two traverses. Previous drilling1
within medium-grained gabbro in drillhole CWRC-6807800-002
returned:
• 1m @ 4.66g/t Au from 34m; and
Page 7
• 1m @ 0.64g/t Au from 30m.
These results demonstrate the potential for gold mineralisation within both mafic lithologies and
structurally controlled settings adjacent to the Cuddingwarra Shear.
Figure 5: Local geological mapping at the 2 Mile Bore prospect including planned soils and preliminary
drill targets.
Next Steps
Catalina is rapidly progressing the Kirkalocka Gold Project towards drilling. The Company has
completed its historical technical review, target generation and reconnaissance field program with an
initial ~2,200m RC drilling program now planned.
Page 8
Soil sampling and heritage assessment are currently underway. Results from the soil program will be
integrated with historical drilling, geological mapping and geophysical datasets to finalise drill hole
locations with RC drilling expected to commence in the near-term.
Contacts
Investors / Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6188 8181
Click Here leave a question about this announcement and to visit our Investor Hub
This announcement has been authorised for release by the Executive Director, Ross Cotton.
References (ASX)
This Report contains information extracted from ASX market announcements reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code reporting tables
where applicable) of exploration results referred to in this announcement can be found in the following
announcements lodged on the ASX:
1
Refer CTN ASX Announcement 15 June 2026 ASX:CTN - Significant Historic Gold Results Across Mid-
West Portfolio
COMPETENT PERSONS STATEMENT
Newly reported information in this announcement that relates to exploration activities is based on
information compiled by Dr Nishka Piechocka, PhD, Vice President of the Australian Institute of
Geoscientists (AIG) and a full-time employee of Catalina Resources Limited. Dr Piechocka has
sufficient experience relevant to the style of mineralisation and type of deposit under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC
Code). Dr Piechocka consents to the inclusion in the report of the matters based on her information in
the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcement and, in the case of estimates of Mineral
Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed.
The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
Page 9
FORWARD-LOOKING STATEMENTS
This announcement contains forward-looking statements that are subject to a range of risks and
uncertainties. These statements relate to the Company’s expectations, intentions, or strategies
regarding the future.These statements canbe identified by the use of words like “anticipate”,“believe”,
“intend”, “estimate”, “expect”, “may”, “plan”, “project”, “will”, “should”, “seek” and similar words or
expressions containing same. These forward-looking statements reflect the Company’s views and
assumptions with respect to future events as of the date of this release and are subject to a variety of
unpredictable risks, uncertainties, and other unknowns. Actual and future results and trends could
differ materially from those set forth in such statements due to various factors, many of which are
beyond our ability to control or predict. These include, but are not limited to, risks or uncertainties
associated with the acquisition and divestment of projects, joint venture and other contractual risks,
metal prices, exploration, development and operating risks, competition, production risks, sovereign
risks, regulatory risks including environmental regulation and liability and potential title disputes,
availability and terms of capital and general economic and business conditions.
Given these uncertainties, no one should place undue reliance on any forward-looking statements
attributable to the Company, or any of its affiliates or persons acting on its behalf. Subject to any
continuing obligations under applicable law the Company disclaims any obligation or undertaking to
disseminate any updates or revisions to any forward-looking statements in this announcement to
reflect any change in expectations in relation to any forward-looking statements or any change in
events, conditions or circumstances on which any such statement is based.
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development
company whose vision is to create shareholder value through the successful exploration of prospective
gold, base metal, lithium and iron ore projects and the development of these projects into production.
Page 10
APPENDIX A:
Rock chip assay results
Sample_ID Easting Northing Sample Type Date Datum Zone Au g/t
17951 577986 6809373 Rock 2013 GDA94 50 0.01
17952 577987 6809372 Rock 2013 GDA94 50 0.75
17953 577990 6809367 Rock 2013 GDA94 50 0.06
17954 577988 6809362 Rock 2013 GDA94 50 2.08
17955 577987 6809357 Rock 2013 GDA94 50 2.59
17956 577988 6809353 Rock 2013 GDA94 50 1.18
17957 577931 6809339 Rock 2013 GDA94 50 <0.01
17958 578062 6809070 Rock 2013 GDA94 50 0.06
17959 578066 6809074 Rock 2013 GDA94 50 9.89
Page 11
APPENDIX B: JORC CODE, 2012 EDITION - TABLE 1
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Explanation
Sampling techniques · Nature and quality of
sampling (eg cut channels,
random chips, or specific
specialised industry standard
measurement tools
appropriate to the minerals
under investigation, such as
down hole gamma sondes, or
handheld XRF instruments,
etc). These examples should
not be taken as limiting the
broad meaning of sampling.
Rock-chip samples were
collected from outcropping or
sub cropping rock during surface
reconnaissance exploration.
Samples comprised individual
rock-chip specimens collected
from locations considered
prospective for gold
mineralisation. Gold analysis
was undertaken by 40 g fire
assay with AAS finish (FA40AAS).
· Include reference to
measures taken to ensure
sample representivity and the
appropriate calibration of any
measurement tools or
systems used.
· Aspects of the
determination of
mineralization that are
Material to the Public Report.
· In cases where ‘industry
standard’ work has been done
this would be relatively simple
(eg ‘reverse circulation drilling
was used to obtain 1 m
samples from which 3 kg was
pulverised to produce a 30 g
charge for fire assay’). In other
cases more explanation may
be required, such as where
there is coarse gold that has
inherent sampling problems.
Unusual commodities or
mineralization types) may
warrant disclosure detailed
information.
Page 12
Drilling techniques · Drill type (eg core, reverse
circulation, open-hole
hammer, rotary air blast,
auger, Bangka, sonic, etc) and
details (eg core diameter,
triple or standard tube, depth
of diamond tails, face-
sampling bit or other type,
whether core is oriented and if
so, by what method, etc).
No drilling was undertaken.
Results reported are from
surface rock-chip sampling only.
Drill sample recovery · Method of recording and
assessing core and chip
sample recoveries and results
assessed.
Not applicable
· Measures taken to
maximise sample recovery
and ensure representative
nature of the samples.
· Whether a relationship
exists between sample
recovery and grade and
whether sample bias may
have occurred due to
preferential loss/gain of
fine/coarse material.
Logging · Whether core and chip
samples have been
geologically and
geotechnically logged to a
level of detail to support
appropriate Mineral Resource
estimation, mining studies
and metallurgical studies.
Not applicable
· Whether logging is
qualitative or quantitative in
nature. Core (or costean,
channel, etc) photography.
· The total length and
percentage of the relevant
intersections logged.
Sub-sampling techniques
and sample preparation
· If core, whether cut or
sawn and whether quarter,
half or all core taken.
The historical reports do not
describe sample preparation
procedures.
Samples were submitted to
KALASSAY Laboratories for
analysis by 40 g fire assay with
AAS finish.
· If non-core, whether
riffled, tube sampled, rotary
split, etc and whether
sampled wet or dry.
· For all sample types, the
nature, quality and
appropriateness of the
sample preparation
technique.
Page 13
· Quality control procedures
adopted for all sub-sampling
stages to maximise
representivity of samples.
· Measures taken to ensure
that the sampling is
representative of the in situ
material collected, including
for instance results for field
duplicate/second-half
sampling.
· Whether sample sizes are
appropriate to the grain size of
the material being sampled.
Quality of assay data and
laboratory tests
· The nature, quality and
appropriateness of the
assaying and laboratory
procedures used and whether
the technique is considered
partial or total.
Gold was determined by
FA40AAS (40 g fire assay with
AAS finish). Laboratory QA/QC
records indicate certified
reference materials and blank
samples were inserted during
analysis. A certified standard
(ST463) returned 9.57 ppm Au
and the blank returned <0.01
ppm Au, indicating acceptable
laboratory performance
· For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the
parameters used in
determining the analysis
including instrument make
and model, reading times,
calibrations factors applied
and their derivation, etc.
· Nature of quality control
procedures adopted (eg
standards, blanks, duplicates,
external laboratory checks)
and whether acceptable
levels of accuracy (ie lack of
bias) and precision have been
established.
Verification of sampling and
assaying
· The verification of
significant intersections by
either independent or
alternative company
personnel.
· The use of twinned holes.
· Documentation of primary
data, data entry procedures,
data verification, data storage
(physical and electronic)
protocols.
· Discuss any adjustment to
assay data.
Page 14
Location of data points · Accuracy and quality of
surveys used to locate drill
holes (collar and down-hole
surveys), trenches, mine
workings and other locations
used in Mineral Resource
estimation.
Sample locations were recorded
using handheld GPS in GDA94,
MGA Zone 50. Coordinates are
reported in metres.
· Specification of the grid
system used.
· Quality and adequacy of
topographic control.
Data spacing and
distribution
· Data spacing for reporting
of Exploration Results.
Rock-chip sampling was
reconnaissance in nature and
was not undertaken on a
systematic grid.
Sample spacing is irregular and
appropriate only for identifying
areas of anomalous
mineralisation.
· Whether the data spacing
and distribution is sufficient to
establish the degree of
geological and grade
continuity appropriate for the
Mineral Resource and Ore
Reserve estimation
procedure(s) and
classifications applied.
· Whether sample
compositing has been
applied.
Orientation of data in
relation to geological
structure
· Whether the orientation of
sampling achieves unbiased
sampling of possible
structures and the extent to
which this is known,
considering the deposit type.
Rock-chip sampling was
targeting historic workings which
was targeting a mineralised vein.
· If the relationship between
the drilling orientation and the
orientation of key mineralised
structures is considered to
have introduced a sampling
bias, this should be assessed
and reported if material.
Sample security · The measures taken to
ensure sample security.
No information regarding sample
security procedures has been
located.
Audits or reviews · The results of any audits or
reviews of sampling
techniques and data.
No information regarding
independent audits or reviews of
sampling, assaying or database
management has been located
Page 15
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Mineral
tenement
and land
tenure
status
· Type,
reference
name/number,
location and
ownership
including
agreements or
material issues
with third parties
such as joint
ventures,
partnerships,
overriding
royalties, native
title interests,
historical sites,
wilderness or
national park and
environmental
settings.
The historical exploration results reported herein were
completed within tenements comprising the Kirkalocka
Project, located within the Murchison region of Western
Australia. Historical exploration was undertaken by
previous operators, including Equigold NL, Mount Magnet
South Limited and Minjar Gold Pty Ltd. The historical
exploration programmes were conducted on granted
tenements reported to be in good standing at the time of
exploration.
The Company currently holds the relevant project tenure
for tenements E 59/2932, E 59/2699, E 59/2991, and is
not aware of any material environmental, heritage, native
title or other impediments to undertaking exploration
activities within the project area.
· The security
of the tenure held
at the time of
reporting along
with any known
impediments to
obtaining a
licence to
operate in the
area.
Page 16
Exploration
done by
other
parties
· Acknowledgm
ent and appraisal
of exploration by
other parties.
Historical exploration within the Kirkalocka Project area
has been undertaken by several previous explorers,
including Equigold NL, Mount Magnet South Limited and
Minjar Gold Pty Ltd.
Exploration activities completed across the project area
include geological mapping, regolith interpretation, soil
and lag geochemical sampling, aircore drilling, reverse
circulation (RC) drilling and geological logging. Historical
exploration programmes were primarily designed to
assess the gold potential of prospective greenstone belt
stratigraphy, including banded iron formation (BIF), mafic
volcanic and ultramafic units concealed beneath varying
depths of transported cover.
The historical datasets reviewed by the Company
comprise drill collar records, geological logging,
downhole geochemistry and surface geochemical
sampling data. These datasets provide valuable
geological and geochemical information that supports
ongoing target generation, geological interpretation and
prioritisation of future exploration activities.
The Company has compiled and reviewed publicly
available historical exploration data from WAMEX
reports, historical databases and associated technical
documentation.
Historical exploration results referred to in this
announcement have not been independently verified by
the Company and should be regarded as historical in
nature pending further validation work.
Page 17
Geology · Deposit type,
geological setting
and style of
mineralization.
The Kirkalocka project lies on the eastern margin of the
Murchison granite-greenstone province and specifically
at the southern end of the Wydgee - Meekatharra
Greenstone Belt.
In the vicinity of the project, the greenstone belt varies in
thickness from 2.0 to 5.5 kilometres in width. The belt is
elongate and trends in a north south direction.
Lithologies of the Luke Creek Group which include the
Windanning, Gabanintha, Golconda and Murrouli Basalt
are present.
These formations include felsic and mafic volcanics and
banded iron lithologies. Felsic intrusives are also
observed close to the belt boundaries. The orientation of
these rocks is roughly parallel to the marginal contacts.
In this region, the belt has undergone contact
metamorphism to greenschist-amphibolite facies. The
Mt. Magnet Shear runs parallel to the eastern margin
along the length of the belt.
The geological interpretation presented is based on
historical exploration information and has not been
independently validated by Catalina Resources.
Drill hole
Information
· A summary of
all information
material to the
understanding of
the exploration
results including
a tabulation of
the following
information for all
Material drill
holes:
Not applicable
o easting and
northing of the
drill hole collar
o elevation or RL
(Reduced Level –
elevation above
sea level in
metres) of the
drill hole collar
o dip and
azimuth of the
hole
o down hole
length and
Page 18
interception
depth
o hole length.
· If the
exclusion of this
information is
justified on the
basis that the
information is not
Material and this
exclusion does
not detract from
the
understanding of
the report, the
Competent
Person should
clearly explain
why this is the
case.
Data
aggregation
methods
· In reporting
Exploration
Results,
weighting
averaging
techniques,
maximum and/or
minimum grade
truncations (eg
cutting of high
grades) and cut-
off grades are
usually Material
and should be
stated.
Not applicable. Not cut-off all results published.
· Where
aggregate
intercepts
incorporate short
lengths of high
grade results and
longer lengths of
low grade results,
the procedure
used for such
aggregation
should be stated
and some typical
examples of such
aggregations
should be shown
in detail.
Page 19
· The
assumptions
used for any
reporting of metal
equivalent values
should be clearly
stated.
Relationshi
p between
mineralizati
on widths
and
intercept
lengths
· These
relationships are
particularly
important in the
reporting of
Exploration
Results.
No drilling was undertaken. Results reported are from
surface rock-chip sampling only.
· If the
geometry of the
mineralization
with respect to
the drill hole
angle is known,
its nature should
be reported.
· If it is not
known and only
the down hole
lengths are
reported, there
should be a clear
statement to this
effect (eg ‘down
hole length, true
width not
known’).
Diagrams · Appropriate
maps and
sections (with
scales) and
tabulations of
intercepts should
be included for
any significant
discovery being
reported. These
should include,
but not be limited
to a plan view of
drill hole collar
locations and
appropriate
sectional views.
Refer to figures in this report noting that the reported
historical mineralisation at Kirkalocka is distributed
across multiple prospects and drilling programmes over
a broad area. Given the spatial distribution of the
reported results and the absence of sufficient drilling
density to support meaningful sectional interpretation,
plan-view imagery has been presented to illustrate the
location and distribution of historical mineralisation.
Page 20
Balanced
reporting
· Where
comprehensive
reporting of all
Exploration
Results is not
practicable,
representative
reporting of both
low and high
grades and/or
widths should be
practiced to
avoid misleading
reporting of
Exploration
Results.
The Company has reported the most significant results
identified from its review of the historical dataset.
Complete assay results are provided in the
accompanying tables. The Company considers this
reporting to be balanced and representative of the
historical exploration data available for review.
Other
substantive
exploration
data
· Other
exploration data,
if meaningful and
material, should
be reported
including (but not
limited to):
geological
observations;
geophysical
survey results;
geochemical
survey results;
bulk samples –
size and method
of treatment;
metallurgical test
results; bulk
density,
groundwater,
geotechnical and
rock
characteristics;
potential
deleterious or
contaminating
substances.
Not applicable.
Further
work
· The nature
and scale of
planned further
work (eg tests for
lateral extensions
or depth
extensions or
large-scale step-
out drilling).
For Catalina's purposes, this historical work supports the
view the anomalies represent valid targets for modern
reassessment and follow-up exploration. However, no
conclusions regarding economic mineralisation can be
drawn without further validation and drilling.