Half Yearly Report and Accounts
Released
Released
Announcement PDF
C ATA L I N A R E S O U R C E S LT D
ACN 130 618 683
INTERIM FINANCIAL REPORT
FOR THE HALF YEAR ENDED
31 DECEMBER 2023
CATALINA RESOURCES LTD
TABLE OF CONTENTS
Corporate Directory
Directors’ Report
Auditor’s Independence Declaration
Statement of Profit or Loss and Other Comprehensive Income
Statement of Financial Position
Statement of Changes in Equity
Statement of Cash Flows
Condensed Notes to the Financial Statements
Directors’ Declaration
Independent Auditor’s Report
1
2
13
14
15
16
17
18
22
23
CATALINA RESOURCES LTD
CORPORATE DIRECTORY
DIRECTORS
Sanjay Loyalka
Richard Beazley
Michael Busbridge
Martin Bennett (appointed 13/2/2024)
COMPANY SECRETARY
Sanjay Loyalka
REGISTERED OFFICE
Unit 38
18 Stirling Highway
Nedlands
WA 6009
AUDITOR
Stantons
Level 2, 40 Kings Park Road
West Perth WA 6005
SHARE REGISTRY
Boardroom Pty Ltd
Level 8, 210 George Street
Sydney NSW 2000
Page 1
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
Your directors present their report on Catalina Resources Ltd, (“the Company”) for the half year ended 31
December 2023.
DIRECTORS
The names of the directors in office at any time during or since the end of the half year are:
Sanjay Loyalka
Richard Beazley
Michael Busbridge
Martin Bennett (appointed 13/2/2024)
REVIEW OF OPERATIONS AND ACTIVITIES
Highlights
❖
Nelson Bay River Iron Project (DSO Pit)
o
Referral Application (EPBC 2023/09571) validated by DCCEW in August 2023.
➢
o
❖
❖
EPBC 2023/09571 published for public consultation.
Referral decision received in November that the project is a controlled action &
requires further assessment by EIS.
Laverton Project
o
Access agreement concluded with neighbouring parties holding overlapping
miscellaneous licenses, following prolonged negotiations.
o
Prospective Exploration Licence E38/3697 near Laverton granted.
o
Gold, nickel and REE targets have been identified.
o
Approval for planned drilling at Exploration Licence E38/3697 granted by Department
of Mines (DMIRS).
o
Aboriginal heritage survey completed for E38/3697 and E38/3698.
o
Air Core drilling scheduled for first quarter of calendar year 2024.
o
E38/3697 is located:
➢
adjacent to the Mt Weld Intrusive Carbonatite REE complex, a major source
of critical metals and Australia’s only producing REE mine; and
➢
along strike of Pelican Laterite Nickel Resource; and
➢
along strike of Barnicoat Shear Zone, host to multiple gold deposits along its
length including Mon Ami, Ida H and Barnicoat
Lachlan Fold Belt Project
o
Pursuing actions to enable consideration of revoking of the suspension at EL9155,
Rock Lodge Project:
➢
o
Regulator has conveyed acceptance of following activities:
▪
Independent review of compliance systems.
▪
Biodiversity Assessment.
Resources Regulator, NSW has in July 2023 accepted the Mining Act Enforceable
Undertaking (“EU”) by Catalina Resources Ltd to conclude investigations and
enforcement actions in connection with the alleged breaches at EL9155. All agreed
commitments completed.
Page 2
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
❖
Dundas Project
o
❖
Working with DBCA for finalisation of Conservation Management Plan (CMP) to enable
further exploration.
Business Development
o
Catalina is continuing to actively identify and assess exploration and early
development opportunities in Lithium, Rare Earths, Gold and Base Metals projects.
Nelson Bay River Iron Project (DSO pit)
Catalina Resources (“Catalina” or “the Company”) made a EPBC referral application of the project in June
2023 as per advice received from the Department of Climate Change, Energy, the Environment and Water
(“DCCEEW” or “the Department”) to undertake completion of a partially mined DSO open-cut pit and
associated activities to allow for extraction and sale of hematite ore in north-west Tasmania (EPBC
2023/09571). Following Public consultation, the Department has advised the Company in November 2023
that a delegate of the Minister has decided that the proposed action is a controlled action, requiring further
assessment under the EPBC Act 1999. The delegate has also decided, under section 87 of the EPBC Act, that
the proposed action will be assessed by an Environmental Impact Statement (EIS). The Company is following
up with Department for issue of the finalised tailored EIS guidelines. These guidelines are to be used to
develop the draft EIS. Details on the assessment process are set out in the Department’s website as EPBC Act
- Environment Assessment process fact sheet.
NBR Project (Mining Lease 3M/2011) is located in the far north-west of Tasmania and is approximately 150km
from the Burnie Port. The Project is within an established mineral province in the region. Operating mines
include Grange Resources’ (ASX: GRR) Savage River Iron Ore.
The Direct Shipping Ore (DSO) project at NBR is an all-contract mining, processing and haulage operation
using local contractors in the region. It requires no major processing beyond crushing and screening after
which the ore is then trucked to the port and shipped. It was developed in 2013 with the first shipment of ore
leaving the Port of Burnie in January 2014. NBR project was placed on care and maintenance in June 2014
following sharp iron ore price falls.
Historical production from the previous mining campaign totalled 181,000 tonnes shipped with average
grades of Fe 57.5%, SiO2 7.7%, Al2O3 1.3%, P 0.07% and S 0.04%. The historic price received for NBR ore was
enhanced with premiums (in line with market benchmarks) for
•
low Alumina; and
•
Lump. (About 40% of the DSO Iron ore at NBR is Lumps with Iron ore Fines being approx. 60%)
Historic costs during FY2014 when the mine was last in production was approximately AUD $72 per tonne
FOB Burnie Port (as derived from 2014 Annual Report to Shareholders).
Laverton Project
During the quarter, Exploration Licence, E38/3697 and E38/3698 in the Laverton district of WA were granted
after the successful completion of the following access agreements as reported in previous Company reports.
•
Heritage agreement with NTS Goldfields Limited as agent for the Nyalpa Pirniku, the native
title party.
•
Access agreement with GSM Mining Company Pty Ltd, a wholly owned subsidiary of Gold
Fields Ltd.
•
Access agreement with Focus Minerals (Laverton) Pty Ltd
Page 3
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
•
Access agreement with Murrin Murrin Operations Pty Limited
•
Access agreement with Mt Weld Mining Pty Ltd
During the period, the Company also received approval for a Programme of Work (PoW) at its Exploration
Licence E38/3697 in the Laverton district of WA. Aboriginal heritage surveys have been completed for
Exploration Licence E38/3697 & E38/3698, during the period. An Aircore drilling program has been scheduled
for the first quarter of calendar year 2024 to test targets on E38/3697.
E38/3697 (see Figure 1) is a ~45km2 (15 sub-block tenement) located 20km southeast of Laverton within the
Laverton Gold Province, an exceptionally well mineralised terrain in the Eastern Goldfields, Western Australia.
The region hosts several world class deposits of gold, nickel, and rare earth element (REE) including Sunrise
Dam (>10Moz Au), Wallaby (> 8Moz Au), Windara Nickel (combined 85K tonnes nickel sulphide) and the Mt
Weld REE deposit, one of the highest-grade rare-earth deposits in the world (Mineral Resource of 54.7 Mt @
5.3% TREO).
Figure 1: Location map of Catalina’s E 38/3697 and other tenements in the Laverton Gold Province.
Catalina has identified several very compelling target areas with potential for gold, nickel and REE
mineralization within E38/3697. The targets were generated by the integration of detailed aeromagnetic
images, geological interpretations, ground gravity images and historical exploration data. Reference was also
made to genetic models developed for neighbouring mineral deposits. The compilation revealed that
historical drilling within the tenement has been sporadic and non-systematic with significant geochemical
anomalies not followed up. Geophysical consultants Southern Geoscience completed additional processing
Page 4
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
and modelling of the aeromagnetic data to improve understanding of the lithological and structural setting of
the targets generated. Modelling was also conducted on discrete magnetic anomalies that could represent
small carbonatitic bodies related to the large carbonatite intrusion at the nearby Mt.Weld REE deposit. Much
of the tenement is covered by alluvium and colluvium with only a small area of outcrop in the northwest
corner. This has hindered the verification of targets, placing greater emphasis on detailed analysis, modelling
and drilling..
Figure 2: Exploration summary of E38/3697. Targets exist for three commodity groups: Au (the Barnicoat
Shear Zone), Ni (Pelican Ultramafic Belt, marked by holes LPR021 & LPR023) and REEs (magnetic anomalies
with possible carbonatite source rocks).
Page 5
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
A summary of the targets generated by the compilation, modelling and interpretation of data is given in
Figures 2 and 3 below. Drill targets exist for 3 commodity groups as listed below.
1.
Nickel sulphides. Historical RAB holes LPR021 and LPR023 intersected anomalous nickel
geochemistry within the Pelican Ultramafic Unit, southwest of the Pelican Laterite Nickel
resource (Figure 2).
2.
Shear zone hosted gold within the Barnicoat Shear Zone, southeast of the Lily Pond Well Gold
resource (Figure 2) and along strike of the Ida H and Mon Ami resources.
3.
REEs. Eight possible Mt Weld style magnetic carbonatitic bodies (Anomalies A to H) related to the
large carbonatite intrusion at the nearby Mt.Weld world class REE deposit (Figure 3).
Figure 3: Catalina Laverton Project E38/3697 (red) showing area modelled by Southern Geoscience
Consultants (blue) and the targeted discrete magnetic anomalies (underlying image is the 1VD of RTP
aeromagnetic data).
Page 6
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
Lachlan Fold Belt Project
Rock Lodge EL9155
The Company is pursuing Resources Regulator NSW for revoking the suspension at Rock Lodge EL9155.
Resources Regulator, NSW has conveyed acceptance of the following activities:
•
Independent review of compliance systems.
•
Biodiversity Assessment.
Additionally, the Company also finalised negotiations with the Regulator for the conclusion of investigations
and enforcement actions in connection with the alleged breaches and suspension at Rock Lodge EL9155.
Consequently, the Resources Regulator, NSW, in July 2023, accepted the Mining Act Enforceable Undertaking
(“EU”) by Catalina Resources Ltd, including a minimum expenditure of $141,964 in carrying out terms of the
EU, aimed at delivering benefits in relation to the management of the title, industry and community. All the
commitments have been completed during the period.
The EU includes the following text:
“Catalina Resources Ltd reiterates its submissions on 23 May 2022 and 16 June 2022 in particular:
a) The alleged contraventions were not caused by Catalina Resources Ltd, rather by Rangott
Mineral Exploration Pty. Limited who had extensive mining exploration experience, and who had
been engaged to supervise and manage the works as a result of COVID-19 travel restrictions;
and
b) Catalina Resources Ltd took all reasonable steps practically possible to prevent any
contravention and met its obligations of environmental care under the Mining Act.
Catalina Resources Ltd as the holder of EL9155 accepts ultimate responsibility for the aforesaid alleged
contraventions. Catalina Resources Ltd seeks to enter into this enforceable undertaking to jointly carry
out strategies with Rangott Mineral Exploration Pty. Limited to carry out rectification activities in respect
of the alleged contraventions.
Rangott Mineral Exploration Pty. Limited has accepted the responsibility for the alleged contravention
under the aid and abet the commission of an offence - section 378EA of the Mining Act 1992 and offered
a separate enforceable undertaking committing to a minimum of $87,500 to deliver benefits in relation to
the management of the title, industry and community.”
Catalina’s RC drilling in 2022 intersected a wide zone of stacked vertical lenses of polymetallic mineralisation
at Rock Lodge. For example, RC hole SRLRC005 intersected 4 significant mineralised zones over a width of
24m, from 75m to 99m (including 2m @ 2.13 g/t Au & another 2m @ 2.12 g/t Au). At the end of hole, 102m,
rocks were still pervasively hydrothermally altered (pyrite, silica, sericite) suggesting that additional downhole
zones may have been intersected if excessive water flows had not stopped drilling. West of SRLRC05,
Catalina’s drilling intersected mineralisation in SRLRC02 (8m @ 1.08 g/t Au including 3m @ 2.12 g/t Au),
illustrated in figure 4. The intersections from Catalina’s drill holes SRLRC02 to SRLRC05 and also the historical
drilling, including MYRC01, constitute a very wide (60m) mineralised envelope of stacked vertical lenses of
significant polymetallic sulphide at Rock Lodge. Two hundred meters to the north, IP anomalies and similar
anomalous rock chip geochemical signatures suggest the mineralisation envelope may be continuous at least
to this area. As the mineralised envelop is open in all directions further drilling focusing on the continuity,
depth and lateral extent of the stacked veins is now a very high priority and represents an exciting drill target.
Page 7
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
Figure 4
After the lifting of the suspension, the Company plans to drill two or three deeper angled diamond drill holes
beneath previously drilled RC holes, illustrated in figure 4. Down Hole Electro Magnetic Surveys (DHEM) will
also be employed, searching for off-hole conductors, which may represent wider massive sulphide
mineralisation than what has already been found in the RC drilling. Additionally, diamond drilling will enable
the collection of orientated structural data, including dips and strikes of mineralised veins, necessary for
future drill hole planning and calculations of the true widths of mineralisation.
Page 8
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
Dundas Project
During the period, the Company continued working with DBCA for finalisation of Conservation Management
Plan (CMP) to enable further exploration. The CMP contains details for the next phase of exploration
including deeper drilling on the two existing granted ELs (“exploration licences”) in the Dundas project and
exploration plans for the two ELAs (“exploration licence applications).
A 105-hole air core drill program was completed at the Dundas Project in December 2022 for a total of
2,909m with an average depth of 27.7m. A 6-20m blanket of transported colluvium and lake clays overlies
and masks the bedrock geology. To look below this blanket air core drilling successfully intersected
geochemical and lithological information of the bedrock. Essentially the air core work has identified the
geochemical halo to a potentially larger target at depth. Deeper RC drilling will be planned to drill underneath
and along strike of these air core anomalies. Significant REE intersections include:
o
6m @ 0.6% TREO from 16 – 22m in hole 22DAC066, including.
•
2m @ 1.02% TREO from 16-18m, includes 0.23% Nd₂O₃, 0.42% Ce₂O₃, 223 ppm Dy₂O₃,
0.12% La₂O₃.
o
3m @ 0.92% TREO from 22 – 25m in hole 22DAC095, including.
•
1m @ 1.8% TREO, includes 0.35% Nd₂O₃, 0.75% Ce₂O₃, 284 ppm Dy₂O₃, 0.31% La₂O₃.
The assays display an ‘exceptional’ critical magnet metal (NdPr+DyTb) ratio of 24% to total TREOs. These four
HREEs are the core ingredients for the manufacturing of permanent magnets which are used in electric
motors and generators. The growth in permanent magnets is attributed to increased use in the automotive
industry and electric vehicle drivetrains.
Figure 5. Summary of the highlights of resplit assays from air core drilling.
Page 9
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
The Dundas Project area is situated within the inferred SE extensions of the mineralised Norseman – Wiluna
Belt of the Archaean Yilgarn Craton and comprises a tectonostratigraphic assemblage of mafic, ultramafic and
sedimentary dominated units. A major northwest trending fault system transects the tenements and may
represent the prospective Boulder-Lefroy Fault Zone (BLFZ) and the Zuleika Shear Systems (ZS). These shears
and faults are highly prospective for gold (Swager et al., 1995). The tenements are also prospective for lithium
mineralisation, being only 25 kms to the southwest of Liontown’s Buldania Lithium Project, also along the
Zuleika Shear Zone. Field work and historical drill hole reporting has confirmed the presence of pegmatites
within Catalina’s tenements.
Business Development
Catalina is continuing to identify and assess exploration and early development opportunities in Lithium, Rare
Earths, Gold and Base Metals projects. As previously reported, the Company has successfully built up an
exciting portfolio of exploration projects in world class mineral provinces. These exploration
tenements/projects acquired are at an early stage and the Company is systematically completing the initial
steps of access agreements, heritage agreements, surveys and desktop studies to enable the advancement of
exploration activity.
Outlook
The Company has built up an exciting portfolio of Exploration projects. These projects have not benefited from
modern exploration techniques, in an emerging area which has an established reputation as a world-class
mineral province. The Company remains committed to driving value for Shareholders as it continues to
progress exploration on these projects.
Competent Person Statement
The review of historical exploration activities and results contained in this report is based on information
compiled by Michael Busbridge, a Member of the Australian Institute of Geoscientists and a Member of the
Society of Economic Geologists. He is a Director of Catalina Resources Ltd. He has sufficient experience which is
relevant to the style of mineralisation and types of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code).
Michael Busbridge has consented to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information in the original reports, and that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original reports.
Where the Company refers to the Mineral Resources in this report, it confirms that it is not aware of any new
information or data that materially affects the information included in that announcement and all material
assumptions and technical parameters underpinning the Mineral Resource estimate with that announcement
continue to apply and have not materially changed.
Page 10
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
Tenements
• The mining tenements held at the end of period and their location.
Mine
Lease/
Locality
Remarks
Exploration
License
3M/2011
ML
Nelson Bay River
100% Catalina Resources Ltd
E40/378
EL
Golden Chimney
100% Catalina Resources Ltd
E63/2046
EL
Dundas
100% Catalina Resources Ltd
E63/2048
EL
Dundas
100% Catalina Resources Ltd
E63/2136
ELA
Dundas
100% Catalina Resources Ltd
E63/2227
ELA
Dundas
100% Catalina Resources Ltd
EL9155
EL
Rock Lodge
100% Catalina Resources Ltd
EL9346
EL
Oak Hill
100% Catalina Resources Ltd
E38/3677
EL
Laverton
100% Catalina Resources Ltd
E38/3697
EL
Laverton
100% Catalina Resources Ltd
E38/3698
EL
Laverton
100% Catalina Resources Ltd
E38/3726
EL
Laverton
100% Catalina Resources Ltd
P38/4554
EL
Laverton
100% Catalina Resources Ltd
P38/4555
EL
Laverton
100% Catalina Resources Ltd
P38/4556
EL
Laverton
100% Catalina Resources Ltd
E63/2269
ELA
Dundas
100% Catalina Resources Ltd
E63/2270
ELA
Dundas
100% Catalina Resources Ltd
E38/3847
ELA
Laverton
100% Catalina Resources Ltd
Note: ML= Mining Lease; EL = Exploration Licence; ELA= Exploration Licence Application.
•
The mining tenement interests relinquished during the period and their location
o E40/384
o Withdrawal of ELAs E38/3771 & E38/3772 following grant of E38/3697
& E38/3698
•
The mining tenements interests acquired and disposed of during the period and their location
o
Grant of E38/3697 & E38/3698
•
The beneficial percentage interests held in farm-in or farm-out agreements at the end of the period
Nil
•
The beneficial percentage interests in farm-in or farm-out agreements acquired or disposed of
during the period
Nil
Page 11
CATALINA RESOURCES LTD
DIRECTORS’ REPORT
SUBSEQUENT EVENTS
There are no items, transactions or events of a material and unusual nature likely, in the opinion of the
Directors, to affect significantly, the results of those operations, or the state of affairs of the Company in future
financial years.
RESULT OF OPERATIONS
The net loss for the period was $519,065 (31 December 2022: $872,171). The loss was mainly due to:
a)
Impairment of exploration asset of $111,573 (31 December 2022: $115,590) due to the surrender of
one tenement E40/384 (Ulysses South), and review of exploration plans at EL9346 (Oak Hill) due to
difficulty with land access due to resistance by landowners in the region, the management do not
currently expect to incur any further expenditure on Exploration & Evaluation in this area.
b) Loss of $ 171,000 (31 December 2022: $237,500) on fair valuation of MetalsGrove Mining Ltd’s (MGA)
4,750,000 shares held by the Company at $0.074 being the closing price of MGA shares on 31/12/2023
on ASX.
FINANCIAL POSITION
The net assets of the Company are $ 5,366,643 as at 31 December 2023 (30 June 2023: $5,885,707).
AUDITOR’S INDEPENDENCE DECLARATION
The lead auditor’s independence declaration under section 307C of the Corporations Act 2001 is set out on
page 13 for the half-year ended 31 December 2023.
Sanjay Loyalka
Executive Chairman
26th February 2024
Page 12
PO Box 1908
West Perth WA 6872
Australia
Level 2, 40 Kings Park Road
West Perth WA 6005
Australia
Tel: +61 8 9481 3188
Fax: +61 8 9321 1204
ABN: 84 144 581 519
www.stantons.com.au
26 February 2024
Board of Directors
Catalina Resources Limited
Unit 38, 18 Stirling Highway
Nedlands WA 6009
Dear Sirs
RE:
CATALINA RESOURCES LIMITED
In accordance with section 307C of the Corporations Act 2001, I am pleased to provide the following declaration
of independence to the directors of Catalina Resources Limited.
As Audit Director for the review of the financial statements of Catalina Resources Limited for the half-year ended
31 December 2023, I declare that to the best of my knowledge and belief, there have been no contraventions of:
(i)
the auditor independence requirements of the Corporations Act 2001 in relation to the review; and
(ii)
any applicable code of professional conduct in relation to the review.
Yours faithfully
STANTONS INTERNATIONAL AUDIT AND CONSULTING PTY LTD
(An Authorised Audit Company)
Eliya Mwale
Director
Liability limited by a scheme approved under Professional Standards Legislation
Stantons Is a member of the Russell
Bedford International network of firms
CATALINA RESOURCES LTD
STATEMENT OF PROFIT OR LOSS & OTHER COMPREHENSIVE INCOME
FOR THE HALF YEAR ENDED 31 DECEMBER 2023
31-Dec-23
$
31-Dec-22
$
78,894
47,187
Care and maintenance
(27,667)
(25,921)
Depreciation expense
(7,058)
(5,633)
Finance charges
(7,434)
(6,444)
Employee and consulting fees (incl valuation of Directors
Options)
(186,864)
(218,435)
Regulatory costs
(13,964)
(21,933)
Occupancy and communication
(9,793)
(11,494)
(3)
2
(Loss) on fair valuation of financial assets
(171,000)
(237,500)
Accounting and legal Fees
(40,608)
(20,274)
Exploration impairment
(111,573)
(115,590)
-
(231,070)
Other expenses
(21,995)
(25,066)
(Loss)/ Profit before income tax
(519,065)
(872,171)
-
-
(519,065)
(872,171)
-
-
(519,065)
(872,171)
Basic (Loss)/ Profit cents per share
(0.04)
(0.07)
Diluted (Loss)/ Profit cents per share
(0.04)
(0.07)
Note
Revenue from continuing operations
Interest Income
Expenses from continuing operations
Foreign exchange gain/(loss)
Provision for impairment of mine development
Income tax
(Loss)/ Profit for the year
Other comprehensive income
Total Comprehensive (Loss)/ Profit for the period
(Loss)/ Profit per share for attributable to ordinary equity
holders of the company:
The above statement of profit or loss and other comprehensive income should be read in conjunction with the
accompanying notes.
Page 14
CATALINA RESOURCES LTD
STATEMENT OF FINANCIAL POSITION AS AT 31 DECEMBER 2023
31-Dec-23
30-Jun-23
$
$
165,080
412,216
Bank term deposits
2,858,100
3,158,100
Other receivables
76,496
110,529
Prepayments
22,283
29,569
3,121,958
3,710,414
Financial assets at fair value
351,500
522,500
Exploration and evaluation
2,003,487
1,955,013
Mine development
47,273
22,902
Right- of- Use Asset
26,300
32,370
846,213
838,700
3,711
4,697
Total Non-Current Assets
3,278,484
3,376,182
Total Assets
6,400,442
7,086,596
163,248
171,389
5,780
11,191
15,214
168,865
825
711
185,067
352,156
21,732
21,732
827,000
827,000
848,732
848,732
Total Liabilities
1,033,799
1,200,888
Net Assets
5,366,643
5,885,708
Contributed equity
25,695,326
25,695,326
Reserves
1,015,858
1,015,858
(21,344,541)
(20,825,476)
5,366,643
5,885,708
Note
Assets
Current Assets
Cash and cash equivalents
Total Current Assets
Non-Current Assets
Restricted cash
4
Plant and equipment
Liabilities
Current Liabilities
Trade and other payables
8
Lease liability
Provisions and accruals
9
Provision for employee entitlement
Total Current Liabilities
Non-Current Liabilities
Lease liability
Rehabilitation provision
4
Total Non-Current Liabilities
Equity
Accumulated (losses)
Total Equity
The above statement of financial position should be read in conjunction with the accompanying notes.
Page 15
CATALINA RESOURCES LTD
STATEMENT OF CHANGES IN EQUITY FOR THE HALF YEAR ENDED 31 DECEMBER 2023
Contributed
Equity
$
BALANCE AT 1 JULY 2022
25,695,326
Total comprehensive loss for the period
-
Shares issued during the half year
$
1,015,858
-
7,317,241
(872,171)
-
-
-
-
-
-
-
-
-
25,695,326
(20,266,114)
1,015,858
6,445,070
25,695,326
(20,825,476)
1,015,858
5,885,708
-
(519,065)
-
(519,065)
-
-
-
-
-
-
-
-
25,695,326
(21,344,541)
1,015,858
5,366,643
Shares issued during the half year
Options issued during the half year
BALANCE AT 31 DECEMBER 2023
$
-
Total comprehensive loss for the period
Capital raising costs
(872,171)
Total
-
Capital raising costs
BALANCE AT 1 JULY 2023
(19,393,943)
Reserves
-
Options issued during the half year
BALANCE AT 31 DECEMBER 2022
Accumulated
Losses
$
The above statement of changes in equity should be read in conjunction with the accompanying notes.
Page 16
CATALINA RESOURCES LTD
CASH FLOW STATEMENT FOR THE HALF YEAR ENDED 31 DECEMBER 2023
31-Dec-23
$
31-Dec-22
$
Payments to suppliers and employees (inclusive of GST)
(454,009)
(367,359)
Interest received
103,245
47,187
Note
Cash flows from operating activities (including exploration)
Other income
(350,764)
(320,172)
Payment for plant and equipment
-
-
Payment for mineral exploration
(165,401)
(443,777)
Payment for mine development
(24,371)
(47,459)
Net cash (outflow) from investing activities
(189,772)
(491,236)
-
-
(6,600)
(5,253)
-
-
(6,600)
(5,253)
Net cash (used in) operating activities (including exploration)
Cash flows from investing activities
Cash flows from financing activities
Proceeds from issues of shares and options
Repayment of lease liability
Payments for share issue costs
Net cash (used in) by financing activities
Net (decrease) in cash and cash equivalents
Cash and cash equivalents at the beginning of the financial
period
(547,136)
(816,661)
3,570,316
5,079,700
Cash and cash equivalents at the end of the financial year
(including bank term deposits)
3,023,180*
4,263,039
* The balance of cash and cash equivalents in the Statement of Cash Flows includes cash at bank $165,080
and short-term bank deposits $2,858,100.
The above cash flow statement should be read in conjunction with the accompanying notes.
Page 17
CATALINA RESOURCES LTD
CONDENSED NOTES TO THE FINANCIAL STATEMENTS
NOTE 1: STATEMENT OF SIGNIFICANT ACCOUNTING POLICIES
The principal accounting policies adopted in the preparation of the financial report are set out below. These
policies have been consistently applied to the financial period.
(A) BASIS OF PREPARATION
The half-year financial statements are a general-purpose financial report prepared in accordance with the
requirements of the Corporations Act 2001, Australian Accounting Standard AASB 134: Interim Financial
Reporting, Australian Accounting Interpretations and other authoritative pronouncements of the Australian
Accounting Standards Board. Compliance with Australian Accounting Standard ensures compliance with
International Financial Reporting Standards IAS 34 Interim Financial Reporting.
It is recommended that this financial report be read in conjunction with the annual financial report for the year
ended 30 June 2023 and any public announcements made by Catalina Resources Ltd during the half-year in
accordance with continuous disclosure requirements arising under the Corporations Act 2001.
The accounting policies have been consistently applied by the Company and are consistent with those in the
annual financial report for the year ended 30
Share your feedback
Discover