Corporate Presentation
Released
Released
Announcement PDF
Corporate Presentation
November 2024
Disclaimer and compliance statement
•
This presentation contains only a brief overview of Catalina Resources Ltd (“Catalina“ and/ or “the Company” ) and its activities and operations. The contents of this presentation, including matters relating
to the geology of the Company’s projects, may rely on various assumptions and subjective interpretations which it is not possible to detail in this presentation and which have not been subject to any
independent verification.
•
This presentation contains a number of forward-looking statements. Such statements may include, but are not limited to, statements with regard to intention, capacity, future production and grades,
projections for sales growth, estimated revenues and reserves, targets for cost savings, the construction cost of new projects, projected capital expenditures, the timing of new projects, future cash flow and
debt levels, the outlook for minerals and metals prices, the outlook for economic recovery and trends in the trading environment. Known and unknown risks and uncertainties, and factors outside of the
Company’s control, may cause the actual results, performance and achievements of Catalina to differ materially from those expressed or implied in this presentation.
•
The information contained in this presentation is not a substitute for detailed investigation or analysis of any particular issue. Current and potential investors and shareholders should seek independent
advice before making any investment decision in regard to Catalina or its activities.
•
The Company confirms that it is not aware of any new information or data that materially affects the information in the original reports, and that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original reports. Where the Company refers to the Mineral Resources and Ore Reserve Estimates in this report, it confirms that it is not
aware of any new information or data that materially affects the information included in the original reports and all material assumptions and technical parameters underpinning the Mineral Resource
estimate and Ore Reserve Estimates the original reports continue to apply and have not materially changed.
•
This Presentation contains information extracted from Catalina resources Ltd’s ASX market announcements reported in accordance with the 2012 edition of the “Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves” (“2012 JORC Code”). Details of these are listed in the references section of this presentation. These announcements are available for viewing on the
Company’s website. The Company confirms that it is not aware of any new information or data that materially affects the information included in any original ASX announcement.
•
NOT AN OFFER
•
This presentation is for information purposes only. The presentation does not comprise a prospectus, product disclosure statement or other offering document under Australian law or any other law. This
presentation does not constitute or form part of any invitation, offer for sale or subscription or any solicitation for any offer to buy or subscribe for any securities in Catalina Resources Ltd.
•
NO LIABILITY
•
Catalina Resources Ltd has prepared this document based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the fairness, accuracy
or completeness of the information, opinions and conclusions contained in this presentation , nor the future performance of Catalina, and will not be responsible for any loss or damage arising from the use of
the information. To the maximum extent permitted by law, Catalina Resources Ltd, its related bodies corporate and the officers, directors, employees, advisers and agents of those entities do not accept any
responsibility or liability for any loss arising from the use of the presentation or its contents or otherwise arising in connection with it.
Corporate Overview
•
Shares on issue* ~ 1,238 m
•
Options* ~ 32.5 m
•
Cash* ~A$ 2.65 m
•
Investments * *(MGA shares ~A$ 0.3 m)
•
Market Capitalisation * * ~A$ 4.33 m
* as at 30/09/2024
* * as at 15/11/2024
* * * as at 15/11/2024
▪
Sanjay Loyalka, FAIM, ACA, B.Com (Hons)
Chairman
➢
30 years’ experience in Metals and Mining - Corporate Finance, Commercial and General
Management.
➢
Former roles have included Founder CEO of Aditya Birla Minerals Ltd responsible for acquisition of
Nifty and Mt Gordon Copper mines and development of Nifty Sulphide project (2.5 mtpa
underground copper mine, concentrate plant and infrastructure)
➢
Founder Chairman and CEO of Catalina Resources Ltd
▪
Mr Richard Beazley, B.E. (Mining) (Hons), MBA, MAICD, MAusIMM (CP) Director
➢
Highly experienced mining engineer with a strong technical background and substantial
experience in corporate and operational management and leadership
➢
Non-Executive Chair - Nova Minerals Ltd ; Non-Executive Chair - MetalsGrove Mining Limited
➢
Previous roles include Chief Operating Officer for Sandfire Resources ; Managing Director for Peak
Resources; General Manager Operations at Consolidated Minerals; General Manager Southern
Cross Operations at St Barbara Limited
▪
Michael Busbridge, MBA., B.Sc. (Hons.), MAIG. MSEG
Director
➢
Exploration and resource development geologist with over 35 years' experience in Australia
▪
Martin Bennett, BSc (Hons), MODG, MAIG
Director
➢
Exploration and resource development geologist with over 30 years' experience in Australia,
Africa, Canada and SE Asia.
➢
Former roles include General Manager Exploration for Endeavour Mining Corporation (West
Africa) (TSX: EDV), Exploration Manager Aditya Birla Minerals , Exploration Manager BCI Minerals
Project Portfolio
NB: Kookynie West not shown in figure above as is under sale agreement with Kobold Metals
Laverton Project
•
Located within the Laverton Gold Province, an exceptionally well mineralised terrain in the Eastern Goldfields,
Western Australia.
•
The region hosts several world class deposits of gold, nickel, and rare earth elements (REE) including Sunrise Dam
(>10Moz Au10), Granny Smith (>8Moz Au10), Windara Nickel (combined 85 kt of nickel sulphide) and the Mt Weld REE
deposit (Mineral Resource of 54.7 Mt @ 5.3% TREO10).
Laverton Project
•
Aircore drilling in March 2024 & September 2024 by Catalina
intersected broad zones of gold mineralization in the supergene
(oxidized) zone
•
Mineralized gold intervals returned best results including 6,10 :
➢
LVAC049
44m @ 1.01g/t Au from 44m
(includes 4m @ 2.22g/t Au,
4m @ 1.96g/t Au and
8m @ 1.45g/t Au)
➢
LVAC009
1m @ 2.42g/t Au from 75m
➢
LVAC012
3m @ 1.07g/t Au from 49m
•
The main gold target is located on an interpreted splay fault of the
Barnicoat Shear that hosts gold resources to the north at Mon Ami
(55k ozs Au6), Ida H (27.9k ozs Au6) and Lily Pond Well (15k ozs Au6).
•
The supergene gold anomaly is 300m by 200m and is open to the
north and south.
•
Planning has commenced for a follow up RC program in early 2025
that will test for mineralization in fresh rock below the supergene
gold anomaly.
➢ POW approval received
•
Additional aircore drilling is also required to follow this new gold
trend that is open along strike to the north and south.
Laverton Project
•
Catalina aircore drilling also targeted point source magnetic
anomalies considered to be shallow mafic to ultramafic intrusions
prospective for REE mineralization. The Mt Weld REE mine is just
5km to the south.
•
Mineralized REE intervals returned best results including 6,10 :
➢
LVAC023
3m @ 6,794ppm TREO from 28m
(includes 1m @ 16,426ppm TREO)
➢
LVAC022
1m @ 2,633ppm TREO from 37m
➢
LVAC022
5m @ 2,777ppm TREO from 52m
➢
LVAC009
1m @ 7,220ppm TREO from 43m
➢
LVAC009
4m @ 2,506ppm TREO from 75m
➢
LVAC026
8m at 2,350ppm TREO from 24m
➢
LVAC037
8m at 6,132ppm TREO from 48m
➢
LVAC044
4m at 6,632ppm TREO from 64
Lachlan Fold Belt Project
Rock Lodge
•
The project is located in the Lachlan Fold Belt, a high-profile mining and exploration
region that contains several major gold, copper-gold and silver deposits. These include
Newcrest Mining Ltd’s Cadia-Ridgeway Mine, Evolution Mining Ltd’s Lake Cowal Mine,
and Alkane Resources Ltd’s Tomingley mine.
•
The prospect contains several historic workings along a low ridge with extensive
indications of alteration and mineralization at the surface supported by geochemical
surveys.
•
An induced polarization (IP) survey identified several strong chargeability anomalies
coincident with the workings.
•
Soil sampling conducted by Catalina highlighted a gold anomaly 450m x 100m centred
on a best result of 1.29 g/t Au 9
•
Catalina completed a 15-hole RC drilling in April 2022 8,11:
➢ Intersected multiple stacked gold and silver lenses
➢ The deepest hole, SRLRC005 intersected 4 separate mineralised zones from
75m to 99m downhole (including 2m @ 2.13 g/t Au and 2m @ 2.12 g/t Au)
➢ At the end of SRLRC005 at 102m, rocks were still showing signs of pervasive
hydrothermal alteration
➢ West of SRLRC005, Catalina’s drilling has intersected mineralisation in SRLRC002
(8m @ 1.08 g/t Au including 3m @ 2.12 g/t Au)
➢ Intersections from Catalina’s holes SRLRC002 to SRLRC005 in conjunction with
the historical drilling (including MYRC001 3m @ 2.1g/t Au) constitute a very
wide (60m) mineralised envelope.
Lachlan Fold Belt Project
Rock Lodge
-
Two pre-collared NQ diamond holes (SRLRCD001-2) were drilled in November 2024
to test under the historic workings and previous drilling to a downhole depth of
~300m.
-
The holes intersected broad zones of alteration and veining comprising silicified
sediments with fine disseminated sulphide cut by quartz-sulphide and sulphide
veins. In addition, there were intervals of stockwork sulphide veining and semimassive sulphide.
Altered
sediments
Sulphidic
vein
Sulphidic
vein
Sulphidic breccia
Photos of core from Diamond drilling – Nov 2024
Altered
sediments
Lachlan Fold Belt Project
Lachlan Fold Belt Project
Rock Lodge
▪ Significantly RC drill holes also intersected anomalous copper, bismuth
and cadmium indicating the mineralization may be intrusion related with
implication for the tonnage potential. 8
▪ Rocklodge represents a large hydrothermal alteration system with a late
brittle mineralizing event that may be related to an intrusion at depth.
▪ Catalina eagerly awaits the results of the laboratory analysis of the recent
diamond drill core samples for gold and multi-elements.
▪ Pending results Catalina is planning additional drilling to extend the
mineralization along strike where it is partially obscured by tertiary basalt
flows.
▪ Additional geophysical surveys (IP) may be required to trace the
mineralization under cover.
Rock Lodge – IRGS conceptual model
Nelson Bay Iron Project
•
Developed from initial DSO discovery in 2010 to production in 2013 in Benchmark cost and time - First
company to mine DSO Iron Ore in Tasmania.
•
Proximal to Savage River Magnetite (Grange Resources , ASX : GRR).
•
DSO Iron Ore production and shipments - November 2013 to June 2014;
➢ Approximately 58% Fe
➢ Low alumina
➢ Iron Ore Lump (approximately 40% by volume)
➢
➢
•
Costs of approximately AUD $72 per tonne FOB Burnie Port*
5 shipments made to China; product well accepted
Incremental infrastructure required to be developed for restart.
* as derived from 2014 Annual Report to Shareholders
Nelson Bay Iron Project
▪
▪
▪
Re-permitting – DSO Project
➢ Development Application made to Council in August 2018 for new permit
for DSO operations only to replace old permit issued in 2012
❖ Recommence previously developed DSO Pit
❖ Deepening of existing DSO Pit (~30m) to approximately 80m
❖ Over previous cleared disturbed area (~64ha) plus insignificant
new clearing (~3ha) for a total approximately 67 ha
➢ Draft DPEMP accepted by EPA as prepared in accordance with the
guidance - advertised between December 2021 and February 2022 for
Public Consultation
➢ EPA advised in March 2022 that current proposal before the EPA (DA
18/059) should be referred under the EPBC Act, specifically in relation to
the potential for water discharge to impact the Giant Freshwater Crayfish
(GFC)
➢ DCCEEW issued EPBC Referral Decision in November 2023, that the
proposed action is a controlled action to be assessed by EIS
➢ Guidelines to prepare EIS issued by DCCEEW at the end May 2024
Rehabilitation security deposit of $827,000 increase by $466,000 to $1,293,000
in November 2024.
Continued “Care & Maintenance” since June 2014
Strategy
Project incubation (identify
and acquire portfolio of under
explored projects)
Advance projects using
modern exploration
techniques
❖ The Company has built a portfolio of projects in highly prospective terranes
➢ FY 2021 : Lachlan Fold Belt
➢ FY 2024 : Laverton
❖ Process of continuous evaluation and prioritisation of its project portfolio
➢ FY 2022 : Divest Arunta JV to MetalsGrove Mining Ltd (ASX: MGA). Retained exposure via substantial shareholding.
➢ FY 2025 : Divest Kookynie West to Kobold Metals. Sale Agreement provides upside participation.
❖ Action Plans
➢ RC drilling planned at Laverton Project in early 2025 – POW approval received.
➢
Results awaited for diamond drilling completed in November 2024 at Rock Lodge in Lachlan Fold Belt Project.
➢
Continue to pursue approvals for recommencement of operations at Nelson Bay Iron Project.
➢
Business Development: seek new projects to build the project pipeline (early stage to advanced).
Realise value
development, mining, JV, sale
Connect with us
Unit 38, 18 Stirling Highway
Nedlands, WA 6009
T:
+61 8 6118 1672
E:
info@catalinaresources.com.au
W: www.catalinaresources.com.au
References
1 Westaway, J., Lily Pond Well Project: Annual Report for period 1 Jan 1999 to 31 Dec 1999. Sons of Gwalia WAMEX Report 1999 (A60870).
2 Ida H Gold Mine: Mindat (https://www.mindat.org/loc-268922.html).
3 Great Southern Mining Ltd (ASX: GSN) announcement, 21st July 2021; Indicated Mineral Resource Mon Ami.
4 Storey, C. 2001. Technical Report 1167. Third Annual Report, Pelican Project. Anaconda Nickel WAMEX report A 62927.
Further details of Catalina Resources Ltd exploration results referred to in this presentation can be found in the following announcements lodged on the ASX:
6
3-June-2024
7
2-May-2023
8
31-May-2022
9
25-Oct-2021
Resampling Upgrades Gold and REE Targets at Laverton
Air core re-splits reveal assays exceeding 1% TREO at Dundas
RC Drilling hits multiple Gold, Silver, base metal lenses
Gold Mineralised Trend Confirmed at Lachlan Fold Project
101-Nov-2024
Catalina intersects 44m at 1.01g/t gold at Laverton
1120-Nov-2024
Broad alteration zone with quartz-sulphide veining logged
Share your feedback
Discover