Correction to Mid-West Portfolio Announcement on 15 June
Released
Released
Announcement PDF
Page 1
Correction to ASX Announcement released on 15 June 2026
Catalina Resources Limited (ASX:CTN) (“the Company”) advises that on 17 July 2026 it identified an error
in the highlights section of its ASX announcement released on 15 June 2026 titled “Review of Historical
Data Confirms Significant Gold Results Across Recently Acquired Mid-West Portfolio.”
The error is limited to the highlights section only. The Company confirms that the remainder of the
announcement is correct in its entirety and remains unchanged.
An amended version of the announcement, incorporating the corrected highlights, accompanies this
announcement.
This announcement has been authorised for release by the Executive Director, Ross Cotton.
Contact
Investors/ Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6188 8181
ASX Announcement
17 JULY 2026
Review of Historical Data Confirms Significant Gold Results
Across Recently Acquired Mid-West Portfolio
Highlights
➢ Review of historical datasets completed for Catalina's recently acquired Mid-West
project portfolio which comprises Pithara, Kirkalocka, Tallering and Warriedar.
➢ Recent acquisition significantly increased expands Catalina's Western Australian gold
footprint by adding to its existing gold projects which include Evanston, Yerilgee, Peak
Hill, Deflector North, Big Bell and Boodanoo.
➢ Portfolio growth supported by successful $3.0 million capital raising.
➢ Pithara Project: Historical drilling returned high-grade gold results including:
o 5m @ 2.70g/t Au from 29m, including 1m @ 8.53g/t Au from 31m (DTR949)
o 7m @ 1.76g/t Au from 89m (PTRC008), 2m @ 2.45g/t Au from 8m, including 1m @
3.51g/t Au from 8m (DTR1176); and
o 2m @ 1.74g/t Au from 4m, including 1m @ 3.48g/t Au from 4m (DTR1175).
➢ Kirkalocka Project: Historical drilling confirmed multiple gold mineralised zones
including:
o 1m @ 23.08g/t Au (08KLRC033)
o 6m @ 1.38 g/t Au, including 3m @ 1.40 g/t Au (KKA795)
o 6m @ 1.79 g/t Au, including 3m @ 3.02 g/t Au (KKA796)
o 2m @ 2.12 g/t Au, including 1m @ 2.23 g/t Au (01-WE-RC-002)
➢ Tallering Project: Historical exploration identified significant gold, silver and copper
mineralisation including 1m @ 90.3g/t Ag, 2.03% Cu and 0.89g/t Au, together with rock
chip results of up to 101g/t Au.
➢ Peak Hill Project: Historical drilling intersected gold mineralisation including:
o 10m @ 1.43g/t Au from 65m, including 5m @ 2.70g/t Au from 65m; and
o 2m @ 1.37g/t Au including 1m @ 2.23g/t Au.
➢ Deflector North Project: Historical aircore drilling intersected 10m @ 3.21g/t Au from
surface, with additional mineralised intercepts reported along at least 800m of strike.
➢ Field activities commenced with multiple priority targets advanced for drilling.
Catalina Resources Limited (ASX: CTN) is pleased to provide an update on the ongoing technical review
of its recently expanded Mid-West gold portfolio.
Following the acquisition of a substantial portfolio of exploration assets across the Mid-West and the
successful completion of a $3.0 million capital raising, Catalina has commenced a comprehensive
ASX Announcement
17 July 2026
2
review of historical drilling, geochemical, geological and geophysical datasets across its expanded
project portfolio.
The review confirmed multiple occurrences of historical gold mineralisation across several project
areas, reinforcing the prospectivity of Catalina's Mid-West portfolio. Importantly, the portfolio includes
tenements immediately adjacent to the Kirkalocka Gold Mine (~240,000oz Au Mineral Resource) and
near the 2Mtpa Kirkalocka Gold Processing Plant. The planned recommencement of the Kirkalocka
processing hub by Gylden Resources in 2026 highlights increasing activity within the district and
underscores the strategic value of Catalina's position within an emerging regional gold production
centre.
The work is supporting target generation and prioritisation activities as Catalina advances towards the
next phase of exploration across a portfolio that includes historical production, advanced exploration
projects and multiple underexplored mineralised trends.
With funding secured and technical assessments well advanced, Catalina is progressing geological
reviews, heritage assessments, land access activities and exploration planning.
Importantly, the portfolio benefits from extensive historical exploration datasets, providing an
opportunity to apply modern exploration techniques and geological interpretations to identify and
prioritise targets for future field activities and drilling.
Executive Director, Ross Cotton, commented:
"Since announcing the acquisition of the Mid-West portfolio on 14 May 2026, we have undertaken an
extensive technical review of the substantial historical exploration database across the project areas.
This work has involved the compilation, validation and assessment of a significant volume of historical
drilling, geochemical and geological data, confirming our understanding of the portfolio and its
exploration potential.
The review confirmed numerous significant gold intersections across multiple project areas. We are
now advancing toward our maiden drilling programs across the Mid-West portfolio, with priority targets
identified through the comprehensive review of historical exploration data.
We have moved rapidly since announcing the acquisition in May, leveraging the extensive historical
database to accelerate target generation and position a number of compelling gold opportunities for
drill testing."
Mid-West Portfolio Overview
The Mid-West Portfolio comprises a collection of strategically located gold projects situated within
established mineral provinces of Western Australia (Figure 1).
3
Figure 1 Mid-West Project Portfolio and Regional Map
The projects host historical gold workings, documented mineralisation, extensive exploration datasets
and multiple areas of known gold anomalism.
The review forms part of Catalina's broader approach of systematically assessing the portfolio to
prioritise future exploration opportunities and maximise the value of the Company's recently acquired
project holdings.
The historical exploration results reported in this announcement are sourced from multiple exploration
programmes completed by previous operators across a number of project areas. Given the varying
nature, distribution and density of the available historical datasets, the Company considers the
combination of plan-viewimagery, representative cross-sections where relevant, tabulated drill results
and full collar details to provide an appropriate and balanced presentation of the reported exploration
results. Cross-sectional interpretations have been included only where they materially assist the
understanding of geological or geophysical relationships relevant to the reported results.
4
Pithara Project
The Pithara project is located within the Dalwallinu Greenstone Belt, the project includes the historical
Pithara Gold Mine together with additional tenure near Bolgart, where historical exploration identified
shallow high-grade gold mineralisation and multiple underexplored mineralised trends.
Granitoid and granite gneiss dominate the Pithara Project area. At the Pithara pit, gold mineralisation
was associated with a 3–5 m thick amphibolite unit and an adjacent laminated quartz vein along its
eastern contact. The vein (typically 1–3 m, up to 4 m thick) is the primary host, with minor lower-grade
mineralisation in the surrounding granitoid and a small high-grade hanging wall lode locally present.
Historical discovery drilling at Pithara intersected high-grade gold mineralisation associated with a
silica-biotite-pyrite alteration system beneath transported cover. Significant intercepts included 7m @
21.8g/t Au including 2m @ 61.5g/t Au (PTA055), 4m @ 11.6g/t Au (PTA055) and 6m @ 4.93/t Au
including 1m @ 16g/t Au (PTA012). Historical geological interpretations identified sulphide
mineralisation continuing below the base of drilling (Figure 2), and mining of these intercepts confirmed
the economic significance of the system.
As a consequence of the historical drilling the Pithara pit was mined by a private operator in 2011
producing ~9,000oz at 15.4g/t Au from a shallow open pit1
.
Figure 2 Pithara prospect cross-section showing historical air core drill-holes with >0.5g/t gold intercepts
The mineralised system strikes north-northwest to south-southeast and dips steeply to the west-
southwest (Figures 3 and 4), locally becoming sub-vertical. It extends over approximately 45m of strike,
terminating against a Proterozoic east–west dolerite dyke to the north and an interpreted fault to the
south. Drilling north of the dyke has intersected anomalous gold associated with laminated quartz
veining.
Additional amphibolite units have been intersected but are not associated with significant
mineralisation. Regolith is relatively thin at the pit (fresh rock at ~15–20 m), with the mineralised vein
5
locally extending to surface but difficult to identify in the upper weathered zone. Thicker regolith (up to
~40–50 m) occurs in the northwest prospect area.
Pithara Unmined Significant Historical Intercepts
Historical drilling completed by previous explorers identified several gold intersections beyond the
limits of the Pithara pit area. These results relate to areas that were not subject to historical mining and
will be considered as part of Catalina's ongoing review of the project and future exploration planning.
Hole ID From
(m)
To
(m)
Au
(g/t)
Interval (incl.)
DTR1174 36 40 0.55 4m @ 0.55 g/t Au from 36m
DTR1142 38 39 0.75 1m @ 0.75 g/t Au from 38m
DTR1144 38 39 1.74 1m @ 1.74 g/t Au from 38m
DTR1166 28 29 0.87 1m @ 0.87 g/t Au from 28m
DTR1175 4 6 1.74 2m @ 1.74 g/t Au from 4m, including 1m @ 3.48 g/t Au from 4m
DTR1176 8 10 2.45 2m @ 2.45 g/t Au from 8m, including 1m @ 3.51 g/t Au from 8m
DTR1216 10 11 1.28 1m @ 1.28 g/t Au from 10m
DTR949 29 34 2.7 5m @ 2.70 g/t Au from 29m, including 1m @ 8.53 g/t Au from 31m
DTR979 32 36 0.78 4m @ 0.78 g/t Au from 32m
DTR980 38 39 1.33 1m @ 1.33 g/t Au from 38m
MVAC021 0 2 0.74 2m @ 0.74 g/t Au from 0m
MVAC022 0 2 1.09 2m @ 1.09 g/t Au from 0m
MVAC026 0 1 0.9 1m @ 0.90 g/t Au from 0m
MVAC034 0 1 0.63 1m @ 0.63 g/t Au from 0m
PTA001 28 29 1.31 1m @ 1.31 g/t Au from 28m
PTA018 27 28 0.71 1m @ 0.71 g/t Au from 27m
PTA035 0 4 0.54 4m @ 0.54 g/t Au from 0m
PTA035 8 12 1.08 4m @ 1.08 g/t Au from 8m
PTA036 0 6 0.67 6m @ 0.67 g/t Au from 0m
PTRB189 0 2 1.36 2m @ 1.36 g/t Au from 0m
PTRC002 31 32 0.66 1m @ 0.66 g/t Au from 31m
PTRC003 0 1 1.02 1m @ 1.02 g/t Au from 0m
PTRC008 89 96 1.76 7m @ 1.76 g/t Au from 89m
PTRC010 40 44 0.52 4m @ 0.52 g/t Au from 40m
PTRC010 80 84 0.93 4m @ 0.93 g/t Au from 80m
PTRC045 0 4 0.61 4m @ 0.61 g/t Au from 0m
PTRC072 85 86 0.61 1m @ 0.61 g/t Au from 85m
DTR1174 36 40 0.55 4m @ 0.55 g/t Au from 36m
Significant Intersections (>0.5g/t Au). Full details of the collar locations and associated results are contained within Annexure 1
6
Figure 3 Plan view aeromagnetic image showing selected significant historical unmined drill intercepts at the Pithara Pit and
surrounds
Kirkalocka
Located within the southern Wydgee–Meekatharra Greenstone Belt the project contains multiple
historically identified gold targets associated with interpreted structural corridors and underexplored
greenstone belt. The project sits along the eastern margin of the belt,directly adjacent to the Kirkalocka
Gold Mine (~240,000oz Au Mineral Resource) and in proximity to the Kirkalocka Gold Processing Plant
(2Mtpa), being advanced toward recommencement in 2026 by Gylden Resources Limited.
Gold mineralisation at Kirkalocka is interpreted to be structurally controlled and associated with fold
closures, shear zones and granite–greenstone contacts within the Wydgee–Meekatharra Greenstone
Belt. Mineralisation is primarily hosted within ferruginous saprolite developed over banded iron
formation at the Highway Prospect, with additional occurrences in mafic and ultramafic units and along
shear-hosted quartz veins.
7
Historic drilling has confirmed shallow gold mineralisation including 1m @ 23.08g/t Au (08KLRC033)
6m @ 1.38 g/t Au, including 3m @ 1.40 g/t Au (KKA795) and 6m @ 1.79 g/t Au, including 3m @ 3.02 g/t
Au (KKA796), supported by widespread soil anomalism and rock chip sampling work indicating a broad,
multi-lithology mineralised system with potential continuity into fresh bedrock.
Kirkalocka Significant Historical Intercepts
Hole ID From
(m)
To
(m)
Au
(g/t)
Interval (incl.)
01-WE-RC-002 33 35 2.12 2m @ 2.12 g/t Au, including 1m @ 2.23 g/t Au
01-WE-RC-005 35 36 1.50 1m @ 1.50 g/t Au
08KLRC033 13 14 1.30 1m @ 1.30 g/t Au
08KLRC033 18 19 23.08 1m @ 23.08 g/t Au
08KLRC034 25 26 0.65 1m @ 0.65 g/t Au
08KLRC036 74 75 1.08 1m @ 1.08 g/t Au
CWRC-6807800-002 30 31 0.64 1m @ 0.64 g/t Au
CWRC-6807800-002 34 35 4.66 1m @ 4.66 g/t Au
KKA795 27 33 1.38 6m @ 1.38 g/t Au, including incl. 3m @ 1.40 g/t Au
KKA796 24 27 0.71 3m @ 0.71 g/t Au
KKA796 33 36 0.66 3m @ 0.66 g/t Au
KKA796 42 48 1.79 6m @ 1.79 g/t Au, including incl. 3m @ 3.02 g/t Au
KKA796 60 63 0.81 3m @ 0.81 g/t Au
KKA822 27 30 0.65 3m @ 0.65 g/t Au
Significant Intersections (>0.5g/t Au). Full details of the collar locations and associated results are contained within
Annexure 1
8
Figure 4 Plan view aeromagnetic image showing selected significant historical drill intersections at Kirkalocka
Tallering
Comprising approximately 236 km² and covering 30km of strike along the Tallering Greenstone Belt, the
project is prospective for orogenic gold and VMS-style mineralisation. Historical exploration has
identified multiple EM and IP anomalies, including coincident responses associated with gold, silver
and copper mineralisation confirmed by drilling.
Gold mineralisation at the Santy Project is hosted within sub-cropping shear zones and quartz veining
developed in felsic to intermediate metavolcanic rocks of the Tallering Greenstone Belt. Mineralised
structures are interpreted to strike approximately 060°, broadly parallel to lithological contacts.
Mineralisation is associated with gossanous quartz veins and shears, with sulphide assemblages
including pyrite and minor chalcopyrite. Reported occurrences include disseminated visible gold in
quartz veins and gossans. A Proterozoic dolerite/gabbro dyke, striking north-northeast to south-
southwest, crosscuts the mineralised system and may offset mineralisation.
9
Historical exploration has identified zones of anomalous gold, including shallow drilling intercepts and
surface rock chip results defining mineralised trends over several hectares.
Historical exploration at the Santy Well Prospect included aircore drilling completed by BPM Minerals
(ASX:BPM) which defined a 2.2km-long gold anomaly at Santy2
. The anomaly is located on the Tallering
Greenstone Belt and along strike from the historical A Zone Deposit2
(63,000oz Au at 2.1g/t Au) and
Mixy Deposit2
(65,000oz Au at 4.3g/t Au), highlighting the prospectivity of the broader mineralised.
Historical RC drilling returned an intercept of 1m @ 0.89g/t Au, 90.3g/t Ag, 2.03% Cu and 0.19% Pb+Zn
from 66m in hole SRC006, while drilling at Santy also returned gold mineralisation including 1m @
2.18g/t Au from 87m in hole TARC008. Historical surface sampling returned high-grade gold values of
up to 100.6g/t Au together with significant polymetallic results including 710g/t Ag, 7.04% Cu and
60.1% W, confirming the presence of gold and polymetallic mineralisation within the prospect area.
Subsequent geophysical exploration included Gradient Array Induced Polarisation (GAIP) and Moving
Loop Electromagnetic (MLEM) surveys. The MLEM survey identified three bedrock conductors
(Conductor A, B and C), providing three-dimensional definition of previously identified conductive
zones and highlighting additional geophysical targets for follow-up exploration (Figures 6 and 7).
Historical drilling across the Tallering Project demonstrates the presence of both precious and base
metal mineralisation associated with geochemical and geophysical anomalies, supporting further
evaluation of the project's gold and VMS potential.
Tallering Significant Historical Drilling Results
Hole ID
From
(m)
To (m)
Interval
(m)
Au (g/t) Ag (g/t) Cu (%) Intercept
SRC006 66 67 1 0.89 90.3 2.03
1m @ 90.3g/t Ag, 2.03%
Cu and 0.89g/t Au from
66m
TARC008 87 88 1 2.18 - -
1m @ 2.18g/t Au from
87m
TARC008 92 96 4 0.45 - -
4m @ 0.45g/t Au from
92m
Significant Intersections (>0.5g/t Au). Full details of the collar locations and associated results are contained within
Annexure 1
Historic rock chip sampling returned high-grade gold values of up to 100.6g/t Au at Santy, 38.6g/t Au at
Santy South and 13.8g/t Au at Watkins, together with significant silver, copper and tungsten results.
When combined with the review of historical drilling and geophysical datasets, these results provide
additional support for the prospectivity of the Tallering Project and reinforce the priority of several
identified exploration targets.
10
SIGNIFICANT ROCK CHIP SAMPLING RESULTS
Prospect Sample ID Au (g/t) Ag (g/t) Cu (%) Pb (%) W (%)
Santy GOLDSPECSANTY-2 100.6 - - - -
Santy GOLDSPECSANTY-1 72.66 - - - -
Santy K117152 53.26 - - - -
Santy No record - 710 7.04 - -
Santy Historical Sample - - - - 60.1
Santy South Historical Sample 38.6 - - - -
Nightjar Historical Sample - 350 - 0.8 -
Watkins Historical Sample 13.8 - - - -
Selected significant historical rock chip results exceeding 10 g/t Au, 100 g/t Ag, 1% Cu, 0.5% Pb or 1% W are presented in
the table above. Please refer to pages 79 and 80 of this announcement for the full set of results. Rock chip samples are
point-selective in nature and may not be representative of the overall mineralisation.
Figure 5 Plan view aeromagnetic image showing selected significant historical exploration results at Tallering
11
Figure 6 Historic MLEM Conductors and exploration results at the Santy Prospect
Figure 7 Cross-section of Historic MLEM Conductors and exploration results at the Santy Prospect
Peak Hill
Comprising approximately 126 km² within the Peak Hill Mineral Field of the Murchison Province, the
Peak Hill Project contains numerous historical prospects and areas of documented gold
mineralisation. Historical exploration across the project area has included geological mapping,
geochemical sampling, airborne and ground geophysical surveys, and extensive drilling programmes
12
completed by multiple operators. The project area straddles the boundary between the Narracoota and
Ravelstone Formations of the Bryah Group and sediments of the Bangemall Basin.
Historical drilling completed within the Peak Hill Prospect identified several gold-mineralised
intersections across the prospect area.
Hole ID From
(m)
To
(m)
Au
(g/t)
Interval (incl.)
PHAC0184 65 75 1.43 10m @ 1.43 g/t Au, including 5m @ 2.7 g/t Au from 65m
DRB0106 71 72 1.08 1m @ 1.08 g/t Au from 71m
DRB0114 45 47 1.37 2m @ 1.37 g/t Au from 45m, including 1m @ 2.23 g/t Au from
45m
DRB0119 71 73 0.48 2m @ 0.48 g/t Au from 70m, including 1m @ 0.85 g/t Au
(EOH)
AC results are reported using a 0.1 g/t Au cut-off to highlight anomalous gold trends. AC drilling is utilised as a first-pass
geochemical tool and is considered indicative only. Full details of the collar locations and associated results are contained
within Annexure 1
Figure 8 Plan view aeromagnetic image showing selected significant historical exploration results at Peak Hill
Deflector North
Comprising approximately 156 km² within the Gullewa district of Western Australia, the Deflector
Project is located adjacent to the Deflector Gold-Copper Mine and covers a largely underexplored
portion of the regional mineralised corridor.
13
Historical exploration included geological assessment, geophysical interpretation, surface sampling
and limited aircore drilling.
Historical drilling identified anomalous gold mineralisation, including broad near-surface mineralised
intervals, while regional aeromagnetic data and historical exploration highlighted several areas
considered prospective for follow-up exploration.
Historical work within the project area remains limited, with only a small number of drill holes
completed across the tenure.
Hole ID From (m) To (m) Au (g/t) Interval (incl.)
AC2014-1 30 40 0.32 10m @ 0.32 g/t Au from 30m
AC2014-2 0 10 3.21 10m @ 3.21 g/t Au from surface
AC2014-3 40 50 0.26 40m @ 0.28 g/t Au, including 10m @ 0.47 g/t au from
40m (EOH)
AC2014-4 70 80 0.55 10m @ 0.26 g/t Au from 70m
AC results are reported using a 0.1 g/t Au cut-off to highlight anomalous gold trends. AC drilling is utilised as a first-pass
geochemical tool and is considered indicative only. Full details of the collar locations and associated results are contained
within Annexure 1
Figure 9 Plan view aeromagnetic image showing selected significant historical exploration results at Deflector North
14
NEXT STEPS
Field activities have commenced, with site visits currently underway to ground truth historical data,
validate outcomes from the desktop review, and support planning of future exploration activities.
Heritage assessments are underway, and access agreements are being progressed with relevant
pastoralists across the project areas.
Catalina anticipates completing, target prioritisation, field reconnaissance and drill planning within the
coming weeks.
The Company will continue to update shareholders as exploration activities progress.
Contacts
Investors / Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6188 8181
Click Here leave a question about this announcement and to visit our Investor Hub.
This announcement has been authorised for release by the Executive Director, Ross Cotton.
15
REFERENCES (ASX)
This Report contains information extracted from ASX market announcements reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code reporting tables
where applicable) of exploration results referred to in this announcement can be found in the following
announcements lodged on the ASX:
1) Refer WAMEX report A94307 JORGENSEN, G.C (2012) PITHARA PROJECT M70/1279 Dalwallinu
Region, W.A. 2011-2012 Exploration Incentive Scheme Application ID: DAG2011/00005886 Final
Report on Work Completed for the Period 1st July 2011 - 30th June 2012 (Round)
2) Refer BPM ASX Announcement 24 May 2026 SANTY AIRCORE RESULTS DEFINE 2.2KM-LONG GOLD
ANOMALY
COMPETENT PERSONS STATEMENT
The information in this announcement that relates to historical exploration results and geological
interpretation has been reviewed by Dr Nishka Piechocka, PhD, Vice President of the Australia institute
of Geoscientist (AIG) and a full-time employee of Catalina Resources Limited who is a Member of the
Australasian Institute of Mining and Metallurgy. Dr Piechocka has sufficient experience relevant to the
style of mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Dr Piechocka has reviewed the
information referred to in this announcement and consents to the inclusion of the information in the
form and context in which it appears.
The historical exploration results referred to in this announcement were reported by previous explorers
and have been sourced from publicly available reports, including Western Australian Mineral
Exploration (WAMEX) open file reports. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the relevant historical reports
and that the material assumptions and technical parameters underpinning the exploration results
reported in those announcements continue to apply and have not materially changed. The Company
confirms that it has not materially modified the form and context in which the exploration results were
first reported.
FORWARD-LOOKING STATEMENTS
This announcement contains forward-looking statements that are subject to a range of risks and
uncertainties. These statements relate to the Company’s expectations, intentions, or strategies
regarding the future.These statements canbe identified by the use of words like “anticipate”,“believe”,
“intend”, “estimate”, “expect”, “may”, “plan”, “project”, “will”, “should”, “seek” and similar words or
expressions containing same. These forward-looking statements reflect the Company’s views and
assumptions with respect to future events as of the date of this release and are subject to a variety of
unpredictable risks, uncertainties, and other unknowns. Actual and future results and trends could
differ materially from those set forth in such statements due to various factors, many of which are
beyond our ability to control or predict. These include, but are not limited to, risks or uncertainties
associated with the acquisition and divestment of projects (including risks associated with completing
due diligence and, if favourable results are obtained, proceeding with the acquisition of the Beasley
Creek Project), joint venture and other contractual risks, metal prices, exploration, development and
operating risks, competition, production risks, sovereign risks, regulatory risks including environmental
regulation and liability and potential title disputes, availability and terms of capital and general
economic and business conditions.
16
Given these uncertainties, no one should place undue reliance on any forward-looking statements
attributable to the Company, or any of its affiliates or persons acting on its behalf. Subject to any
continuing obligations under applicable law the Company disclaims any obligation or undertaking to
disseminate any updates or revisions to any forward-looking statements in this announcement to
reflect any change in expectations in relation to any forward-looking statements or any change in
events, conditions or circumstances on which any such statement is based.
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development
company whose vision is to create shareholder value through the successful exploration of prospective
gold, base metal, lithium and iron ore projects and the development of these projects into production.
17
JORC Code, 2012 Edition – Table 1 Report
This JORC Table 1 relates to historical drilling results derived from exploration programs completed across a broader tenure package by other exploration
companies.
The information presented in this Table 1 is based on publicly available historical reports and has not been independently verified by the Company.
Sampling and analytical procedures are described where available but are not consistently documented across all historical datasets.
18
SECTION 1 SAMPLING TECHNIQUES AND DATA
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code
explanation
Pithara Kirkalocka Tallering Peak Hill Deflector
Sampling
techniques
• Nature and
quality of
sampling (eg cut
channels,
random chips, or
specific
specialised
industry standard
measurement
tools appropriate
to the minerals
under
investigation,
such as down
hole gamma
sondes, or
handheld XRF
instruments, etc).
These examples
should not be
taken as limiting
the broad
meaning of
sampling.
Historical exploration
results reported
herein were generated
from drilling
programmes
completed by
Independence Group
NL ("IGO") between
2005 and 2008 and by
McVerde Minerals
between 2011 and
2012.
Historical reports
indicate samples were
generally collected at
1m intervals. The
available assay
databases record both
composite sample
intervals and
individual metre
samples, indicating
that composite
sampling was
commonly employed
for initial analysis with
Historical exploration
comprised soil
sampling, lag
sampling, Aircore (AC)
drilling and reverse
circulation (RC)
drilling undertaken by
previous explorers
across the project
area.
Surface geochemical
programmes were
designed to assess
gold and associated
pathfinder element
distributions across
prospective
greenstone
stratigraphy and areas
of transported cover.
Drilling programmes
were subsequently
undertaken to test
geological and
geochemical targets
Historical exploration
results reported
herein were derived
from a combination of
Aircore (AC), Reverse
Circulation (RC),
Rotary Air Blast (RAB),
rock-chip sampling,
soil geochemistry and
geophysical survey
programmes
completed within the
Tallering Project area.
The historical drilling
programmes generally
collected samples at
regular intervals,
typically 1m intervals.
Composite sampling
was employed in
some reconnaissance
programmes, with
anomalous intervals
subsequently re-
sampled or assayed at
The Peak Hill results
reported herein relate
only to two drilling
datasets: (1) 2019
PHAC Aircore (AC)
holes completed at
West Range by
Sandfire Resources
under the Three Rivers
JV; and (2) historical
DRB Rotary Air Blast
(RAB) holes
completed at
Wembley North by
previous operators
(Plutonic-era
database). Other drill
programs have been
excluded from this
JORC summary.
PHAC samples are
recorded as drill chip
samples comprising
splits of cuttings. The
assay metadata
records sample
Historical exploration
results reported for
the Deflector /
Gullewa Project were
generated from
reconnaissance
Aircore (AC) drilling
completed by
Coventry Enterprises
Pty Ltd during the
2013 and 2014
reporting periods.
Available records
identify six AC
drillholes: two holes
drilled in 2013 and
four holes drilled in
2014. Samples were
collected as downhole
composite intervals,
with the 2014 annual
report stating that
samples were
collected as 10 m and
20 m composites and
assayed for gold and
19
• Include
reference to
measures taken
to ensure sample
representivity and
the appropriate
calibration of any
measurement
tools or systems
Share your feedback
Discover