Key Acquisition & Placement Expands Mid-West Gold Portfolio
Released
Released
Announcement PDF
STRATEGIC ACQUISITION & PLACEMENT EXPANDS MID-WEST
GOLD PORTFOLIO
Highlights
➢ Firm commitments received for a A$3.0 million capital raising managed by Shaw and
Partners Limited to support the acquisition and fund geophysics, target generation,
drilling and broader exploration activities across the expanded portfolio.
➢ Binding agreement executed to strategically expand Catalina’s Mid-West and Lake
Johnston portfolio across highly prospective gold and base metal districts in Western
Australia.
➢ Acquisition represents a deliberate portfolio expansion strategy focused on securing
highly prospective ground proximal to processing infrastructure, historical production
centres and active exploration corridors.
➢ Key assets within the expanded portfolio include:
o Kirkalocka – positioned in close proximity to the ~2Mtpa Kirkalocka Gold Mine and
processing hub (currently undergoing refurbishment).
o Tallering –Underexplored gold and VMS opportunity with multiple advanced and
drill-ready targets across ~30km of strike.
o Pithara – includes the historical high-grade Pithara Gold Mine, which reportedly
produced ~9,000oz at 15.4g/t Au from a shallow open pit1
.
➢ Multiple advanced and drill-ready targets already identified across the portfolio through
historical drilling, geophysics, geochemistry and geological reinterpretation.
Catalina Resources Limited (“Catalina” or the “Company”) is pleased to announce that it has entered
into a binding agreement to acquire a strategically assembled portfolio of exploration assets across the
Mid-West (figure 1) and Lake Johnston (figure 6) regions of Western Australia,advancing the Company’s
deliberate strategy of building a substantial land position across emerging and underexplored mineral
districts proximal to historical production centres and regional processing infrastructure.
Executive Director, Ross Cotton, commented:
“The acquisition secures Catalina a strategic landholding across the Mid-West Region, where renewed
investment and consolidation activity — including by Gylden Resources and the proposed reactivation
of the Kirkalocka Mill — is supporting increasing exploration and development activity across the
district.
The portfolio strengthens Catalina’s presence across the broader Kirkalocka, Pithara and Warriedar
projects, adjacent to existing and proposed processing infrastructure, including the 2.0Mtpa Kirkalocka
processing plant and the proposed 3.2Mtpa Lake Johnston processing hub redevelopment. The
Kirkalocka Project is strategically positioned near the historical Kirkalocka Gold Mine, which hosts a
reported Mineral Resource estimate of approximately 240,000oz Au.
ASX Announcement
14 May 2026
The projects host historical mining, established mineralisation, substantial historical datasets and
multiple drill targets capable of supporting rapid exploration advancement. Importantly, the portfolio
also includes underexplored high-grade orogenic gold and VMS systems characterised by extensive
surface mineralisation and major untested drill targets.
The portfolio includes the historical high-grade Pithara Gold Mine, which reportedly1
produced
approximately 9,000oz at 15.4g/t Au from a shallow open pit, together with underexplored strike and
depth extensions identified through historical drilling and geochemical programs.
Collectively, the transaction adds scale, quality and near-term exploration opportunity across multiple
advanced gold and base metal project areas.”
Figure 1. Regional map showing the location of the Mid-West option tenements in relation to major gold projects.
KEY TERMS
Catalina has agreed to acquire from Dreadnought Resources Limited (ASX:DRE) and
contemporaneously exercise the existing Mid-West Option held by Dreadnought in respect of the
Kirkalocka, Pithara, Warriedar and Lake Johnston Projects.
Consideration payable to Dreadnought comprises:
➢ A$100,000 cash payable within five business days of execution of binding documentation; and
➢ A$200,000 in Catalina shares, to be issued at $0.055 per share, subject to shareholder
approval.
In addition, Catalina has agreed to pay Dreadnought a contingent consideration amount if any or all the
relevant tenements are disposed of within 12 months of completion:
➢ 50% of the net proceeds received above Catalina’s acquisition cost, capped at A$500,000;
and
➢ payable in cash or shares at Catalina’s election.
Catalina will exercise the underlying option agreement with Rational Resources Pty Ltd, which includes
the Kirkalocka, Pithara, Warriedar and Lake Johnston Projects, on the following terms:
➢ A$300,000 cash payable within five business days of settlement of the proposed capital
raising;
➢ A$1.2 million in Catalina shares, to be issued at $0.055 per share, subject to shareholder
approval; and
➢ A 1% Gross Revenue Royalty across all projects included in the transaction.
In addition, Catalina has agreed to acquire the Tallering Gold Project from Crucial Resources for:
➢ A$300,000 cash payable option fee within five business days of settlement of the proposed
capital raising; and
➢ a 1% Gross Revenue Royalty upon transfer of the tenement.
Kirkalocka Project
The Kirkalocka Project (figure 2) is located approximately 50km south of Mount Magnet within the
southern Wydgee–Meekatharra Greenstone Belt in the Murchison Province of the Yilgarn Craton.
The Project occupies a strategic position along the eastern margin of the greenstone belt, proximal to
the Kirkalocka Gold Mine and nearby Kirkalocka Gold Processing Plant (2Mtpa throughput). The
Kirkalocka Gold Mine is reported by Glyden Resources Pty Ltd (Kirkalocka Project WA | Gylden
Resources Gold Operation) as hosting a Mineral Resource of approximately 240,000oz Au.
Importantly, the Kirkalocka processing hub is currently being advanced toward a planned
recommencement of operations in 2026 by Gylden Resources Pty Ltd (Gylden Resources | Gold
Processing and Toll Treatment WA), reinforcing the strategic significance of the broader district and
highlighting renewed regional development activity.
Figure 2. Aeromagnetic image showing the location of the Kirkalocka project in relation to the Kirkalocka Mine and
Processing Plant.
The project benefits from direct access via the Great Northern Highway and is situated within a region
with extensive historical mining and exploration activity.
Geologically, the project is considered prospective for structurally controlled orogenic gold
mineralisation associated with major regional shear corridors, greenstone–granite contacts and
favourable mafic volcanic and sedimentary host sequences developed along the eastern margin of the
belt.
Historical datasets, structural interpretation and geological review have identified multiple drill-ready
targets associated with interpreted structural corridors and underexplored greenstone stratigraphy.
Tallering Project
The Tallering Project (figure 3) comprises approximately 236km² covering 30km of strike along the
underexplored Tallering Greenstone Belt in the West Murchison region of Western Australia.
The project hosts a large, underexplored gold and VMS system where historical drilling, geochemistry
and geophysics have defined multiple advanced drill targets associated with gold, silver and copper
mineralisation.
Exploration across the belt has been limited historically and largely restricted to shallow RAB and
aircore drilling, with only limited RC drilling completed despite the identification of multiple coincident
EM and IP anomalies.
At the Santy Prospect, conductive anomalies identified from EM and IP surveys occur directly adjacent
to known mineralisation and represent immediate drill targets that remain untested by follow-up
drilling.
Figure 3. Aeromagnetic image of the Tallering project and associated prospects
Pithara Project
The Pithara Project (figure 4) spans approximately 100km across three tenement areas located
approximately 100km north-west of Perth.
The project includes the historical Pithara Gold Mine, where shallow open pit mining reportedly
produced approximately 9,000oz at 15.4g/t Au between 2010 and 2011 from depths of only 40–50m1
.
Mineralisation is considered to have potential for extension at depth and along strike, based on
historical drill intercepts and gold-in-soil anomalies that have received limited follow-up exploration.
Further south, the project also covers historical workings near Bolgart, an area that has seen limited
modern exploration despite renewed regional activity including nearby work associated with Chalice
Mining Limited’s Kings Project JV.
Figure 4. Aeromagnetic image showing the location of the Pithara option tenements in relation to major projects.
Warriedar Project
The Warriedar Project (figure 5) is located approximately 100km south of Yalgoo and 15km east of the
Karara Iron Ore Mine within the Yalgoo–Singleton Greenstone Belt of the Murchison Province.
The project is considered prospective for structurally controlled gold mineralisation associated with
major regional shear systems and favourable greenstone-hosted geology.
Importantly, the tenure occupies a strategic regional position amongst extensive landholdings held
by Capricorn Metals Ltd and lies in close proximity to TG Metals Limited’s Mt Mulgine operations.
Mt Mulgine hosts a reported2
Mineral Resource estimate of approximately 247Mt @ 0.11% WO₃
demonstrating the presence of significant mineralisation within the district.
Catalina believes the project is well positioned within an increasingly active and strategically important
exploration region.
Figure 5. Aeromagnetic image showing the location of the Warriedar option tenements in relation to major projects.
Lake Johnston Project
The Lake Johnston Project (figure 6) comprises approximately 98.4km² within the Lake Johnston
Greenstone Belt of southern Western Australia.
The project is positioned proximal to the Lake Johnston Processing Hub currently being redeveloped
by Forrestania Resources Limited into a proposed 3.2Mtpa3
gold processing facility, with
commissioning targeted for 2026.
The development of a regional processing hub materially enhances the strategic significance of the
district and provides important infrastructure advantages for exploration and potential future
development activities.
The project covers approximately 13km of prospective greenstone strike considered favourable for
gold, nickel and lithium mineralisation within an underexplored Archean greenstone terrane.
The broader belt is interpreted to host fertile structural corridors, greenstone–granite contacts and
prospective lithological sequences associated with both orogenic gold and komatiite-related mineral
systems identified elsewhere within the district.
Recent regional exploration success and increasing corporate activity further reinforce the
prospectivity of the broader Lake Johnston Greenstone Belt.
Figure 6. Regional map showing the location of the Lake Johnston option tenements in relation to major projects.
PRIVATE PLACEMENT
In addition to the acquisitions, Catalina is has received firm commitments to complete a private
placement of 54,545,455 fully paid ordinary shares at $0.055 per share to raise A$3 million, offered to
institutional and sophisticated investors.
The Placement will be conducted in two tranches under the Company’s existing Listing Rule 7.1 and
7.1A placement capacities, and shares issued will rank equally with existing fully paid ordinary shares.
Funds raised will be applied towards the acquisition of the aforementioned projects,exploration across
the newly acquired and existing assets and working capital and administration activities
Shaw and Partners have acted as Sole Lead Manager and will receive a capital raising fee equal to 5.0%
of the gross proceeds raised under the Offer,3,000,000 Shares and 10,000,000 CTNO(all equity subject
to shareholder approval).
The Company will also issue an additional 7,000,000 ordinary shares and 40,000,000 CTNO options to
Corporate Advisors for advisory services (subject to shareholders approval).
Indicative Timetable
Activity Date*
DVP Settlement 8.00am WST Tuesday, 19 May 2026
Issue of T1 New Shares under the Offer and
commencement of trading
8.00am WST Thursday, 21 May 2026
EGM to seek approval for Acquisition and T2
New Shares
On or before Wednesday, 1 July 2026
Issue of Acquisition and T2 New Shares under
the Offer and commencement of trading
Thursday, 2 July 2026
*Dates are indicative only and are subject to change
Pre and Post Placement Capital Structure
Pre and Post Placement Capital Structure***
Pre Offer Placement Offer* Acquisition /
Advisory
Post Offer
Shares 142,354,556 54,545,455 35,454,544** 232,354,555
Listed Options
($0.115 exp
22/05/2027)**
63,086,921 Nil 50,000,000** 113,086,921
Performance Rights 15,869,556 Nil Nil 15,869,556
*includes shares to be issued in relation to Lead Manager, Corporate Advisor and parties associated with the acquisition of
tenements from Rational Resources
**These series of securities will list subject to shareholder approval
***This includes Tranche 2 of the placement which is subject to shareholder approval
Use of Funds
USE OF FUNDS
Acquisition of projects within Western Australia including exercising Rational
option and Tallering
$0.70m
Estimated costs of proposed acquisition including capital raising $0.25m
Exploration activities across the newly acquired projects/options and
existing portfolio
$1.60m
Working capital and administration $0.45m
Total $3.00m
The placement puts Catalina in a strong financial position and enables the Company to expand
exploration activities with the proceeds from the placement primarily intended to be used acquisition
of assets and associated exploration activities.
Pricing Information (Listing Rule 7.1A.3):
➢ 7.87% discount to 15 day VWAP of A$0.0597, as at 11 May 2026
Contacts
Investors / Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6188 8181
This announcement has been authorised for release by the Executive Director, Ross Cotton.
REFERENCES (ASX)
This Report contains information extracted from ASX market announcements reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code reporting tables
where applicable) of exploration results referred to in this announcement can be found in the following
announcements lodged on the ASX:
1 Refer DRE ASX announcement 3 October 2025 ASX:DRE - Option to Acquire Strategic Landholding in
Mid-West
2 Refer FRS ASX announcement 16 April 2026 Forrestania Commences Ore Haulage to Lake Johnston
3 Refer TGN ASX announcement 30 April 2026 Quarterly Activities/Appendix 5B Cash Flow Report
The Company confirms that it is not aware of any new information or data that materially affects the
information in the original reports, and that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original reports.
FORWARD-LOOKING STATEMENTS
This announcement contains forward-looking statements that are subject to a range of risks and
uncertainties. These statements relate to the Company’s expectations, intentions, or strategies
regarding the future.These statements canbe identified by the use of words like “anticipate”,“believe”,
“intend”, “estimate”, “expect”, “may”, “plan”, “project”, “will”, “should”, “seek” and similar words or
expressions containing same. These forward-looking statements reflect the Company’s views and
assumptions with respect to future events as of the date of this release and are subject to a variety of
unpredictable risks, uncertainties, and other unknowns. Actual and future results and trends could
differ materially from those set forth in such statements due to various factors, many of which are
beyond our ability to control or predict. These include, but are not limited to, risks or uncertainties
associated with the acquisition and divestment of projects (including risks associated with completing
due diligence and, if favourable results are obtained, proceeding with the acquisition of the Beasley
Creek Project), joint venture and other contractual risks, metal prices, exploration, development and
operating risks, competition, production risks, sovereign risks, regulatory risks including environmental
regulation and liability and potential title disputes, availability and terms of capital and general
economic and business conditions.
Given these uncertainties, no one should place undue reliance on any forward-looking statements
attributable to the Company, or any of its affiliates or persons acting on its behalf. Subject to any
continuing obligations under applicable law the Company disclaims any obligation or undertaking to
disseminate any updates or revisions to any forward-looking statements in this announcement to
reflect any change in expectations in relation to any forward-looking statements or any change in
events, conditions or circumstances on which any such statement is based.
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development
company whose vision is to create shareholder value through the successful exploration of prospective
gold, base metal, lithium and iron ore projects and the development of these projects into production.
The information in this announcement that relates to Exploration Results, Mineral Resources,
geological interpretation and exploration potential has been reviewed by Dr Nishka Piechocka, PhD,
Vice President of the Australian Institute of Geoscientists (AIG) and a full-time employee of Catalina
Resources Limited. Dr Piechocka has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activities being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves (“JORC Code”).
Dr Piechocka consents to the inclusion in the report of the matters based on her information in the form
and context in which it appears consents to the inclusion in this announcement of the matters in the
form and context in which they appear.
Share your feedback
Discover