Phase 1 Drilling at Evanston Underway
Released
Released
Announcement PDF
Page 1
Phase 1 Drilling at Evanston Project Underway
HIGHLIGHTS
➢ Catalina Resources’ maiden RC drilling program underway at the Evanston
project
➢ ~7,760m of combined RC and AC drilling planned across priority targets at
Evanston (Leghorn, Viper South, T1B) and Yerilgee (T8, Chicken little, Snowflake)
➢ ~5,760m RC drilling at Evanston prior to Christmas, testing structural and
geochemical targets supported by strong historical intercepts, including:
o 48m @ 0.67g/t Au from 27m including 21m @ 1.13g/t Au from 54m and 3m @ 2.28g/
t Au from 63m¹
o 7 m @ 0.79 % Cu and 535 ppb Au in massive sulphide from the same zone¹
o 18m @ 1.18 g/t Au from 16m, including 4m @ 3.8 g/t Au2
o 15m @ 1.5 g/t Au from 12m, including 3m @ 6.7 g/t Au from 12m¹
o 33m @ 0.3 g/t Au from surface, including 3m @ 0.9 g/t Au from 27m¹
➢ Program designed to test strike and depth potential, evaluate structural corridors,
and deliver strong new intersections across the Evanston and Yerilgee projects
➢ One-metre sampling and rolling assay submissions to provide consistent assay flow
to guide prioritisation of follow-up drilling
➢ Yerilgee RC/AC drilling to commence following Evanston, targeting additional gold-
in-soil anomalies and BIF-hosted mineralisation which has produced previous
resulting including:
o 17m @ 4.1 g/t Au and 28.0 g/t Ag from 53m, including 4m @ 14.9 g/t Au and 72.2 g/t
Ag from 54m1
DRILLING COMMENCED AT EVANSTON
Catalina Resources Limited (ASX: CTN) (“Catalina” or “the Company”) is pleased to announce that
drilling has commenced on schedule aspart ofthe Phase 1drillingprogram atthe Evanston and Yerilgee
gold projects.
Catalina Executive Director Ross Cotton commented:
“We are excited to have drilling underway at Evanston. Earlier work across the trend delivered
compelling intercepts that demonstrate the potential for a shallow mineralised system of meaningful
scale. Commencing this Phase 1 program marks an important step in testing a series of highly
prospective targets that have never been properly evaluated with modern drilling. With rolling assays
being submitted throughout the program, we expect a steady news flow to guide follow-up work and
advance our understanding of the system.”
ASX Announcement
1 December 2025
Page 2
At Evanston, Phase 1 comprises 36 reverse-circulation (RC) drillholes for approximately 5,670 metres,
with completion expected by late December 2025.
The program has been designed to evaluate priority targets along the broader Evanston trend, building
on previously reported mineralisation (Figure 1).
Figure 1. Evanston Project – Target Location and Evanston Project Geology
PROGRAM PRIOR TO CHRISTMAS
Leghorn: 5 drillholes (~870m total)
➢ Previous RC drilling at Leghorn returned multiple +1g/t Au intercepts, with mineralisation remaining
open to the north. Previous Results include:
o 48m @ 0.67g/t Au from 27m including 21m @ 1.13g/t Au from 54m and 3m @ 2.28g/t Au from
63m¹
o 7 m @ 0.79 % Cu and 535 ppb Au in massive sulphide from the same zone¹
Page 3
Figure 2. Leghorn Prospect – Soil Geochemistry, Historical Drilling and Planned RC Drilling
Viper South: 18 drillholes (~2,850m total)
➢ Viper South Prospect lies ~10km along strike from the historic Evanston Gold Mine within the T1
Gold Camp.
➢ Significant gold-in-soil anomalies and historical gold workings occur along the main banded iron
formation horizon and in the surrounding rocks. Previous Results include:
o 18m @ 1.18 g/t Au from 16m, including 4m @ 3.8 g/t Au2
o 15m @ 1.5 g/t Au from 12m, including 3m @ 6.7 g/t Au from 12m¹
o 33m @ 0.3 g/t Au from surface, including 3m @ 0.9 g/t Au from 27m¹
Page 4
Figure 3. Viper South Prospect – Soil Geochemistry, Historical Drilling and Planned RC Drilling
T1B (North-East extension of the Evanston Mine): 13 drillholes (~1,950m total)
➢ T1B Prospect lies ~3km along strike from the Evanston Gold Mine forming part of the same regional
gold-bearing corridor.
➢ A prominent NE–SW trending soil anomaly has yet to be tested beyond depths of 30m.
➢ Soil sampling has defined a coherent gold anomaly with peak values up to 610 ppb Au, well above
regional background, and aligned with the Evanston Shear structures¹.
➢ Further work will evaluate structural and lithological controls and to test for deeper mineralisation
beneath the geochemical anomaly.
Page 5
Figure 4. T1B Prospect – Soil Samples and Planned RC Drilling
Next Steps
At the conclusion of this stage of the Evanston Project drilling campaign resources will be relocated to
the Yerilgee Project (figure 5) where a combination of RC and AC drilling will be conducted across the
Chicken Little, Snowflake, T8 and Auger 2 prospects (figures 6 and 7).
Page 6
Figure 5. Yerilgee Target Location and Project Geology
Figure 6. T6 Camp Prospect – Soil Geochemistry, Historical Drilling and Planned RC Drilling
Page 7
Figure 7. T1B Prospect – Soil Samples and Planned RC Drilling
Further updates will be provided as drilling progresses and assay results are received.
Contacts
Investors / Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6165 8858
References (ASX)
This Report contains information extracted from ASX market announcements reported in accordance
with the 2012edition of the “Australasian Code for Reporting of Exploration Results,Mineral Resources
and Ore Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code reporting tables
where applicable) of exploration results referred to in this announcement can be found in the following
announcements lodged on the ASX:
1) ASX announcement dated 12 December 2024 - Acquisition of Central Yilgarn Greenstone Belts –
Yerilgee and Evanston
2) Segue Resources ASX announcement, 30 January 2017 (historical result, not independently verified
by Catalina and reported for context only)
Page 8
The technical information in this announcement is extracted without modification from the Company’s
ASX announcement titled “ Acquisition of Central Yilgarn Greenstone Belts – Yerilgee and Evanston”
dated 12 December 2024. The Competent Person’s consent was provided for that original
announcement only. As this announcement simply refers to previously reported information and does
not include any new technical data or interpretations, the Company confirms it is not aware of any new
information or data that materially affects the information included in the original announcement, and
all material assumptions continue to apply.
Forward-Looking Statements
This announcement contains forward-looking statements that are subject to a range of risks and
uncertainties. These statements relate to the Company’s expectations, intentions, or strategies
regarding the future. These statements can be identified by the use of words like “anticipate”,
“believe”, “intend”, “estimate”, “expect”, “may”, “plan”, “project”, “will”, “should”, “seek” and
similar words or expressions containing same. These forward-looking statements reflect the
Company’s views and assumptions with respect to future events as of the date of this release and are
subject to avariety of unpredictablerisks,uncertainties,andother unknowns.Actual and futureresults
and trends could differ materially from those set forth in such statements due to various factors, many
of which are beyond our ability to control or predict. These include, but are not limited to, risks or
uncertainties associated with the acquisition and divestment of projects (including risks associated
with completing due diligence and, if favourable results are obtained, proceeding with the acquisition
of the Beasley Creek Project), joint venture and other contractual risks, metal prices, exploration,
development and operating risks, competition, production risks, sovereign risks, regulatory risks
including environmental regulation and liability and potential title disputes, availability and terms of
capital and general economic and business conditions.
Given these uncertainties, no one should place undue reliance on any forward-looking statements
attributable to the Company, or any of its affiliates or persons acting on its behalf. Subject to any
continuing obligations under applicable law the Company disclaims any obligation or undertaking to
disseminate any updates or revisions to any forward-looking statements in this announcement to
reflect any change in expectations in relation to any forward-looking statements or any change in
events, conditions or circumstances on which any such statement is based.
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development
company whose vision is to create shareholder value through the successful exploration of
prospective gold, base metal, lithium and iron ore projects and the development of these projects into
production.