Laverton Project
➢ Two RC drilling campaigns completed, confirming both gold and REE mineralisation
➢ Significant gold intercepts include 18 m @ 1.16 g/t Au from 127 m (incl. 5 m @ 2.3 g/t Au) and
1 m @ 11.5 g/t Au from 114 m
➢ High-grade REE results returned, including 12 m @ 5,828 ppm TREO from 64 m (incl. 4 m @
1.19% TREO)
➢ Metallurgical test work to be undertaken at ANSTO to assess REE recoverability
Central Yilgarn Project
➢ Heritage Protection Agreement executed and Heritage Notice served over priority targets
➢ Heritage Survey scheduled for completion by 24 November 2025 to enable drilling
commencement thereafter
➢ Rock chip sampling at Snowflake returned up to 84 g/t Au, supporting refined drill targeting
➢ Independent technical review by Apex Geoscience prioritised follow-up gold targets Evanston
and Yirilgee Projects
Beasley Creek Project
➢ 100% interest secured in the Beasley Creek Gold Project within the Pilbara Craton
➢ Project prospective for both orogenic and conglomerate-style gold mineralisation with
potential REE upside
➢ Acquisition terms include performance-linked milestones for drilling success and JORC
resource definition
Corporate
➢ Jade Smith appointed Executive Director and Chief Operating Officer (COO)
LAVERTON PROJECT
The 100% owned Halo Gold Project in Laverton lies along the Barnicoat Shear Zone (BSZ), a regionally
significant structural corridor that also hosts the Lily Pond Well, Mon Ami, and Ida H gold resources
(Figure 1). Geophysical interpretations indicate that the BSZ transects Catalina’s tenement, providing
a strong structural setting for the observed mineralisation. This context underpins Catalina’s
rationale for systematic drilling to test for extensions along strike and at depth.
ASX Announcement
30 SEPTEMBER 2025
Page 2
Figure 1. The Barnicoat Shear Zone is a significantly mineralised structure with several significant
gold deposits scattered along its length
During the quarter, Catalina Resources Ltd completed two reverse circulation (RC) drilling campaigns
targeting both rare earth element (REE) and gold mineralisation1,2
. A total of 16 RC holes were drilled,
following up on previous intercepts reported from aircore (AC) and RC programs (see Figures 2 and 3
for relevant cross-sections).
The following significant gold and REE intercepts were returned from the two RC campaigns
completed during the reporting period3,4
:
Gold Intercepts
➢ 18 m @ 1.16 g/t Au from 127 m, including 5 m @ 2.3 g/t Au (LVRC02)
➢ 1 m @ 11.50 g/t Au from 114 m (LVRC10)
➢ 2 m @ 3.13 g/t Au from 48 m (LVRC12)
➢ 3 m @ 1.00 g/t Au from 118 m (LVRC12)
➢ 2 m @ 1.28 g/t Au from 109 m (LVRC12)
➢ 1 m @ 3.15 g/t Au from 149 m (LVRC15)
➢ 2 m @ 0.71 g/t Au from 62 m (LVRC09)
➢ 17 m @ 0.90 g/t Au from 44 m (LVRC06)
➢ 2 m @ 3.79 g/t Au from 190 m (LVRC07)
➢ 5 m @ 2.62 g/t Au from 217 m (LVRC07)
Page 3
➢ 2 m @ 2.55 g/t Au from 58 m (LVRC08)
Figure 2. Cross Section RC drilling within the Halo Gold Project
REE Intercepts
➢ 12 m @ 5,828 ppm TREO from 64 m, including 4 m @ 1.19% TREO from 68 m (LVRC04)
➢ 12 m @ 2,398 ppm TREO from 20 m (LVRC04)
➢ 8 m @ 2,137 ppm TREO from 24 m (LVRC05)
➢ 8 m @ 1,935 ppm TREO from 52 m (LVRC05)
Drilling also intersected anomalous neodymium (Nd₂O₃ at 0.15%) and praseodymium (Pr₂O₃ at 490
ppm) within the high-grade REE zone in LVRC04 (4m @ 13,406ppm TREO). Nd and Pr are critical rare
earths used in permanent magnets for electric vehicles and renewable energy technologies,
highlighting the project’s broader critical minerals potential
Page 4
Figure 3. Drilling cross section, A-A', illustrating anomalous REE geochemistry.
These results build on previous drilling, including earlier intercepts such as:
➢ 44 m @ 1.01 g/t Au from 44 m (LVAC49)5
, including:
o 4 m @ 2.22 g/t Au from 48 m
o 4 m @ 1.96 g/t Au from 64 m
o 8 m @ 1.45 g/t Au from 72 m
➢ 9 m @ 7,565 ppm TREO from 47 m, including 4 m @ 13,406 ppm (1.34% TREO) from 49 m
(LVAC037)6
➢ 5 m @ 4,880 ppm TREO from 63 m, including 1 m @ 10,689 ppm (1.06% TREO) from 66 m
(LVAC044)6
With all assay results now received and validated, Catalina will consolidate the complete dataset to
refine the geological interpretation, assess mineralisation continuity and grade distribution, and
evaluate potential next steps to advance the Halo Project within the broader Laverton project area.
To ensure value is fully understood, metallurgical test work will now be undertaken at the Australian
Nuclear Science and Technology Organisation (ANSTO), Australia’s national authority on critical
minerals processing and a global leader in REE recovery research. While gold remains Catalina’s
primary exploration focus, the REE results provide an additional layer of opportunity for existing
shareholders.
Page 5
CENTRAL YILGARN PROJECT
In December 2024, Catalina Resources Ltd completed the acquisition of the Yerilgee and Evanston
Greenstone Belts from Dreadnought Resources Limited (ASX: DRE), consolidating over 650 km² of
contiguous tenure in the Central Yilgarn region, approximately 190 km northwest of Kalgoorlie (Figure
4). The tenement package includes multiple underexplored mineralised corridors considered
prospective for gold, nickel, lithium, and rare earth elements.
Figure 4. Regional Location of Evanston and Yerilgee Projects
During the quarter, Catalina progressed preparatory activities across both greenstone belts. The
Company executed a Heritage Protection Agreement with the Marlinyu Ghoorlie claimant group and
subsequently served a Heritage Notice over priority targets. In accordance with the agreement, the
Heritage Survey process is expected to be completed by 24 November 2025, enabling commencement
of drilling operations thereafter.
At the Snowflake Prospect within the Yerilgee Belt, 14 rock chip samples were collected from quartz-
veined structures. Gold assay results7
ranged from background to 84 g/t Au, with five samples returning
grades above 0.5 g/t Au. These results support refinement of drill targeting, particularly within felsic
porphyritic host rocks.
In September 2025, the Company engaged Apex Geoscience Ltd to conduct an independent technical
review of exploration datasets, geological models, and historical drilling across both belts. The review
Page 6
assessed data integrity, prioritised gold targets, and provided recommendations to support follow-up
exploration.
No drilling was undertaken during the quarter. However, as reported8
Catalina is preparing a drilling
program to follow up previously reported gold intercepts across several prospect areas including:
Yerilgee Greenstone Belt (Figure 5)
Three principal gold camp targets have been identified at Yerilgee: T6, T8, and T11. All intercepts listed
below are historical and have been reported9
previously and as announced8
will be subject to further
exploration activities post heritage clearance.
Figure 5. Yerilgee Project Geology and Rock Chips
T6 Gold Camp (Figure 6)
Defined by anomalous gold and pathfinder soil geochemistry over approximately 5,000 m × 3,000 m.
Historical RC drilling intersected multiple gold-bearing zones which as announced8
Catalina intends
to follow-up, includes:
• 17 m @ 4.1 g/t Au and 28 g/t Ag from 53 m, including 4 m @ 14.9 g/t Au and 72.2 g/t Ag
(CYRC012)
• 16 m @ 1.9 g/t Au from surface, including 4 m @ 8.5 g/t Au (STAC0118)
• 9 m @ 2.6 g/t Au from 23 m, including 3 m @ 7.1 g/t Au (STKAC0154)
Page 7
Key prospects for proposed drilling within T6 include Chicken Little (Figure 7), Snowflake, and
Megatron.
Figure 6. Location of the Snowflake, Chicken Little, and Megatron prospects showing historical drill
holes and significant previously reported intersections
Page 8
Figure 7. Drilling cross section at Chicken Little North
T8 Gold Camp (Figure 8)
This target is characterised by gold and pathfinder soil anomalism over 1,700 m × 600 m. Historical
drilling to be followed up as per Catalina’s previous announcement8
includes:
• 27 m @ 0.6 g/t Au from 6 m, including 2 m @ 2.2 g/t Au, and 1 m @ 9.0 g/t (BARRC020)
• 17 m @ 0.7 g/t Au from 22 m, including 8 m @ 1.2 g/t Au from 27 m (BARRC015)
• 10 m @ 0.8 g/t Au from surface, including 1 m @ 6 g/t Au from 11 m (BARRC014)
Page 9
Figure 8. T8 Camp showing historical drill holes and significant previously reported intersections
Page 10
Figure 8. T8 Camp cross section showing significant previously reported intersections
Evanston Greenstone Belt (Figure 9)
Two camp-scale targets have been defined within the Evanston Belt: T1 and T2. Intercepts and
anomalism referenced below are historical and referenced in Catalina’s recent announcement8
relating to further exploration activities post heritage clearance.
Page 11
Figure 9. Evanston Project Geology and Rock Chips
T1 Gold Camp
As reported8
the T1 Gold Camp geological setting includes high-Mg basalts, ultramafic units, and
banded iron formations (BIF). Gold-in-soil anomalies and historical workings occur along the main BIF
corridor. Notable historical intercepts to be further explored include:
• Viper prospect: 15 m @ 1.5 g/t Au from 12 m, including 3 m @ 6.7 g/t Au
T2 Gold Camp
The T2 camp is defined by a north-plunging regional syncline containing multiple historical workings
and soil anomalies. As reported8
highlights targeted for further exploration include:
• Leghorn prospect: 48 m @ 0.6 g/t Au from 27 m, including 21 m @ 1.3 g/t Au
• Erk prospect: A 3 km-long, north-trending gold-in-soil anomaly associated with scattered
nugget patches
Page 12
BEASLEY CREEK
During the quarter, Catalina secured a 100% interest in the Beasley Creek Gold Project, located on the
northern flank of the Rocklea Dome in the Pilbara Craton of Western Australia10
. The project lies within
a structurally complex geological setting comprising Archean greenstones and is considered
prospective for multiple gold deposit styles.
As noted within the acquisition announcement10
the wider district (Figure 10) hosts an array of proven
gold resources – including former Northern Star’s Paulsens Gold Operation, which recovered
907,344oz @ 7.3 g/t Au for an average of ~75kozpa between 2005-20175. This asset has since been
acquired by Black Cat Syndicate for the purpose of remnant mining within the existing resource,
achieving its first gold pour in December 2024
Figure 10. Regional location diagram of the Beasley Gold Project
Beasley Creek presents two target models for gold mineralisation:
1. Structurally controlled orogenic gold, hosted within Archean greenstones, where previous
quartz vein and shear-related sampling recorded elevated gold anomalism.
Page 13
2. Conglomerate-style gold, associated with the Hardey Formation unconformity. This
prospective corridor extends for approximately 16 km along the contact of coarse sedimentary
sequences that may serve as potential gold traps.
As reported Catalina’s planned exploration10
will focus on assessing multiple untested or
underexplored targets (Figure 11), including areas where historical RC drilling returned 4 m @ 11.5 g/t
Au (RRC15, 20–24 m), which has not been followed up. This work will be guided by an integrated dataset
comprising:
• Over 1,300 historical soil, stream sediment, and rock chip samples
• 2,323 line-kilometres of reprocessed aeromagnetic and radiometric survey data
• Field-verified geological mapping and interpretation
This dataset will support reinterpretation and the generation of drill targets across the tenure.
Catalina’s exploration program aims to systematically test areas of geological interest, building on
historic work. No systematic drilling has occurred on the tenement in over two decades.
Figure 11. Beasley Creek Project Tenements, Targets and Previous Exploration
Key Commercial Terms
The Company has entered into an acquisition agreement with North Andover Minerals Pty Ltd
(“Seller”) to acquire 100% interest in the Beasley Creek Project (E47/3490) (the “Tenement”). The
material terms of the acquisition are summarised below:
Page 14
Conditions
Precedent
Completion of the acquisition (“Completion”) is conditional upon the satisfaction (or waiver by Catalina) of various
conditions precedent, including
(a) completion of financial, legal and technical due diligence by Catalina on the Tenement, to the absolute
satisfaction of Catalina on or before 15 October 2025;
(b) the completion of the transfer of the Tenement into the name of the Seller;
(c) Catalina obtaining shareholder approval for the issue of the consideration (as outlined below); and
(d) the Parties obtaining all necessary regulatory and third-party approvals necessary to complete the matters
set out in the acquisition agreement (including entry into deeds of assignment and assumption).
If the conditions precedent are not satisfied (or waived) by the date specified above, or otherwise on or before 5:00
pm (Perth time) on 31 March 2026, any party may terminate the acquisition agreement.
Consideration Catalina has agreed, subject to obtaining shareholder approval, to issue the Seller (or its nominee):
(a) 15,000,000 fully paid ordinary shares (“Shares”);
(b) 35,000,000 Performance Rights which will vest upon Catalina announcing a drilling intercept of ≥10m @ 1
g/t Au (or Au equivalent) and/or ≥1m @ 10 g/t Au (or Au equivalent) at the Tenement within 36 months
following Completion; and
(c) 100,000,000 Performance Rights which will vest upon Catalina announcing the achievement of an Inferred
Mineral Resource (as defined in the JORC Code (2012 Edition)) of ≥200,000 oz Au (or Au equivalent) at a cut-
off grade of >0.5 g/t on the Tenement within 48 months following Completion.
Catalina will use reasonable endeavours to satisfy the milestones attaching to the Performance Rights outlined
above. The issue of the Performance Rights will be subject to shareholder approval.
CORPORATE BOARD CHANGES
In September 2025, Mr. Jade Smith was appointed to the Catalina Resources Board as Executive
Director and Chief Operating Officer (COO), effective immediately11
. Mr Smith brings more than 20
years of executive and consulting experience across government, health, education, and resource
sectors. With a strong track record of delivering large-scale business transformation combined with
extensive operationalmanagementexperience,MrSmith has been conducting a comprehensive review
of Catalina’s operations in Western Australia and Tasmania over the last quarter, with a focus on
optimising and aligning the order of priority and approach at each site. At the Corporate level, he has
been gearing the Company for its next phase of growth, through the timely review of internal governance
practices and process.
ADDITIONAL ASX INFORMATION
ASX Listing Rule 5.3.1
Exploration and evaluation expenditure during the quarter totalled $399,098; comprising $377,034 for
field exploration in Western Australia, $2,303 in New South Wales, and $19,761 incurred on care and
maintenance activities at the Nelson Bay River (NBR) Project in Tasmania.
ASX Listing Rule 5.3.2
There was no substantive mining production and development activities during the quarter.
ASX Listing Rule 5.3.5
In Item 6 of the Appendix 5B cash flow report for the quarter, payments to related parties amounted to
$215,514 comprising of executive directors' salaries, consulting fees to directors (including expense
reimbursement), non-executive director's fees and superannuation. As at 30 September 2025, the
Company held cash reserves of $2.992 million and completed the sale of its 4,750,000 shares in ASX-
listed MetalsGrove Mining Ltd (ASX: MGA).
Page 15
MINING TENEMENT INTERESTS ACQUIRED OR RELINQUISHED DURING THE QUARTER AND THEIR
LOCATION
Tenement
Id
Status Project Grant Date Application
Date
Expiry Date Expenditure
Commitment
E30/0584 LIVE ULARING 17/07/2025 28/10/2024 16/07/2030 $20,000
E16/0672 PENDING JAURDI 27/08/2025 $15,000
E30/0591 PENDING ULARING 18/08/2025 $10,000
E30/0593 PENDING ULARING 30/09/2025 $15,000
E40/0479 PENDING MARMION 10/09/2025 $10,000
E47/5364 PENDING GREGORY 24/09/2025 $20,000
E47/5365 PENDING GREGORY 24/09/2025 $20,000
E47/5366 PENDING GREGORY 23/09/2025 $20,000
References (ASX)
This Report contains information extracted from ASX market announcements reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code
reporting tables where applicable) of exploration results referred to in this announcement can be
found in the following announcements lodged on the ASX:
1
ASX Announcement 9 July 2025 Followup-Priority-Gold-Targets-to-be-drilled-at-Laverton.pdf
2
ASX Announcement 28 August 2025 Catalina-set-to-drill-Laverton-gold-halo.pdf
3
ASX Announcement 31 July 2025 Updated-Catalina-intersects-wide-gold-zones.pdf
4
ASX Announcement 6 October 2025 Pilbara-Gold-Acquisition-and-Laverton-Drilling-Confirms-
Gold.pdf
5
ASX Announcement 19 September 2025 RC drilling confirms gold and REE mineralisation at Laverton
6
ASX Announcement 8 January 2025 Re-analysis Upgrades Gold and REE
7
ASX Announcement 4 August 2025 Exploration-Update-Yerilgee-Project.pdf
8
ASX Announcement 9 October 2025 Priority-Targets-for-Upcoming-Central-Yilgarn-Exploration.pdf
9
ASX announcement dated 12 December 2024 Acquisition of Central Yilgarn Greenstone Belts –
Yerilgee and Evanston
10
ASX Announcement 6 October 2025 Pilbara-Gold-Acquisition-and-Laverton-Drilling-Confirms-
Gold.pdf
11
ASX Announcement 22 September 2025Executive-Director-and-Chief-Operating-Officer-
Appointment.pdf
The Company confirms that it is not aware of any new information or data that materially affects the
information in the original reports, and that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original reports.
Competent Person Statement
The review of historical exploration activities and results contained in this report is based on
information compiled by Michael Busbridge, a Member of the Australian Institute of Geoscientists
(AIG). He is a Consultant to Catalina Resources Ltd. He has sufficient experience which is relevant to
the style of mineralisation and types of deposits under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code
for Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code).
Michael Busbridge has consented to the inclusion in the report of the matters based on his
information in the form and context in which it appears.
Page 16
The information in this report that relates to this quarters exploration activities within Laverton are
based on information compiled by Mr. S Nicholls, who is a Member of the Australian Institute of
Geoscientists and full-time employee of Apex Geoscience. Mr Nicholls has sufficient experience
which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr. Nicholls consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears. Where the Company refers to the Mineral Resources in this
report (referencing previous releases made to the ASX), it confirms that it is not aware of any new
information or data that materially affects the information included in that announcement and all
material assumptions and technical parameters underpinning the Mineral Resource estimate with
that announcement continue to apply and have not materially changed.
Where the Company refers to the Mineral Resources in this report (referencing previous releases
made to the ASX), it confirms that it is not aware of any new information or data that materially affects
the information included in that announcement and all material assumptions and technical
parameters underpinning the Mineral Resource estimate with that announcement continue to apply
and have not materially changed.
Forward-Looking Statements
This announcement contains forward-looking statements that are subject to a range of risks and
uncertainties. These statements relate to the Company’s expectations, intentions, or strategies
regarding the future. These statements can be identified by the use of words like “anticipate”,
“believe”, “intend”, “estimate”, “expect”, “may”, “plan”, “project”, “will”, “should”, “seek” and
similar words or expressions containing same. These forward-looking statements reflect the
Company’s views and assumptions with respect to future events as of the date of this release and are
subject to a variety of unpredictable risks, uncertainties, and other unknowns. Actual and future
results and trends could differ materially from those set forth in such statements due to various
factors, many of which are beyond our ability to control or predict. These include, but are not limited
to, risks or uncertainties associated with the acquisition and divestment of projects (including risks
associated with completing due diligence and, if favourable results are obtained, proceeding with the
acquisition of the Beasley Creek Project), joint venture and other contractual risks, metal prices,
exploration, development and operating risks, competition, production risks, sovereign risks,
regulatory risks including environmental regulation and liability and potential title disputes,
availability and terms of capital and general economic and business conditions.
Given these uncertainties, no one should place undue reliance on any forward-looking statements
attributable to the Company, or any of its affiliates or persons acting on its behalf. Subject to any
continuing obligations under applicable law the Company disclaims any obligation or undertaking to
disseminate any updates or revisions to any forward-looking statements in this announcement to
reflect any change in expectations in relation to any forward-looking statements or any change in
events, conditions or circumstances on which any such statement is based.
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development
company whose vision is to create shareholder value through the successful exploration of
prospective gold, base metal, lithium and iron ore projects and the development of these projects
into production.
Page 17
Contacts
Investors / Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6165 8858
Page 18
Appendix 5B
MINING EXPLORATION ENTITY OR OIL AND GAS EXPLORATION ENTITY
QUARTERLY CASH FLOW REPORT
NAME OF ENTITY
Catalina Resources Ltd
ABN QUARTER ENDED (“CURRENT
QUARTER”)
74 130 618 683 30/09/2025
CONSOLIDATED STATEMENT OF
CASH FLOWS
Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
1.1 Receipts from customers
1.2 Payments for
(a) exploration & evaluation
(b) development
(c) production (Care & Maintenance) (6) (6)
(d) staff costs (252) (252)
(e) administration and corporate costs (137) (137)
1.3 Dividends received (see note 3)
1.4 Interest received 16 16
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives
1.8 Other (Rehabilitation Bond) 10 10
1.9 Net cash from / (used in) operating
activities
(369) (369)
2. Cash flows from investing activities
2.1 Payments to acquire or for:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation (399) (399)
(e) investments
(f) other non-current assets
Page 19
CONSOLIDATED STATEMENT OF
CASH FLOWS
Current quarter
$A’000
Year to date (3
months)
$A’000
2.2 Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments 238 238
(e) other non-current assets
2.3 Cash flows from loans to other entities
2.4 Dividends received (see note 3)
2.5 Other (provide details if material)
2.6 Net cash from / (used in) investing
activities
(161) (161)
3. Cash flows from financing activities
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
3.3 Proceeds from exercise of options
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
3.5 Proceeds from borrowings
3.6 Repayment of borrowings
3.7 Transaction costs related to loans and
borrowings
3.8 Dividends paid
3.10 Net cash from / (used in) financing
activities
- -
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
3,522 3,522
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(369) (369)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(161) (161)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
- -
Page 20
CONSOLIDATED STATEMENT OF
CASH FLOWS
Current quarter
$A’000
Year to date (3
months)
$A’000
4.5 Effect of movement in exchange rates on
cash held
4.6 Cash and cash equivalents at end of
period
2,992 2,992
5. RECONCILIATION OF CASH AND
CASH EQUIVALENTS
AT THE END OF THE QUARTER (AS
SHOWN IN THE CONSOLIDATED
STATEMENT OF CASH FLOWS) TO THE
RELATED ITEMS IN THE ACCOUNTS
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 2,992 2,254
5.2 Call deposits 1,268
5.3 Bank overdrafts
5.4 Other (provide details)
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
2,992 3,522
6. PAYMENTS TO RELATED PARTIES OF THE ENTITY AND
THEIR ASSOCIATES
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1
210
6.2 Aggregate amount of payments to related parties and their
associates included in item 2
5
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
Page 21
7. FINANCING FACILITIES
NOTE: THE TERM “FACILITY’ INCLUDES ALL
FORMS OF FINANCING ARRANGEMENTS
AVAILABLE TO THE ENTITY.
ADD NOTES AS NECESSARY FOR AN
UNDERSTANDING OF THE SOURCES OF
FINANCE AVAILABLE TO THE ENTITY.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1 Loan facilities
7.2 Credit standby arrangements
7.3 Other (please specify)
7.4 Total financing facilities
7.5 Unused financing facilities available at quarter end
7.6 Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8. ESTIMATED CASH AVAILABLE FOR FUTURE
OPERATING ACTIVITIES
$A’000
8.1 Net cash from / (used in) operating activities (item 1.9) (369)
8.2 (Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(399)
8.3 Total relevant cash inflow / (outgoings) , (item 8.1 + item 8.2) (768)
8.4 Cash and cash equivalents at quarter end (item 4.6) 2,992
8.5 Unused finance facilities available at quarter end (item 7.5)
8.6 Total available funding (item 8.4 + item 8.5) 2,992
8.7 Estimated quarters of funding available (item 8.6 divided by
item 8.3)
3.90
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8 If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1 Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2 Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
8.8.3 Does the entity expect to be able to continue its operations and to meet its
business objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Page 22
COMPLIANCE STATEMENT
1 This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2 This statement gives a true and fair view of the matters disclosed.
Date: 30 October 2025
Authorised by: Johnathon Busing
NOTES
1. This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity’s
activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that
wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.
2. If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and
provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to
this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX
pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.
3. Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities,
depending on the accounting policy of the entity.
4. If this report has been authorised for release to the market by your board of directors, you can insert here: “By the board”. If it
has been authorised for release to the market by a committee of your board of directors, you can insert here: “By the [name of
b
Share your feedback
Discover