Follow-up Priority Gold Targets to be drilled at Laverton
Released
Released
Announcement PDF
ASX Announcement
9 July 2025
Follow-up Priority Gold Targets to
be drilled at Laverton
Highlights
• Drillers mobilisation to the Laverton project scheduled
• The drilling is designed to follow up the previous significant gold intercepts at
Laverton including 28m @ 1.09g/t Au from 57m
• High-grade REE intersections including 10,000ppm TREO (1%), adjacent to the
world class Mt Weld REE Mine will be drill tested
Catalina Resources Ltd (ASX: CTN) (‘Catalina’ or the ‘Company’) is pleased to provide the following update:
Catalina has engaged drillers, with mobilisation to the Laverton Gold Project scheduled for next week. The
upcoming drill program is designed to follow up on the significant zone of gold mineralisation identified during
previous aircore drilling along the interpreted trend of the regionally significant Barnicoat Shear Zone.
Notable intercepts include:
•
LVAC049: 28m @ 1.09g/t Au from 57m.
Anomalous REE intersections were also returned from aircore drilling in the vicinity of LVAC049. A high-grade REE
intersection in hole LVAC037 over 10,000ppm TREO (1%) near the Mt Weld REE Mine intersected:
•
LVAC0037: 9m @ 7,565ppm TREO from 47m, including: 4m @ 13,406ppm (1.34%) TREO from 49m.
The upcoming program aims to define the continuity and extent of both gold and REE mineralisation along strike and
at depth.
The Company will provide a further update when drilling commences.
This announcement has been authorised for release by the Board of Directors.
For further information, please contact:
Ross Cotton
Executive Director
ross.cotton@catalinaresources.com.au
- ENDS -
Catalina Resources Limited
ACN 130 618 683
ASX: CTN
T: 61 8 6118 1672
E: info@catalinaresources.com.au
A : 38/18 Stirling Hwy, Nedlands
WA 6009 Australia
Page 1 of 2
catalinaresources.com.au
References
This Report contains information extracted from ASX market announcements reported in accordance with the 2012 edition of the
“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” (“2012 JORC Code”). Further
details (including 2012 JORC Code reporting tables where applicable) of exploration results referred to in this announcement can
be found in the following announcement lodged on the ASX:
25 June 2025 – ASX:CTN Exploration Update of the Central Yilgarn and Laverton Projects
Competent Person Statement
The review of historical exploration activities and results contained in this report is based on information compiled by Michael
Busbridge, a Member of the Australian Institute of Geoscientists (AIG). He is a consultant to Catalina Resources Ltd. He has
sufficient experience which is relevant to the style of mineralisation and types of deposits under consideration and to the
activity which he is undertaking to qualify as a Competent Person as defined in the 2012 edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (the JORC Code). Michael Busbridge has consented to the
inclusion in the report of the matters based on his information in the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information in the original
reports, and that the form and context in which the Competent Person’s findings are presented have not been materially modified
from the original reports.
Catalina Resources Limited
ACN 130 618 683
ASX: CTN
T: 61 8 6118 1672
E: info@catalinaresources.com.au
A : 38/18 Stirling Hwy, Nedlands
WA 6009 Australia
Page 2 of 2
catalinaresources.com.au
Share your feedback
Discover