Breakaway Dam Expands to ~1.2km Strike, Open Along Strike with
Copper Intercepts up to 2.17% Cu
Highlights
➢ Breakaway Dam results expanded strike from ~700m to ~1.2km, demonstrating growth in
the mineralised footprint
➢ Copper-rich intercepts returned from drilling, including:
o 1.9m (ETW) @ 2.17% Cu (BDCRC26016)
o 2.9m (ETW) @ 0.57% Cu (BDCRC26014)
o 3.8m (ETW) @ 0.31% Cu (BDCRC26016)
➢ Mineralisation intersected across multiple positions and depths, indicating a laterally
extensive system
➢ Strong geophysical responses across all holes, providing clear vectors for follow-up
drilling
➢ Priority targets identified for next phase drilling, including larger, coherent zones
Catalina Resources Limited (“Catalina” or “the Company”) is pleased to report results from its March
2026 reverse circulation (RC) drilling program at the Breakaway Dam Copper Project, located
approximately 17km east of Menzies in Western Australia, with drilling now nearing completion.
The program was designed to test modelled downhole electromagnetic (DHEM) conductor plates
derived from previous drilling, while systematically targeting a key stratigraphic horizon prospective for
volcanogenic massive sulphide (VMS) copper mineralisation¹,
².
Drilling intersected sulphide mineralisation associated with modelled EM conductors, with DHEM
surveying returning strong responses across all holes and defining both on-hole and off-hole
conductive plates.
These results reinforce the Company’s interpretation of Breakaway Dam as a copper-rich VMS system
and provide a clear basis for refining the geological model and progressing targeted follow-up
exploration.
Executive Director, Ross Cotton, commented:
“The emerging footprint at Breakaway Dam points to a broader system, with mineralisation and targets
extending across a growing strike length. While continuity continues to be established, the results
indicate we are working within a large and active system with clear potential to build scale.
Achieving this level of understanding in a relatively short period since acquiring the project reflects
Catalina’s disciplined and systematic approach to exploration.
Our focus is now shifting toward more targeted drilling of the strongest zones identified to date, as we
continue to refine the model and advance the project.”
ASX Announcement
6 May 2026
2
Figure 1. Breakaway Dam Regional Location
CONTEXT AND PROGRAM OBJECTIVES
This phase of drilling was undertaken as a targeted follow-up to test a ~700m strike extent of
mineralisation and directly assess modelled downhole electromagnetic (DHEM) conductor plates,
interpreted to represent sulphide accumulations.
Previous drilling at Breakaway Dam has consistently intersected sulphide mineralisation within a
defined stratigraphic position in fine-grained metasediments overlying a porphyritic basalt sequence.
This setting, together with the sulphide assemblage and associated geophysical responses, supports
the interpretation of a copper-rich VMS system.
Historic drilling across the central zone returned multiple copper intersections, including intervals
approaching ~2% Cu and true widths of up to approximately 8–9 metres¹,², with results including 6m @
1.19% Cu (BDRC010) and 1.47m @ 1.97% Cu (BDCDD2502).
The program aimed to refine understanding of system continuity and geometry, assess the potential for
thicker sulphide accumulations within conductor cores, and support ongoing geological and
geophysical modelling ahead of further drilling.
3
Figure 2. Plan view of BDC Central Zone target drill area including BDCDD2503 previous drill holes and
associated results1,2
.
SUMMARY OF RESULTS 2026
The program returned copper intercepts of up to 1.9m (Estimated True Width -ETW) @ 2.17% Cu further
confirming the VMS mineralisation of Breakaway Dam is copper-rich (figure 3).
4
Figure 3. Cross-section of BDCRC26015 and BDCRC26016 illustrating recently modelled DHEM plates and significant
intercepts.
DHEM data returned strong conductor responses in all holes and geophysical modelling of those holes
shows multiple on hole and off hole conductors (figure 4).
5
Figure 4: Cross-section of BDCRC26012 illustrating both on-hole and off-hole conductors with significant intercept
aligning with the on-hole conductor.
The modelled conductors are in a position and orientation consistent with discontinuous lenses of
sulphide-rich zones in the clastic rocks on or near the top of the underlying basalt unit (figure 5). This
relationship between modelled conductors, the basalt footwall position and percent-level copper
intercepts is consistent with a structurally overprinted VMS system and emphasises the prospectivity
of the Breakaway Dam copper project.
The results of the March 2026 drill campaign will form the basis for further testing of the project using
systematic testing with DHEM surveys along strike to the north and south, but also further drillholes
testing the larger EM conductor plates which are interpreted to represent more coherent zones of the
original VMS mineralisation less disaggregated by the structural overprint (figure 6).
6
Figure 5. Cross-section of BDCRC26014 illustrating newly modelled conductors and significant intercepts at different depths
implying a structurally overprinted system.
7
Figure 6: Long section of target horizon showing recently modelled DHEM plates and significant intercepts.
Significant intercepts (nominal >0.4% Cu with geological discretion applied) from the campaign
include:
Drillhole From (m) To (m) Interval (m)
(ETW)
Cu (%)
BDCRC26009 189 189.9 0.9 0.78
BDCRC26012 131 131.9 0.9 0.2
BDCRC26013 200 200.9 0.9 0.35
BDCRC26014 140 140.9 0.9 0.29
BDCRC26014 204 206.9 2.9 0.57
BDCRC26016 124 127.8 3.8 0.31
BDCRC26016 198 199.9 1.9 2.17
STRATEGIC IMPLICATIONS
The March 2026 drilling program materially advances the Company’s understanding of Breakaway Dam
and supports progression toward a more targeted and scalable exploration phase.
Mineralisation has been intersected at multiple positions along strike and at varying depths. While
continuity has not yet been established, the distribution of intercepts and associated conductors
indicates a fertile and laterally extensive system, with indications that higher-grade mineralisation may
be localised within discrete zones.
8
Mineralisation and associated conductors have now been identified over a strike extent of
approximately 1.2km, with historic drilling indicating mineralisation extends up to 1.8km, reinforcing
the interpretation of a system-scale VMS environment and providing a strong basis for continued
expansion.
Geological and geophysical data indicate a structurally controlled system. The identification of both
smaller conductive responses and larger, more coherent conductor plates provides an important
distinction for targeting. The larger plates are interpreted to represent potentially better-preserved
sulphide accumulations (lenses) and will form the priority focus of follow-up drilling.
Assay results remain pending for a number of drillholes, and these results are expected to further
inform the geological model and assist in refining priority targets.
These outcomes establish a clear forward strategy, with future work focused on:
➢ Testing priority conductor plates
➢ Expanding the system along strike
➢ Refining the geological and structural model to improve targeting confidence
Collectively, the results support a transition to a more predictive and targeted phase of exploration,
with a defined pipeline of drill-ready targets and an improved basis for assessing the broader scale and
potential of the Breakaway Dam copper project.
Contacts
Investors / Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6188 8181
This announcement has been authorised for release by the Executive Director, Ross Cotton.
REFERENCES (ASX)
This Report contains information extracted from ASX market announcements reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code reporting tables
where applicable) of exploration results referred to in this announcement can be found in the following
announcements lodged on the ASX:
1. Refer CTN ASX announcement 20 January 2026 Drilling-Confirms-Breakaway-Dam-as-a-
CopperRich-VMS-System.pdf
2. Refer CTN ASX announcement 17 February 2026 Breakaway-Dam-Follow-Up-Drilling-to-
Commence-Updated.pdf
9
COMPETENT PERSONS STATEMENT
Reported information in this announcement that relates to exploration activities is based on
information compiled by Dr Nishka Piechocka, PhD, Vice President of the Australian Institute of
Geoscientists (AIG) and a full-time employee of Catalina Resources Limited. Dr Piechocka has
sufficient experience relevant to the style of mineralisation and type of deposit under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC
Code). Dr Piechocka consents to the inclusion in the report of the matters based on her information in
the form and context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcement and, in the case of estimates of Mineral
Resources or Ore Reserves, that all material assumptions and technical parameters underpinning the
estimates in the relevant market announcement continue to apply and have not materially changed.
The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original market announcement.
FORWARD-LOOKING STATEMENTS
This announcement contains forward-looking statements that are subject to a range of risks and
uncertainties. These statements relate to the Company’s expectations, intentions, or strategies
regarding the future.These statements canbe identified by the use of words like “anticipate”,“believe”,
“intend”, “estimate”, “expect”, “may”, “plan”, “project”, “will”, “should”, “seek” and similar words or
expressions containing same. These forward-looking statements reflect the Company’s views and
assumptions with respect to future events as of the date of this release and are subject to a variety of
unpredictable risks, uncertainties, and other unknowns. Actual and future results and trends could
differ materially from those set forth in such statements due to various factors, many of which are
beyond our ability to control or predict. These include, but are not limited to, risks or uncertainties
associated with the acquisition and divestment of projects (including risks associated with completing
due diligence and, if favourable results are obtained, proceeding with the acquisition of the Beasley
Creek Project), joint venture and other contractual risks, metal prices, exploration, development and
operating risks, competition, production risks, sovereign risks, regulatory risks including environmental
regulation and liability and potential title disputes, availability and terms of capital and general
economic and business conditions.
Given these uncertainties, no one should place undue reliance on any forward-looking statements
attributable to the Company, or any of its affiliates or persons acting on its behalf. Subject to any
continuing obligations under applicable law the Company disclaims any obligation or undertaking to
disseminate any updates or revisions to any forward-looking statements in this announcement to
reflect any change in expectations in relation to any forward-looking statements or any change in
events, conditions or circumstances on which any such statement is based.
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development
company whose vision is to create shareholder value through the successful exploration of prospective
gold, base metal, lithium and iron ore projects and the development of these projects into production.
10
Drill Hole Location
Hole ID Easting
(MGA20Z51)
Northing
(MGA20Z51)
Dip Azi EOH Drill
Type
Elev
(STRM)
BDCRC26009 330465 6712773 60 45 250 RC 500
BDCRC26012 329888 6713171 60 45 250 RC 457
BDCRC26013 329723 6713286 60 45 250 RC 458
BDCRC26014 329640 6713346 60 45 250 RC 500
BDCRC26015 329598 6713400 66 360 220 RC 500
BDCRC26016 329597 6713399 60 45 250 RC 464
BDCRC26017 329383 6713512 60 45 157 RC 500
11
JORC Code, 2012 Edition – Table 1 Report
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralization that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralization types (eg
submarine nodules) may warrant
disclosure of detailed information.
Sampling was undertaken using reverse
circulation (RC) drilling to obtain 1 m interval
samples collected via a Metzke cyclone into
calico bags, with individual sample weights
typically ranging from approximately 1 kg to 4
kg. Samples were submitted to ALS
Laboratories in Western Australia for
preparation and analysis. Sample preparation
involved drying, crushing to 70% passing 2
mm, splitting via rotary splitter, and
pulverising to 85% passing 75 µm, prior to
analysis. Analytical work was completed
using aqua regia digestion with ICP-AES finish
for multi-element analysis (ME-ICP41) and
ore-grade methods for copper (ME-OG46 and
Cu-OG46) .
The determination of mineralisation reported
in this announcement is based on both
laboratory assay results and supporting
geological logging of RC chip trays, including
semi-quantitative estimates of sulphide
abundance and identification of sulphide
species such as chalcopyrite, sphalerite,
galena, pyrrhotite and pyrite. Visual estimates
were undertaken by experienced geologists
and are qualitative to semi-quantitative in
nature and are not intended to represent
grade or metal concentration.
Measures to ensure sample representivity
included consistent 1 m sampling intervals,
use of a cyclone and splitter to obtain
representative sub-samples, and adherence
to industry-standard sample preparation
protocols at an accredited laboratory.
Notwithstanding this, RC chip samples may
be subject to inherent limitations including
particle size variability, potential loss of fines,
and sample mixing within the cyclone system.
No specialised measurement tools (such as
handheld XRF or downhole sondes) were
used in the determination of mineralisation.
12
Criteria JORC Code explanation Commentary
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Reverse Circulation (RC) drilling was
performed by Core Drilling from Perth, using a
5.25-inch diameter drill bit with 6 m length
drill rods with automatic rod handlers.
Holes were drilled at an angle of -60⁰. Drilling
with Schramm T685 and Schramm T685i drill.
The Schramm T685 was truck-mounted, while
the Schramm T685i was configured as a
track-mounted (crawler) rig to accommodate
varying site access and terrain conditions.
Supported by a Mercedes 8x8 booster trucks,
equipped with either a Sullair 1150cfm/500psi
auxiliary compressor and a Hurricane 6T
1000-psi booster (CDS206) or Doosan
1350cfm/350psi auxiliary compressor and a
Hurricane 6T 1000-psi booster (CDS207), was
used to complete the drilling program.
RC drilling produces dry rock chips, as large
capacity air compressors dry the rock out
ahead of the advancing drill bit. Downhole
Surveys employed a downhole Gyro making
readings every 5m. The rig was supported by a
primary compressor rated at approximately
2400 CFM at 1000 PSI.
Downhole Surveys employed a downhole
Gyro making readings every 30m.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Sample recovery was assessed visually via
the sample size collected into the calico
bags. Where sample recovery was low due to
wet samples material was scooped from the
spoil pile.
Sample recovery and condition was noted for
every metre.
Ground water caused wet samples
occasionally.
In ground sumps were dug prior to drilling
commencing, to collect the excess
groundwater expelled by the rig.
Catalina Resources does not anticipate any
sample bias from loss/gain of material from
the drill rig cyclone.
Logging
• Whether core and chip samples have been
geologically and geotechnically logged to
a level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
RC drill holes were logged for various
geological attributes, including colour,
lithology, oxidation, alteration, mineralisation
and veining. All holes were logged in full by
geologists from Apex Geoscience and
Xirlatem
13
Criteria JORC Code explanation Commentary
relevant intersections logged. No geotechnical logging was possible as the
RC drilling method does not allow RQD
recording.
Geological logging was undertaken at 1 m
intervals and recorded at the sample depth.
Initial geological logging was conducted in the
field during drilling, with subsequent review
and refinement undertaken in the office using
chip trays to confirm lithological and
mineralisation observations.
Representative 1m samples weighing 20 gms
were collected and placed into plastic chip
trays for later reference.
The recording was done at a level
commensurate with the early stage of
exploration.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
N/A
Dry and wet drill samples were collected at
the drill collar. After passing through the
sample hose and into the drill cyclone the
samples pass through a riffle splitter to
homogenise the sample and to nullify the
effects of particulate gold. After splitting, the
sample was collected in a calico bag, ready
for assaying.
The samples are considered to effectively
represent the rock at the point of collection.
Sampling included Catalina Resources
standard QAQC procedures. Quality Control
on the RC drill rig included insertion of
duplicate samples to test lab repeatability,
insertion of standards to verify lab assay
accuracy and cleaning and inspection of
sample assembly. A standard or duplicate
was inserted every 20th to 25th sample.
The sample sizes and analysis size are
considered appropriate to correctly represent
the mineralisation based on the style of
mineralisation, sampling methodology and
assay value ranges for the commodities of
interest.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
Assay results are reported for samples
submitted to ALS Laboratories, Western
Australia, an independent NATA-accredited
laboratory. Samples were prepared using
industry standard techniques including
drying, crushing to 70% passing 2 mm, rotary
splitting, and pulverisation to 85% passing 75
µm. Analytical methods included aqua regia
digestion with ICP-AES finish for multi-
14
Criteria JORC Code explanation Commentary
applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias) and precision have been established.
element analysis (ME-ICP41) and ore-grade
methods for copper (ME-OG46 and Cu-
OG46), which are considered appropriate for
the style of mineralisation being tested.
The ALS lab inserts its own standards and
blanks at set frequencies and monitors the
precision of the analyses. As well, the lab
performs repeat analyses at random
intervals, which return acceptably similar
values to the original samples.
Laboratory procedures are within industry
standards and are appropriate for the
commodities of interest.
The samples are considered to effectively
represent the rock at the point of collection,
with RC sampling undertaken at consistent 1
m intervals. Catalina Resources implemented
standard QA/QC procedures including the
insertion of certified reference materials,
blanks and duplicates. Results from these
controls demonstrate acceptable levels of
accuracy and precision, with no material
contamination or analytical bias identified.
Verification
of sampling
and assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
Consultant geologists, from Apex
Geoscience, were involved in the logging of
the RC drilling. Apex was involved in the
whole process including drill hole
supervision, chip sample collection and
importing of the completed assay results.
Drill hole logs were inspected to verify the
correlation of mineralized zones between
assay results and
lithology/alteration/mineralisation. The entire
chain of custody of this recent drilling was
supervised by Xirlatem and Catalina
Resources.
The drill hole data was logged in a locked
excel logging template and then stored in a
Microsoft Access database structure for long
term storage and validation.
Xirlatem personnel undertook independent
review and verification of geological logging
and chip tray observations, including visual
estimates of sulphide abundance and mineral
identification, providing an additional level of
quality control over geological data and
interpretation.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
RC drill hole locations were picked up using a
handheld Garmin GPS, considered to be
accurate to ± 5 m.
15
Criteria JORC Code explanation Commentary
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
Downhole surveys have been completed at 30
m stations (and start and end of hole) using a
downhole gyroscopic survey tool.
All coordinates were recorded in MGA Zone
51 datum GDA94.
Topographic control is provided by a Digital
Terrain Model based on the 90 m Shuttle
Radar Topographic Mission data.
Drill hole details are in Appendix 1 of this
announcement.
Data
spacing and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity
appropriate for the Mineral Resource and
Ore Reserve estimation procedure(s) and
classifications applied.
• Whether sample compositing has been
applied.
Drill holes were sited in a position to intercept
the previously identified diamond drilling
mineralisation, aiming to obtain grade and
width information.
The orientation of the mineralisation is not yet
defined, at this stage of exploration.
N/A as no resource estimate is made.
No compositing has been conducted.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Appendix 1 tables the MGA coordinates, of
each hole.
RC drilling is a hammer percussion technique
to shatter the rock and does not allow rock
structures to be seen.
Drilling is assumed to intersect the
mineralised structures at right angles. 7
holes were drilled at -60 degrees to the west.
Until Catalina ascertains all assays back or
conduct diamond drilling, Catalina is
uncertain of the geometry of the mineralised
structures.
Sample
security
• The measures taken to ensure sample
security.
Drill samples were placed into calico bags
measuring 14 in x 12 in. They were then
placed into larger poly weave bags which
were sealed with cable ties and then
transported to the ALS lab in Kalgoorlie.
A sample submission outlining assay
instructions was provided to ALS.
ALS maintains the chain of custody once the
samples are received at the laboratory, with a
full audit trail available via the ALS website.
The chain of custody for samples from
collection to delivery at the laboratory was
handled by Apex Geoscience and Xirlatem
personnel.
16
Criteria JORC Code explanation Commentary
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
At this stage of exploration, no external audit
or review has been undertaken.
The work was carried out by reputable
companies and laboratories using industry
best practice.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number,
location and ownership including
agreements or material issues with
third parties such as joint ventures,
partnerships, overriding royalties,
native title interests, historical
sites, wilderness or national park
and environmental settings.
• The security of the tenure held at
the time of reporting along with any
known impediments to obtaining a
licence to operate in the area.
The Breakaway Dam Copper Prospect is
located on E29/1037. The Company has
entered into a binding agreement to acquire
the tenement from Forrestania Resources
Ltd.
The project is on Nyalpa Pirniku determined
native title land. There are no private
royalties or encumbrances on E29/1037.
The tenement is in good standing with all
obligations and minimum expenditure
commitments met.
Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration by other parties.
Historical prospecting pits of an unknown
vintage tested surface copper expressions
at Breakaway Dam. Modern exploration of
the area for copper began with soil
sampling from 1997 by Delta Gold and
subsequent soils and RAB drilling by Pelican
Resources up to 2004.
Amex Resources worked the prospect from
2007 to 2010 with surface moving loop
electromagnetics (MLEM) and RC drilling of
modelled conductors. Diamond drilling
returned percent level copper intercepts
over narrow widths and follow-up downhole
electromagnetics (DHEM) refined the
electromagnetic model with modelled
offhole conductors, one of which is large
and highly conductive.
In 2025 Forrestania Resources undertook
surface sampling and a general
geochemistry review through Camp Oven
Exploration. That review concludes that the
project is highly anomalous in copper
pathfinder elements consistent with
17
Criteria JORC Code explanation Commentary
volcanogenic massive sulphide (VMS)
mineralisation.
Additionally in 2025 Forrestania undertook
diamond drilling and downhole
electromagnetic (DHEM) which confirmed
mineralisation consistent with a copper-
rich Volcanogenic Massive Sulphide (VMS)
system
The drilling campaign intersected thick
sulphide-rich horizons supported by strong
downhole EM responses.
Geology • Deposit type, geological setting
and style of mineralization.
The Breakaway Dam Prospect is within the
Alexandra Bore Greenstone Belt, an
isolated sliver of monzogranite–bound
greenstone that hosts multiple copper-
bearing gossanous outcrops and
pegmatites.
The target stratigraphy is a package of
metasedimentary rocks layered between
two granitoid bodies, both of which are
dominated by coarse variably foliated
granite with common aplitic and pegmatitic
secondary phases.
The metasedimentary pack