Pilbara Gold Acquisition and Laverton Drilling Confirms Gold
Released
Released
Announcement PDF
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 1 of 28
catalinaresources.com.au
ASX Announcement
6 October 2025
Catalina to Acquire Pilbara Gold Project and
Drilling Confirms Gold Mineralisation at Halo
Project in Laverton
Highlights Beasley Creek
• Agreement entered with North Andover Minerals Pty Ltd to acquire 100% interest in the Beasley
Creek Project (E47/3490).
• Licence lies on the northern flank of the Rocklea Dome, ~60 km west of Tom Price and ~80 km
from Paulsens Gold Operation and covers ~46 km² of prospective tenure within a proven gold
district with strong infrastructure access.
• Mineralisation potential across two styles:
• Structurally controlled orogenic gold in Archean greenstones (quartz veins, shear
zones).
• Conglomerate-style gold along a 16km unconformity corridor in the Hardey Formation.
• Historical drilling intersected up to 4m @ 11.5 g/t Au (RRC15) 1
with multiple additional
anomalous soil, stream, and rock chip results.
• Comprehensive exploration database (1,300+ samples, 2,323 line-km aeromagnetics, detailed
mapping) provides immediate leverage for reinterpretation and targeting.
• Immediate priority to review historical data to refine and rank targets, before moving into
exploration drilling.
Highlights Laverton
• First assay results from 3 of 10 holes - LVRC06, LVRC07 and LVRC08 substantiate the Halo
Project (Laverton) as a highly prospective gold system, with mineralisation open along strike
and down plunge.
• Significant shallow and deeper intersections demonstrate both near-surface and down-dip
mineralisation, supporting the potential for a mineralised system with continuity across
multiple levels. Intersections include:
• 17m @ 0.90g/t Au from 44m (LVRC06)
• 2m @ 3.79g/t Au from 190m (LVRC07)
• 5m @ 2.62g/t Au from 217m (LVRC07)
• 2m @ 2.55g/t Au from 58m (LVRC08)
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 2 of 28
catalinaresources.com.au
• Results complement previous drilling2,3,4
which returned:
• 28m @ 1.09g/t Au from 57m, incl. 1m @ 9.69g/t Au (LVAC049)
• 18m @ 1.16g/t Au from 126m, incl. 5m @ 2.3g/t Au (LVRC02)
• Mineralisation hosted within a deeply weathered dolerite package with hydrothermal
alteration, consistent with broader Laverton systems, and strategically positioned near
established haul roads, transport routes and processing facilities.
Catalina Resources Ltd (“Catalina” or “the Company”) is pleased to announce it has secured a 100% interest in
the Beasley Creek Gold Project, a highly prospective licence on the northern flank of the Rocklea Dome in Western
Australia’s Pilbara Craton.
The Project is situated on the northern flank of the Rocklea Dome – a geological feature comprising ancient
Archean and later intrusions, and a bedrock geology of monzogranite and mafic/ultramafic bodies – in Australia’s
Pilbara Craton.
The wider district (Figure 1) hosts an array of proven gold resources – including former Northern Star’s Paulsens
Gold Operation, which recovered 907,344oz @ 7.3 g/t Au for an average of ~75kozpa between 2005-20175
. This
asset has since been acquired by Black Cat Syndicate for the purpose of remnant mining within the existing
resource, achieving its first gold pour in December 20246
.
Figure 1 – Regional location diagram of the Beasley Gold Project (E47/3490)
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 3 of 28
catalinaresources.com.au
Beasley Creek Mineralisation
The Beasley Creek project offers two distinct styles of gold potential: structurally controlled‘orogenic’gold hosted
in Archean greenstones, where quartz veins and shear zones have already shown strong anomalism, and
conglomerate-stylegold alongtheHardey Formationunconformity,a16 kmcorridor wherecoarsesediments have
the potential to trap and concentrate gold at surface contacts3
(Figure 2).
Together these models provide multiple pathways to discovery in a proven Pilbara setting, with lithium anomalism
as optional upside.
Figure 2 – Beasley Creek Regional Geology
Previous Exploration
The Beasley Creek Project has been subject to historic RC drilling, which intersected 4m @ 11.5 g/t Au (RRC15, 20–
24m); with multiple additional anomalous results in soils, streams, and rock chips (Figure 3)7,8
.
Castle Minerals subsequently undertook geochemical sampling, rock chip surveys, and a high-resolution
aeromagnetic program between 2017 and 2024, which outlined multiple anomalous gold corridors and drill-ready
targets9
(Figures 4 and 5).
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 4 of 28
catalinaresources.com.au
Whilehistoricalprogramsconfirmedwidespreadanomalismandsystemfertility,thearearemainslargelyuntested
by systematic drilling since the late 1990s.
As part of the acquisition, Catalina will secure a comprehensive dataset comprising more than 1,300 soil, stream,
and rock chip samples, 2,323 line-km of reprocessed aeromagnetic and radiometric surveys10
, and detailed
geological mapping.
This dataset provides a ready-made platform for reinterpretation and rapid target generation, positioning Catalina
to be the first to systematically drill-test this highly prospective ground in more than two decades.
Figure 3 – Previous exploratory activity by Castle Minerals Ltd
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 5 of 28
catalinaresources.com.au
Figure 4 – Beasley Creek Project Tenements, Targets and Previous Exploration
Figure 5 – Aeromagnetic Imagery
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 6 of 28
catalinaresources.com.au
Strategic Significance
The Beasley Creek acquisition establishes Catalina’s first district-scale footprint in the Pilbara, creating a
complementary growth hub to its Yilgarn and Laverton portfolios. The Project offers two clear discovery pathways
— shear-hosted orogenic gold and conglomerate-style gold along a 16km unconformity — neither of which has
been systematically drill-tested in more than two decades.
Importantly, Beasley Creek comes with a complete dataset and proximity to established operations and
infrastructure, providing low-cost optionality for development and the potential to accelerate value creation.
Together with Catalina’s Yilgarn and Laverton assets, Beasley Creek positions the Company as a multi-district
explorer with multiple shots on goal across Western Australia’s most productive gold provinces.
Royalty
The Beasley Creek Project is subject to existing royalties of 2% NSR.
Key Commercial Terms
The Company has entered into an acquisition agreement with North Andover Minerals Pty Ltd (“Seller”) to acquire
100% interest in the Beasley Creek Project (E47/3490) (the“Tenement”). The material terms of the acquisition are
summarised below:
Conditions
Precedent
Completion of the acquisition (“Completion”) is conditional upon the satisfaction (or waiver by Catalina) of various
conditions precedent, including
(a) completion of financial, legal and technical due diligence by Catalina on the Tenement, to the absolute
satisfaction of Catalina on or before 15 October 2025;
(b) the completion of the transfer of the Tenement into the name of the Seller;
(c) Catalina obtaining shareholder approval for the issue of the consideration (as outlined below); and
(d) the Parties obtaining all necessary regulatory and third party approvals necessary to complete the matters
set out in the acquisition agreement (including entry into deeds of assignment and assumption).
If the conditions precedent are not satisfied (or waived) by the date specified above, or otherwise on or before 5:00 pm
(Perth time) on 31 March 2026, any party may terminate the acquisition agreement.
Consideration Catalina has agreed, to issue the Seller (or its nominee):
(a) 15,000,000 fully paid ordinary shares (“Shares”);
(b) 35,000,000 Performance Rights which will vest upon Catalina announcing a drilling intercept of ≥10m @ 1 g/t
Au (or Au equivalent) and/or ≥1m @ 10 g/t Au (or Au equivalent) at the Tenement within 36 months following
Completion; and
(c) 100,000,000 Performance Rights which will vest upon Catalina announcing the achievement of an Inferred
Mineral Resource (as defined in the JORC Code (2012 Edition)) of ≥200,000 oz Au (or Au equivalent) at a cut-
off grade of >0.5 g/t on the Tenement within 48 months following Completion.
Catalina will use reasonable endeavours to satisfy the milestones attaching to the Performance Rights outlined above. The
issue of the Performance Rights will be subject to shareholder approval.
Executive Director Ross Cotton commented:
“The Beasley Creek Project is an ideal fit with Catalina’s “under-explored belts” focus. The strategy behind this
acquisition mirrors that of our recent Yerilgee and Evanston greenstone belt acquisitions, reinforcing an approach
of consolidating prospective ground and advancing it quickly.
The Beasley Creek Project displays all the growth-centric characteristics we look for in an early-stage asset: clear
geological rationale, defined anomalies, limited modern drilling; meaning plenty of scope for rapid, value-adding
work.”
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 7 of 28
catalinaresources.com.au
Drilling Confirms Gold Mineralization at Halo Project, Laverton
In addition to the acquisition of the Beasley Creek Project Catalina advises the first suite of results from its recent
11-hole, RC drill programme at its Halo Gold Project (within the greater Laverton Gold Project) has intersected
significant mineralisation, including 17m @ 0.90g/t Au from 44m (LVRC06), 2m @ 2.55g/t Au from 58m and 2m at
2.32g/t Au from 109m in hole LVRC08.
Additional promising intercepts from hole LVRC07 included 2m @ 3.79g/t Au from 190m and 5m @ 2.62g/t Au from
217m (See Figure 6 and Appendix 1 for significant Au intercept (>0.5g/t)).
A further 1,140 samples from the company’s 2,040 metre drill program have been submitted to the assay
laboratory, with results expected over the coming weeks.
The results from the first results determine the Halo Gold Project (Figure 7), the very first target within the broader
Laverton Gold Project, as an outstanding opportunity in a highly regarded mineral district.
Figure 6 – Cross Section RC drilling within the Halo Gold Discovery
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 8 of 28
catalinaresources.com.au
Figure 7 – Area of anomalous geochemical gold halo interpreted from previous aircore drilling
Geological Information and Observations
The Halo Gold Project lies along the Barnicoat Shear Zone (BSZ), a regionally significant structural corridor that
also hosts the Lily Pond Well, Mon Ami, and Ida H gold resources (Figure 8). Geophysical interpretations indicate
that the BSZ transects Catalina’s tenement, providing a strong structural setting for the observed mineralisation.
This context underpins Catalina’s rationale for systematic drilling to test for extensions along strike and at depth.
Reverse circulation (RC) drilling intersected a deeply weathered dolerite package characterized by pervasive
carbonate alteration and localised sericite alteration, indicating significant hydrothermal fluid activity. Within this
altered dolerite, several zones of intense sericite and carbonate alteration were identified, suggesting structurally
controlled fluid flow, potentially along shear zones or faults. Mineralisation is present within the saprolite profile,
likely representing a weathered expression of underlying primary mineralisation, and is also observed adjacent to
the intensely sericite/carbonate altered zones in fresh rock. Notably, the higher-grade zones of primary
mineralisation appear to be spatially associated with the carbonate/sericite altered dolerite immediately adjacent
to these zones.
This spatial relationship implies that the intense alteration zones may have acted as conduits for mineralising
fluids. This highlights the importance of alteration mapping and structural interpretation in targeting additional
mineralisation along strike, both in the weathered profile and in fresh rock at depth.
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 9 of 28
catalinaresources.com.au
Two additional lines spaced 50 m apart have been completed to the north and south of 6810850N cross section in
order to test the northern and southern strike extension to this mineralisation. These samples are at the laboratory
and are awaiting results.
The Company’s broader tenement beyond the Halo Project extends significantly to the east, which means that –
should the perceived easterly extension materialise – the targets would sit within existing holdings.
Regional Overview
The Laverton district is recognised as one of Australia’s most productive gold provinces, with a long history of
discovery and development. Within a 50-kilometre radius of the Halo Project lie some of the country’s most
significant gold operations, including Granny Smith and Sunrise Dam (AngloGold Ashanti), Wallaby (Gold Fields),
and additional deposits such as Mon Ami and Ida H (Figure 9.). Collectively, these systems highlight the proven
endowment of the Laverton Tectonic Zoneand its ability to host large, long-lived golddeposits. While Haloremains
at an early stage of exploration, its location along the Barnicoat Shear Zone places it within the same fertile
geological framework that underpins these established mines, providing a strong basis for systematic follow-up.
In addition to this regional geological advantage, the Halo Project is strategically located in close proximity to
established haul roads, transport corridors, and several operating processing facilities. This infrastructure setting
provides Catalina with multiple options for potential development pathways and creates opportunities to leverage
existing regional capacity, rather than committing to the capital intensity of standalone infrastructure. The
combination of proven geology and strong infrastructure support underscores both the commercial potential and
the strategic positioning of the Halo Gold Project.
Figure 8 – The Barnicoat Shear Zone is a significantly
mineralised structure with several significant gold
deposits scattered along its length
Figure 9 – Regional location diagram of the
Laverton Gold Project and E38/3697
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 10 of 28
catalinaresources.com.au
Next Steps
Pending assay results, representing 1,140 samples, will be compiled and validated. Once received, these assays
will be integrated into the existing dataset, allowing for an updated interpretation of mineralisation continuity and
grade distribution across the project area.
Petrographic studies will be initiated following receipt of the full assay dataset. This will ensure that representative
samples from both mineralised and unmineralised zones are selected, with results expected to provide greater
detail on host lithologies, alteration assemblages, and sulphide development.
The outcome of these activities will inform the design of the next phase of drilling. Follow-up work is expected to
focus on assessing strike extensions to the north, south, and east of 6810850N and testing continuity of
mineralisation within the interpreted feeder structure and broader halo system.
On the Halo Project results Executive Director Ross Cotton commented:
“Catalina’s receipt of encouraging RC assay results from the Halo Project, combined with the recent acquisition of
the Beasley Creek Project, highlights our clear strategy of acquiring and systematically exploring prospective gold
assetsacrossWesternAustralia.TheCompanyisfocusedonadvancingprojectslocatedwithinprovenmineralised
corridors, where our exploration programs can quickly test and define gold systems with the potential to add value
for shareholders
This announcement has been authorised for release by the Executive Director.
Contacts
Investors / Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6165 8858
References (ASX)
This Report contains information extracted from ASX market announcements reported in accordance with the
2012 edition of the“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”
(“2012 JORC Code”). Further details (including 2012 JORC Code reporting tables where applicable) of exploration
results referred to in this announcement can be found in the following announcements lodged on the ASX:
1
CDT ASX Announcement 21 February 2018: Beasley Creek Prospectivity Enhanced
2
CTN ASX Announcement 1 November 2024: Catalina intersects 44m at 1.01g/t gold at Laverton
3
CTN ASX Announcement 8 January 2025: Gold and REE Intersections Upgraded at Laverton
4
CTN ASX Announcement 1 August 2025: Catalina Intersects Wide Gold Zones in Maiden Drilling
5
BC8 ASX Announcement 28 March 2023: Paulsens Corridor Exploration Update - Cu-Ag-Au Potential
6
BC8 ASX Announcement 23 December 2024: Paulsens First Gold!
7
CDT ASX Announcement 13 December 2018: Visible Gold in 21 Bulk Stream Sediment
8
CDT ASX Announcement 5 August 2021: Beasley Creek Soil Sampling Outlines Gold Corridor
9
CDT Announcement 29 January 2022: Soil Sampling Delineates Gold Drill Targets and Lithium Anomalies at Beasley Creek
10
CDT Announcement 29 March 2021: Aeromagnetic Survey Commences at Beasley Creek
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 11 of 28
catalinaresources.com.au
The Company confirms that it is not aware of any new information or data that materially affects the information in
the original reports, and that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original reports.
Competent Person Statement
The information in this report that relates to the exploration activities within Laverton are based on information
compiled by Mr. S Nicholls, who is a Member of the Australian Institute of Geoscientists and full time employee of
Apex Geoscience. Mr Nicholls has sufficient experience which is relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr. Nicholls consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
Where theCompany refers to theMineral Resourcesin this report (referencingprevious releases madeto the ASX),
it confirms that it is not aware of any new information or data that materially affects the information included in
that announcement and all material assumptions and technical parameters underpinning the Mineral Resource
estimate with that announcement continue to apply and have not materially changed.
Forward-Looking Statements
This announcement contains forward-looking statements that are subject to a range of risks and uncertainties.
These statements relate to the Company’s expectations, intentions, or strategies regarding the future. These
statements can be identified by the use of words like“anticipate”,“believe”,“intend”,“estimate”,“expect”,“may”,
“plan”,“project”,“will”,“should”,“seek”and similar words or expressions containing same. These forward-looking
statements reflect the Company’s views and assumptions with respect to future events as of the date of this
release and are subject to a variety of unpredictable risks, uncertainties, and other unknowns. Actual and future
results and trends could differ materially from those set forth in such statements due to various factors, many of
which are beyond our ability to control or predict. These include, but are not limited to, risks or uncertainties
associated with the acquisition and divestment of projects (including risks associated with completing due
diligenceand,iffavourableresultsareobtained,proceedingwiththeacquisitionoftheBeasleyCreekProject),joint
venture and other contractual risks, metal prices, exploration, development and operating risks, competition,
production risks,sovereign risks,regulatory risks including environmental regulation and liability andpotential title
disputes, availability and terms of capital and general economic and business conditions.
Given these uncertainties, no one should place undue reliance on any forward-looking statements attributable to
the Company, or any of its affiliates or persons acting on its behalf. Subject to any continuing obligations under
applicable law the Company disclaims any obligation or undertaking to disseminate any updates or revisions to
any forward looking statements in this announcement to reflect any change in expectations in relation to any
forward looking statements or any change in events, conditions or circumstances on which any such statement is
based.
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development company
whose vision is to create shareholder value through the successful exploration of prospective gold, base metal,
lithium and iron ore projects and the development of these projects into production.
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 12 of 28
catalinaresources.com.au
Appendix 1. 2025 RC Significant Intersections (Assays > 0.5g/t Au with no more than 2m consecutive internal waste).
Hole Id From (m) To (m)
Width
(m
Gold
(g/t) Significant Intersection
LVRC06 35 36 1 0.73 1m @ 0.73g/t Au from 35m
LVRC06 38 40 2 0.62 2m @ 0.62g/t Au from 38m
LVRC06 44 61 17 0.90 17m @ 0.90g/t Au from 44m
LVRC06 64 69 5 0.98 5m @ 0.98g/t Au from 64m
LVRC06 74 82 8 0.98 8m @ 0.98g/t Au from 74m
LVRC07 58 62 4 0.68 4m @ 0.68g/t Au from 58m
LVRC07 69 70 1 0.62 1m @ 0.62g/t Au from 69m
LVRC07 131 132 1 0.86 1m @ 0.86g/t Au from 131m
LVRC07 156 158 2 0.73 2m @ 0.73g/t Au from 156m
LVRC07 185 187 2 0.76 2m @ 0.76g/t Au from 185m
LVRC07 190 192 2 3.79 2m @ 3.79g/t Au from 190m
Including 191 192 1 6.25 1m @ 6.25g/t Au from 191m
LVRC07 197 198 1 0.55 1m @ 0.55g/t Au from 197m
LVRC07 217 222 5 2.62 5m @ 2.62g/t Au from 217m
Including 220 221 1 7.48 1m @ 7.48g/t Au from 220m
LVRC07 237 238 1 2.15 1m @ 2.15g/t Au from 237m
LVRC07 249 250 1 0.84 1m @ 0.84g/t Au from 249m
LVRC08 58 60 2 2.55 2m @ 2.55g/t Au from 58m
LVRC08 82 83 1 0.55 1m @ 0.55g/t Au from 82m
LVRC08 97 101 4 1.23 4m @ 1.23g/t Au from 97m
LVRC08 109 111 2 2.32 2m @ 2.32g/t Au from 109m
LVRC09
Pending
Results
LVRC10
Pending
Results
LVRC11
Pending
Results
LVRC12
Pending
Results
LVRC13
Pending
Results
LVRC14
Pending
Results
LVRC15
Pending
Results
LVRC16
Pending
Results
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 13 of 28
catalinaresources.com.au
Appendix 2. 2025 RC drilling assays.
Hole Id Depth
From
Depth
To
Gold Hole Id Depth
From
Depth
To
Gold Hole Id Depth
From
Depth
To
Gold Hole Id Depth
From
Depth
To
Gold
Units m m ppm Units m m ppm Units m m ppm Units m m ppm
Det.
Limit 0.01
Det.
Limit 0.01
Det.
Limit 0.01
Det.
Limit 0.01
LVRC06 0 1 <0.01 LVRC06 44 45 2.35 LVRC06 88 89 0.11 LVRC07 0 1 0.02
LVRC06 1 2 <0.01 LVRC06 45 46 0.07 LVRC06 89 90 0.14 LVRC07 1 2 <0.01
LVRC06 2 3 <0.01 LVRC06 46 47 0.57 LVRC06 90 91 0.06 LVRC07 2 3 <0.01
LVRC06 3 4 <0.01 LVRC06 47 48 1.55 LVRC06 91 92 <0.01 LVRC07 3 4 <0.01
LVRC06 4 5 <0.01 LVRC06 48 49 0.13 LVRC06 92 93 <0.01 LVRC07 4 5 <0.01
LVRC06 5 6 <0.01 LVRC06 49 50 0.13 LVRC06 93 94 <0.01 LVRC07 5 6 0.02
LVRC06 6 7 0.01 LVRC06 50 51 2.47 LVRC06 94 95 0.03 LVRC07 6 7 <0.01
LVRC06 7 8 <0.01 LVRC06 51 52 0.33 LVRC06 95 96 <0.01 LVRC07 7 8 0.01
LVRC06 8 9 <0.01 LVRC06 52 53 0.64 LVRC06 96 97 0.13 LVRC07 8 9 <0.01
LVRC06 9 10 0.01 LVRC06 53 54 0.64 LVRC06 97 98 0.23 LVRC07 9 10 <0.01
LVRC06 10 11 0.01 LVRC06 54 55 0.78 LVRC06 98 99 0.11 LVRC07 10 11 <0.01
LVRC06 11 12 0.01 LVRC06 55 56 0.63 LVRC06 99 100 0.22 LVRC07 11 12 0.02
LVRC06 12 13 0.01 LVRC06 56 57 0.19 LVRC06 100 101 0.11 LVRC07 12 13 <0.01
LVRC06 13 14 0.01 LVRC06 57 58 1.81 LVRC06 101 102 0.05 LVRC07 13 14 <0.01
LVRC06 14 15 0.22 LVRC06 58 59 2.12 LVRC06 102 103 <0.01 LVRC07 14 15 <0.01
LVRC06 15 16 <0.01 LVRC06 59 60 0.04 LVRC06 103 104 <0.01 LVRC07 15 16 <0.01
LVRC06 16 17 <0.01 LVRC06 60 61 0.81 LVRC06 104 105 <0.01 LVRC07 16 17 <0.01
LVRC06 17 18 <0.01 LVRC06 61 62 0.41 LVRC06 105 106 <0.01 LVRC07 17 18 <0.01
LVRC06 18 19 <0.01 LVRC06 62 63 0.02 LVRC06 106 107 <0.01 LVRC07 18 19 <0.01
LVRC06 19 20 <0.01 LVRC06 63 64 0.15 LVRC06 107 108 <0.01 LVRC07 19 20 <0.01
LVRC06 20 21 <0.01 LVRC06 64 65 0.84 LVRC06 108 109 0.06 LVRC07 20 21 <0.01
LVRC06 21 22 <0.01 LVRC06 65 66 1.06 LVRC06 109 110 0.14 LVRC07 21 22 0.02
LVRC06 22 23 0.01 LVRC06 66 67 1.61 LVRC06 110 111 0.01 LVRC07 22 23 <0.01
LVRC06 23 24 <0.01 LVRC06 67 68 0.58 LVRC06 111 112 0.34 LVRC07 23 24 <0.01
LVRC06 24 25 <0.01 LVRC06 68 69 0.81 LVRC06 112 113 0.06 LVRC07 24 25 <0.01
LVRC06 25 26 <0.01 LVRC06 69 70 0.27 LVRC06 113 114 <0.01 LVRC07 25 26 <0.01
LVRC06 26 27 <0.01 LVRC06 70 71 0.44 LVRC06 114 115 <0.01 LVRC07 26 27 <0.01
LVRC06 27 28 <0.01 LVRC06 71 72 0.25 LVRC06 115 116 0.19 LVRC07 27 28 0.01
LVRC06 28 29 <0.01 LVRC06 72 73 0.22 LVRC06 116 117 0.37 LVRC07 28 29 <0.01
LVRC06 29 30 <0.01 LVRC06 73 74 0.39 LVRC06 117 118 0.05 LVRC07 29 30 <0.01
LVRC06 30 31 <0.01 LVRC06 74 75 1.11 LVRC06 118 119 0.03 LVRC07 30 31 <0.01
LVRC06 31 32 0.01 LVRC06 75 76 1.75 LVRC06 119 120 0.05 LVRC07 31 32 <0.01
LVRC06 32 33 <0.01 LVRC06 76 77 2.26 LVRC06 120 121 <0.01 LVRC07 32 33 <0.01
LVRC06 33 34 0.01 LVRC06 77 78 0.85 LVRC06 121 122 0.02 LVRC07 33 34 <0.01
LVRC06 34 35 <0.01 LVRC06 78 79 0.35 LVRC06 122 123 0.06 LVRC07 34 35 <0.01
LVRC06 35 36 0.73 LVRC06 79 80 0.2 LVRC06 123 124 <0.01 LVRC07 35 36 <0.01
LVRC06 36 37 0.04 LVRC06 80 81 0.56 LVRC06 124 125 0.13 LVRC07 36 37 <0.01
Catalina Resources Limited
ACN 130618683
ASX:CTN
T: 61 8 6165 8858
E: info@catalinaresources.com.au
A : Level 2 / 7 Havelock Street West Perth
WA 6005 Australia
Page 14 of 28
catalinaresources.com.au
LVRC06 37 38 0.02 LVRC06 81 82 0.74 LVRC06 125 126 0.08 LVRC07 37 38 <0.01
LVRC06 38 39 0.66 LVRC06 82 83 0.15 LVRC06 126 127 0.03 LVRC07 38 39 <0.01
LVRC06 39 40 0.58 LVRC06 83 84 0.36 LVRC06 127 128 0.08 LVRC07 39 40 <0.01
LVRC06 40 41 0.14 LVRC06 84 85 0.19 LVRC06 128 129 0.12 LVRC07 40 41 <0.01
LVRC06 41 42 0.04 LVRC06 85 86 0.06 LVRC06 129 130 0.02 LVRC07 41 42 <0.01
LVRC06 42 43 0.41 LVRC06 86 87 0.25 LVRC06 130 131 0.01 LVRC07 42 43 <0.01
LVRC06 43 44 0.17 LVRC06 87 88 0.18 LVRC06 131 132 <0.01 LVRC07 43 44 <0.01
LVRC07 44 45 <0.01 LVRC07 92 93 0.04 LVRC07 140 141 <0.01 LVRC07 188 189 0.06
LVRC07 45 46 <0.01 LVRC07 93 94 0.04 LVRC07 141 142 0.02 LVRC07 189 190 0.29
LVRC07 46 47 <0.01 LVRC07 94 95 0.01 LVRC07 142 143 0.04 LVRC07 190 191 1.33
LVRC07 47 48 <0.01 LVRC07 95 96 0.03 LVRC07 143 144 0.02 LVRC07 191 192 6.25
LVRC07 48 49 <0.01 LVRC07 96 97 0.02 LVRC07 144 145 <0.01 LVRC07 192 193 0.18
LVRC07 49 50 <0.01 LVRC07 97 98 0.03 LVRC07 145 146 0.01 LVRC07 193 194 0.47
LVRC07 50 51 <0.01 LVRC07 98 99 0.12 LVRC07 146 147 <0.01 LVRC07 194 195 0.22
LVRC07 51 52 <0.01 LVRC07 99 100 0.09 LVRC07 147 148 0.03 LVRC07 195 196 0.1
LVRC07 52 53 0.02 LVRC07 100 101 0.05 LVRC07 148 149 0.03 LVRC07 196 197 0.15
LVRC07 53 54 <0.01 LVRC07 101 102 0.08 LVRC07 149 150 0.2 LVRC07 197 198 0.55
LVRC07 54 55 0.02 LVRC07 102 103 0.03 LVRC07 150 151 0.17 LVRC07 198 199 0.43
LVRC07 55 56 0.01 LVRC07 103 104 <0.01 LVRC07 151 152 0.07 LVRC07 199 200 0.1
LVRC07 56 57 0.02 LVRC07 104 105 <0.01 LVRC07 152 153 0.05 LVRC07 200 201 0.13
LVRC07 57 58 <0.01 LVRC07 105 106 <0.01 LVRC07 153 154 0.49 LVRC07 201 202 0.14
LVRC07 58 59 1.71 LVRC07 106 107 <0.01 LVRC07 154 155 0.27 LVRC07 202 203 0.38
LVRC07 59 60 0.12 LVRC07 107 108 0.04 LVRC07 155 156 0.35 LVRC07 203 204 0.39
LVRC07 60 61 0.06 LVRC07 108 109 0.04 LVRC07 156 157 0.94 LVRC07 204 205 0.31
LVRC07 61 62 0.82 LVRC07 109 110 0.06 LVRC07 157 158 0.51 LVRC07 205 206 0.06
LVRC07 62 63 0.11 LVRC07 110 111 0.02 LVRC07 158 159 0.07 LVRC07 206 207 0.14
LVRC07 63 64 0.14 LVRC07 111 112 0.09 LVRC07 159 160 0.21 LVRC07 207 208 0.02
LVRC07 64 65 0.11 LVRC07 112 113 0.03 LVRC07 160 161 0.09 LVRC07 208 209 0.03
LVRC07 65 66 0.09 LVRC07 113 114 0.03 LVRC07 161 162 0.08 LVRC07 209 210 0.03
LVRC07 66 67 0.23 LVRC07 114 115 0.01 LVRC07 162 163 0.06 LVRC07 210 211 0.06
LVRC07 67 68 0.15 LVRC07 115 116 0.02 LVRC07 163 164 0.01 LVRC07 211 212 0.06
LVRC07 68 69 0.08 LVRC07 116 117 0.09 LVRC07 164 165 <0.01 LVRC07 212 213 <0.01
LVRC07 69 70 0.62 LVRC07 117 118 0.06 LVRC07 165 166 0.06 LVRC07 213 214 0.02
LVRC07 70 71 0.28 LVRC07 118 119 0.26 LVRC07 166 167 0.07 LVRC07 214 215 0.01
LVRC07 71 72 0.15 LVRC07 119 120 0.12 LVRC07 167 168 0.1 LVRC07 215 216
Share your feedback
Discover