Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
Page 1
Quarterly Activities Report period ending 30 June 2026
HIGHLIGHTS
Mid-West Gold Portfolio Acquisition
➢ Completed the acquisition of the Kirkalocka, Pithara, Tallering and Warriedar projects,
significantly expanding Catalina's existing Mid-West gold portfolio.
➢ Undertook a $3.0 million placement to fund the acquisition and ongoing exploration activities.
➢ Established a district-scale landholding surrounding the Kirkalocka Gold Mine and
processing infrastructure, supporting Catalina's strategy to build a significant Mid-West gold
platform.
➢ Completed comprehensive reviews of historical exploration data across the newly acquired
assets, confirming multiple high-priority exploration targets and progressing the portfolio
toward maiden drilling programs.
Central Yilgarn
➢ All assay results received across Evanston and Yerilgee, confirming consistent gold
mineralisation across multiple prospects.
➢ Palisade Gold Project established, consolidating Chicken Little, Snowflake, T8 and Megatron
into a 12–14 km mineralised corridor.
➢ Clear potential to expand with substantial untested strike remaining at Megatron including
historical result of 9m @ 2.6 g/t Au from 23m (incl. 3m @ 7.1 g/t Au from 26m).
Breakaway Dam
➢ Maiden drilling results expanded strike from ~700m to ~1.2km, demonstrating growth in the
mineralised footprint.
➢ Copper-rich intercepts returned from drilling, including:
o 1.9m (ETW) @ 2.17% Cu from 198m (BDCRC26016)
o 2.9m (ETW) @ 0.57% Cu from 204m (BDCRC26014)
o 3.8m (ETW) @ 0.31% Cu from 124m (BDCRC26016)
➢ Mineralisation intersected across multiple positions and depths.
➢ Strong geophysical responses across all holes, providing clear vectors for follow-up drilling.
➢ Priority targets identified for next phase drilling, including a larger, coherent zone.
Beasley Creek
➢ Exploration footprint expanded and drill targets refined at the Beasley Creek Project
following recent soil and rock chip programs.
➢ Gold, copper and zinc soil anomalies expanded, increasing the scale of the interpreted
mineralised footprint.
➢ New geochemical data strengthens interpretation of a coherent Au–Ag–Cu ± Pb–Zn
mineralised system.
➢ Results demonstrate clear metal zonation, with Flamingo representing a broad copper-
dominant system and Golden Hand a higher-intensity polymetallic centre.
➢ Rock chip sampling confirms a broad copper-dominant system, returning up to 896 ppm Cu.
ASX Announcement
23 JULY 2026
Page 2
MID-WEST GOLD PORTFOLIO
During the quarter, Catalina completed the acquisition of a strategic portfolio of exploration assets1,2
,
including the Kirkalocka, Pithara, Tallering, Peak Hill, Deflector North, Boodanoo and Warriedar
projects, together with the Lake Johnston Gold Project. The acquisition significantly expanded the
Company's exploration footprint across Western Australia and provides exposure to multiple gold
provinces and development opportunities. The Company immediately commenced systematic
technical reviews and field activities across the portfolio, focusing on validating historical exploration
datasets, refining geological interpretations and progressing priority targets towards drilling.
Figure 1. Mid-West Project Portfolio and Regional Map
Historical exploration reviews were completed for the Kirkalocka, Pithara, Tallering, Peak Hill and
Deflector North projects, confirming numerous significant historical gold, silver and copper results and
identifying multiple priority exploration targets. In addition, a desktop review of the Boodanoo Project
was completed, providing the basis for future exploration planning. These activities form part of
Catalina's strategy to systematically build a significant Mid-West gold inventory through disciplined
exploration, regional consolidation and project advancement.
Catalina will continue systematically advancing its Mid-West Gold Portfolio during the September 2026
quarter. Key activities will include:
➢ Commencement of maiden RC drilling at the Pithara Project
➢ Progression of drilling at Kirkalocka following completion of heritage and land access activities
➢ Interpretation of ongoing soil geochemistry programs, and continued geological assessment
of Tallering, Peak Hill, Deflector North, Warriedar and Boodanoo to refine future exploration
priorities.
The Company will also continue evaluating regional growth opportunities that complement its strategy
of building a district-scale gold portfolio centred on the Kirkalocka region.
Page 3
Kirkalocka Project2
During the quarter, Catalina completed a review of historical geological, geophysical and
drilling datasets across the Kirkalocka Project following completion of the acquisition. The
review confirmed multiple zones of historical gold mineralisation associated with structurally
controlled targets adjacent to the Kirkalocka Gold Mine and processing facility.
Field reconnaissance was undertaken across the Highway, Capra, Avis and 2 Mile Bore
prospects to validate historical datasets, refine geological interpretations and identify priority
targets for drill testing. Geological mapping and rock-chip sampling were completed, with
reconnaissance confirming the prospectivity of several target areas.
The Company also commenced a soil geochemistry program across priority structural corridors
to further refine drill targets. Heritage planning and drill preparation activities were advanced
during the quarter, with approximately 2,200m of RC drilling planned across four priority
prospects following receipt and interpretation of assay results.
Historical review highlights:
➢ 1m @ 23.08g/t Au (08KLRC033)
➢ 6m @ 1.38 g/t Au, including 3m @ 1.40 g/t Au (KKA795)
➢ 6m @ 1.79 g/t Au, including 3m @ 3.02 g/t Au (KKA796)
➢ 2m @ 2.12 g/t Au, including 1m @ 2.23 g/t Au (01-WE-RC-002)
Figure 2. Plan view aeromagnetic image showing selected significant historical drill intersections at Kirkalocka
Page 4
Pithara Project2
Following acquisition of the project, Catalina completed a comprehensive review of historical
exploration data, confirming the presence of the historical Pithara Gold Mine together with
multiple unmined zones of historical gold mineralisation surrounding the former pit (historical
mining of the pit by a private operator in 2011 produced~9,000oz at 15.4g/t Au).
The review incorporated historical drilling, geological interpretation and available geophysical
datasets, identifying several priority areas with potential for extensions to known mineralisation
along strike and at depth. Historical exploration demonstrated that significant portions of the
broader project remain underexplored despite the presence of favourable host geology.
During the quarter, land access, heritage and drill planning activities progressed to support the
Company's maiden exploration program at Pithara.
Historical review highlights (unmined mineralisation):
➢ 7m @ 1.76g/t Au from 89m (PTRC008)
➢ 5m @ 2.70g/t Au from 29m, including 1m @ 8.53g/t Au (DTR949)
➢ 2m @ 2.45g/t Au from 8m, including 1m @ 3.51g/t Au (DTR1176)
Figure 3. Plan view aeromagnetic image showing selected significant historical unmined drill intercepts at the Pithara Pit and surrounds
Page 5
Tallering Project2
Catalina completed a technical review of the Tallering Project following acquisition, confirming
the project's prospectivity for both structurally controlled gold and volcanogenic massive
sulphide (VMS) mineralisation. Historical exploration identified a 2.2km gold anomaly at the
Santy Well Prospect together with multiple geophysical conductors and coincident gold, silver
and copper mineralisation.
The review confirmed several advanced exploration targets supported by historical drilling,
surface geochemistry and electromagnetic surveys. Historical rock-chip sampling also
highlighted significant gold and polymetallic mineralisation across several prospects.
The Company continued target generation and prioritisation activities during the quarter to
support future field programs and drill testing.
Historical review highlights:
➢ 2.2km-long gold anomaly defined at the Santy Well Prospect
➢ 1m @ 90.3g/t Ag, 2.03% Cu and 0.89g/t Au from 66m (SRC006)
➢ Rock-chip sampling up to 100.6g/t Au, 710g/t Ag, 7.04% Cu and 60.1% W
Figure 4. Plan view aeromagnetic image showing selected significant historical exploration results at Tallering
Page 6
Warriedar Project2
The Warriedar Project was incorporated into Catalina's Mid-West portfolio during the quarter.
Desktop geological assessment confirmed the project's favourable position within the Yalgoo-
Singleton Greenstone Belt and its prospectivity for structurally controlled gold mineralisation.
The project occupies a strategic regional position within an active exploration district and
benefits from proximity toestablished mining operations and favourable regional geology. Initial
technical assessment and compilation of historical datasets commenced during the quarter to
identify priority exploration opportunities.
Figure 5. Aeromagnetic image showing the location of the Warriedar option tenements in relation to major projects
Page 7
Peak Hill Project2
The Peak Hill Project islocated withinthe highlyprospective Peak Hill Mineral Field and contains
numerous historical gold workings and documented mineralisation. During the quarter,
Catalina completed a review of historical geological and drilling datasets, confirming multiple
mineralised zones and identifying several priority targets for future evaluation. The review
demonstrated the project's potential for additional gold discoveries within a historically
productive district.
Historical review highlights:
➢ 10m @ 1.43g/t Au from 65m, including 5m @ 2.70g/t Au (PHAC0184)
➢ 2m @ 1.37g/t Au from 45m, including 1m @ 2.23g/t Au (DRB0114)
➢ Multiple historical prospects identified across the project area
Figure 6. Plan view aeromagnetic image showing selected significant historical exploration results at Peak Hill
Page 8
Deflector North Project2
A review of historical exploration data was completed during the quarter for the Deflector North
Project. The project remains lightly explored, with historical drilling providing encouraging
indications of mineralisation along a prospective structural corridor. Further geological
interpretation and target generation activities are planned to refine future exploration programs.
Historical review highlights:
➢ 10m @ 3.21g/t Au from surface (AC2014-2)
➢ 40m @ 0.28g/t Au from 10m, including 10m @ 0.47g/t Au (AC2014-3)
➢ Historical drilling identified mineralisation over approximately 800m of strike
Figure 7. Plan view aeromagnetic image showing selected significant historical exploration results at Deflector North
Page 9
Boodanoo Project
Located approximately 100km south-east of the Kirkalocka Processing Plant, the Boodanoo
Project is prospective for structurally controlled gold mineralisation within the Murchison
Province of Western Australia. During the quarter, Catalina completed a review of historical
geological, geophysical and drilling datasets, confirming shallow gold mineralisation from
historical aircore drilling and identifying several prospective targets for follow-up exploration.
The project represents an additional regional gold opportunity within Catalina's growing Mid-
West portfolio and will be progressively advanced through further geological interpretation and
target generation.
Historical review highlights:
➢ 3m @ 0.5 g/t Au including 1m @1.19 g/t (22BDAC002)
➢ 2m @ 0.67 g/t Au including 1m @ 1.22g/t Au (22BDAC006)
Please refer to Annexure 1 for further details on the historic aircore drilling.
Figure 8. Plan view aeromagnetic image showing selected significant historical exploration results at Boodanoo
Page 10
Lake Johnston Project1
Duringthe quarter, Catalina completed the acquisition of the Lake Johnston Gold Project aspart
of the broader portfolio transaction. The project provides the Company with exposure to the
highly prospective Lake Johnston Greenstone Belt and complements Catalina's existing Central
Yilgarn and Mid-West gold portfolios.
Initial work during the quarter focused on compilation and review of historical geological,
geophysical and drilling datasets to support future exploration planning. The Company intends
to progressively evaluate the project and prioritise exploration opportunities alongside its
broader Western Australian gold portfolio.
Figure 9. Regional map showing the location of the Lake Johnston option tenements in relation to major projects.
Page 11
CENTRAL YILGARN PROJECT
Figure 10. Regional Location of Evanston and Yerilgee Projects
During the quarter, Catalina completed interpretation of its Phase 1 drilling program across the
Evanston and Yerilgee Projects, establishing the Palisade Gold Project by integrating the Chicken Little,
Snowflake, T8 and Megatron prospects into a single 12–14km mineralised corridor. The work confirmed
consistent gold mineralisation across multiple prospects and provided the basis for project-scale
geological interpretation3
.
A comprehensive review of geological, drilling and historical datasets supported the definition of an
aggregate Exploration Target across the Evanston and Yerilgee Projects ranging from approximately
60,000 ounces to 330,000 ounces of gold at grades between 0.76g/t Au and 3.08g/t Au. The Exploration
Target provides a conceptual framework for future exploration and resource definition across the
Central Yilgarn portfolio.
The potential quantity and grade of the Exploration Target are conceptual in nature. There has been
insufficient exploration to estimate a Mineral Resource and it is uncertain whether further exploration
will result in the estimation of a Mineral Resource.
The drilling program returned consistent gold mineralisation across multiple prospects, with 33 of 69
RC holes intersecting ≥0.3g/t Au, including 70 samples returning ≥0.5g/t Au, confirming the continuity
of the mineralised corridor and supporting ongoing evaluation of multiple deposits within the Palisade
Gold Project3
.
Page 12
Exploration Target
Deposit Drill
spacing^
Min
Exploration
Target –
Contained
Au (oz)
Min grade
(g/t Au)
Max
Exploration
Target #
–
Contained
Au (oz)
Max grade
(g/t Au)
Chicken Little 20 × 100 5,000 1.54 30,000 3.08
Snowflake 20 × 100 800 1.05 5,000 2.1
T8 50 × 100 13,000 0.8 80,000 1.6
Leghorn 50 × 100 14,300 0.76 76,000 1.52
Viper South 50 × 350 27,300 1.42 143,000 2.85
Total (aggregate) ~60,400 ~334,000
^
Drill spacing includes historic air-core drilling where applicable.
#
Upper-end Exploration Targets reflect conceptual upside supported by surface geochemistry, geophysics and geological
interpretation.
During the September 2026 quarter, Catalina intends to:
➢ Progress priority deposits towards JORC-compliant Mineral Resource Estimates.
➢ Refine the Palisade Gold Project geological model through integration of drilling and historical
datasets.
➢ Finalise and prioritise follow-up drill targets across the 12–14km Palisade mineralised
corridor.
➢ Continue evaluating additional prospects for inclusion in future resource studies.
➢ Advance the Central Yilgarn portfolio towards resource definition and future development
opportunities.
BREAKAWAY DAM PROJECT
During the quarter, Catalina completed the acquisition4
of the Breakaway Dam Copper and Lithium
Project, securing ownership of a highly prospective multi-commodity project located approximately
17km east of Menzies in Western Australia.
The project hosts an emerging copper-rich volcanogenic massive sulphide (VMS) system together with
an underexplored lithiumopportunity,providing Catalina with exposure to both critical and base metals
within a single project.
Catalina's maiden drilling program5
successfully validated the geological model, intersected additional
copper mineralisation and significantly improved the Company's understanding of the mineralised
system. Integration of drilling results with Downhole Electromagnetic (DHEM) surveys expanded the
interpreted mineralised strike from approximately 700 metres to 1.2 kilometres, representing an
increase of approximately 70%.
The work also confirmed that the system remains open along strike and at depth, with historical drilling
indicating potential strike extending to approximately 1.8 kilometres. Strong downhole electromagnetic
responses identified multiple on-hole and off-hole conductor plates, generating high-priority targets for
follow-up drilling.
Page 13
Quarter highlights:
• Maiden drilling expanded the interpreted mineralised strike from 700m to 1.2km.
• 1.9m (ETW) @ 2.17% Cu from 198m (BDCRC26016).
• 2.9m (ETW) @ 0.57% Cu from 204m (BDCRC26014).
• 3.8m (ETW) @ 0.31% Cu from 124m (BDCRC26016).
• Multiple on-hole and off-hole DHEM conductors identified, providing priority follow-up drill
targets.
During the September 2026 quarter, Catalina intends to:
• Commence the next phase of RC drilling targeting priority DHEM conductors and extensions to
the known copper mineralisation.
• Continue geological modelling and interpretation to assess the continuity and scale of the VMS
system.
• Complete a comprehensive review of the project's lithium potential, including historical
geochemistry, pegmatite occurrences and geological controls, to prioritise future exploration.
• Integrate drilling, and historical datasets to refine exploration targets across both the copper
and lithium opportunities.
Figure 11: Long section of target horizon showing recently modelled DHEM plates and significant intercepts.
Page 14
BEASLEY CREEK PROJECT
During the quarter, Catalina continued to advance the Beasley Creek Project through regional
geochemical exploration designed to identify and prioritise drill targets across the project. A total of 304
soil samples and 27 rock-chip samples were collected across the Flamingo and Golden Hand
prospects, significantly improving the Company's understanding of the project's gold and base metal
potential.
Results confirmed a substantial expansion of the known mineralised footprint, with the Flamingo gold
anomaly extended by approximately 1.8km along strike and 350m to the south, while a coherent 2.7km
zinc anomaly associated with the Mithgoondy Shear Zone was also defined. At the Golden Hand
Prospect, soil sampling delineated a coherent 1km gold anomaly, reinforcing the prospectivity of the
project and identifying multiple targets for follow-up exploration.
Rock-chip sampling returned anomalous gold, silver, copper, lead and zinc values, further supporting
the interpreted mineralised system and assisting in refining priority drill targets. During the quarter,
Catalina was also awarded Exploration Incentive Scheme (EIS) co-funded drilling, providing up to
$180,000 towards the cost of a future drilling program. These results have significantly enhanced the
geological understanding of the project and provide a strong platform for the next phase of exploration.
Quarter highlights:
➢ Completed 304 soil samples and 27 rock-chip samples across the Flamingo and Golden Hand
prospects.
➢ Extended the Flamingo gold anomaly by approximately 1.8km and 350m south.
➢ Defined a coherent 2.7km zinc anomaly associated with the Mithgoondy Shear Zone.
➢ Delineated a 1km gold anomaly at the Golden Hand Prospect.
➢ Rock-chip sampling returned up to 0.14g/t Au, 9.9g/t Ag, 662ppm Cu, 6,110ppm Pb, 895ppm
Zn
➢ Awarded up to $180,000 in WA Government EIS co-funded drilling support.
Please refer to Annexure 2 for further details of the rock chip sampling program.
During the September 2026 quarter, Catalina intends to:
➢ Complete interpretation of the soil geochemistry and rock-chip sampling results.
➢ Integrate geochemical, geological and structural datasets to refine and prioritise drill targets
across the Flamingo and Golden Hand prospects.
➢ Progress heritage approvals required to support future drill testing.
➢ Finalise planning for the EIS co-funded drilling program, including drill targeting and program
design.
Page 15
Figure 12. Interpreted soil geochemical contours and location of 2026 soils samples at Flamingo
and Golden Hand targets on EL 47/3490.
Figure 13. Interpreted multi‑element soil geochemical contours at the Flamingo Target, highlighting clustered Cu–
Au–Ag anomalism within a broader As–Zn halo, with planned soil and drill locations shown.
Page 16
NBR
During the quarter Catalina and Newcam Minerals continued to work through the conditions precedent
and steps for transfer to enable completion to occur.
As previously announced, the completion of the transaction will result in the release of $827,200
(currently held as a Rehabilitation Security Deposit) back to Catalina.
Catalina advises that it also has a $466,000 bank guarantee lodged with Mineral Resources Tasmania
(MRT).
This will continue to be held by MRT until such time as the Department determines that the amount is
able to be released, following which Catalina will be released from that bank guarantee.
ADDITIONAL ASX INFORMATION
ASX Listing Rule 5.3.1
Exploration and evaluation expenditure during the quarter totalled $1,032,177, comprising $1,017,458
for field exploration in Western Australia, $12,216 in New South Wales, and $2,502 incurred on care and
maintenance activities at the Nelson Bay River (NBR) Project in Tasmania.
ASX Listing Rule 5.3.2
There was no substantive mining production and development activities during the quarter.
ASX Listing Rule 5.3.5
In Item 6 of the Appendix 5B cash flow report for the quarter, payments to related parties amounted to
$93,733; comprising of executive directors' salaries, consulting fees to directors (including expense
reimbursement), non-executive director's fees, COO Fees and superannuation. As at 30 June 2026, the
Company held cash reserves of $1.722 million.
ASX Listing Rule 5.3.3
The Company advises the following:
(1) There were no tenements acquired or disposed of during the quarter;
(2) The mining tenements held by the Company as of 30 June 2026 are set out in the table below;
(3) There were no farm-in or farm-out agreements entered into during the quarter; and
(4) The Company held no beneficial percentage interests in farm-in or farm-out agreements as at the
end of the quarter.
SCHEDULE OF MINING TENEMENTS HELD
Project Tenement Status Ownership % Jurisdiction
Auric North
E59/2974 Pending 100 WA
E52/4453 Live 100 WA
E20/1099 Pending 100 WA
Page 17
E21/0239 Pending 100 WA
E59/2981 Live 100 WA
E58/0631 Live 100 WA
P52/1720 Live 100 WA
Beasley Creek
E47/3490 Live 100 WA
E47/5364 Pending 100 WA
E47/5365 Pending 100 WA
E47/5366 Pending 100 WA
Breakaway Dam
E29/1037 Live 100 WA
E29/1323 Pending 100 WA
E29/1324 Pending 100 WA
Evanston
E77/2403 Live 100 WA
E77/2416 Live 100 WA
E77/2432 Live 100 WA
E77/2634 Live 100 WA
Jaurdi E16/0672 Pending 100 WA
Laverton
E38/3697 Live 100 WA
E38/3698 Live 100 WA
E38/3847 Live 100 WA
Marmion
E40/0378 Live 100 WA
E40/0479 Pending 100 WA
Spinifex Silver
E39/2589 Pending 100 WA
E69/4379 Pending 100 WA
Yerilgee
E16/0495 Live 100 WA
E30/0493 Live 100 WA
E30/0494 Live 100 WA
E30/0584 Live 100 WA
E30/0591 Pending 100 WA
E30/0593 Pending 100 WA
Nelson Bay River 3M/2011 Live 100 TAS
Rock Lodge EL 9155 Live 100 NSW
Page 18
References (ASX)
This Report contains information extracted from ASX market announcements reported in accordance with the
2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”
(“2012 JORC Code”). Further details (including 2012 JORC Code reporting tables where applicable) of exploration
results referred to in this announcement can be found in the following announcements lodged on the ASX:
1
ASX announcement 14 May 2026 ASX:CTN - Key Acquisition & Placement Expands Mid-West Gold Portfolio
2
ASX Announcement 17 July 2026 ASX:CTN - Correction to Mid-West Portfolio Announcement on 15 June
3
ASX Announcement 5 May 2026 ASX:CTN - Drilling Defines Continuous Gold Corridor at Palisade
4
ASX Announcement 29 June ASX:CTN - Breakaway Dam Copper Lithium Project Acquisition Completed
5
ASX Announcement 6 May 2026 ASX:CTN - Breakaway Dam Expands Strike - Copper Intercepts up to 2% Cu
Competent Persons Statement
Reported information in this announcement that relates to exploration activities (including the exploration target
within the Central Yilgarn Project) is based on information compiled by Dr Nishka Piechocka, PhD, Vice President
of the Australian Institute of Geoscientists (AIG) and a full-time employee of Catalina Resources Limited. Dr
Piechocka has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code).
Dr Piechocka consents to the inclusion in the report of the matters based on her information in the form and
context in which it appears.
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the original market announcement and, in thecase of estimates of Mineral Resources or Ore Reserves,
that all material assumptions and technical parameters underpinning the estimates in the relevant market
announcement continue to apply and have not materially changed.
The Company confirms that the form and context in which the Competent Person’s findings are presented have
not been materially modified from the original market announcement.
Forward-Looking Statements
This announcement contains forward-looking statements that are subject to a range of risks and uncertainties.
These statements relate to the Company’s expectations, intentions, or strategies regarding the future. These
statements can be identified by the use of words like “anticipate”, “believe”, “intend”, “estimate”, “expect”,
“may”, “plan”, “project”, “will”, “should”, “seek” and similar words or expressions containing same. These
forward-looking statements reflect the Company’s views and assumptions with respect to future events as of the
date of this release and are subject to a variety of unpredictable risks, uncertainties, and other unknowns. Actual
and future results and trends could differ materially fromthose set forth in such statements due to various factors,
many of which are beyond our ability to control or predict. These include, but are not limited to, risks or
uncertainties associated with the acquisition and divestment of projects (including risks associated with
completing due diligence and, if favourable results are obtained, proceeding with the acquisition of the Beasley
Creek Project), joint venture and other contractual risks, metal prices, exploration, development and operating
risks, competition, production risks, sovereign risks, regulatory risks including environmental regulation and
liability and potential title disputes, availability and terms of capital and general economic and business
conditions.
Given these uncertainties, no one should place undue reliance on any forward-looking statements attributable to
the Company, or any of its affiliates or persons acting on its behalf. Subject to any continuing obligations under
applicable law the Company disclaims any obligation or undertaking to disseminate any updates or revisions to
any forward-looking statements in this announcement to reflect any change in expectations in relation to any
forward-looking statements or any change in events, conditions or circumstances on which any such statement
is based.
Page 19
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development company
whose vision is to create shareholder value through the successful exploration of prospective gold, base metal,
lithium and iron ore projects and the development of these projects into production.
Contacts
Investors / Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6188 8181
Click Here leave a question about this announcement and to visit our Investor Hub
This announcement has been authorised for release by the Board of Catalina Resources Limited.
Page 20
ANNEXURE 1
The following relates to review of Historical Exploration Data for Catalina’s Boodanoo tenement E59/2368.
Information was sourced from previous announcements (20221117-New-Gold-Mineralisation-From-First-
Aircore-Drilling-at-Boodanoo-Indentified-using-SensOres-DPT-Technology.pdf) and publicly available WAMEX
reports (102128, 132829, 98073, 21087, 28063 and 136037).
Several 4 m composite samples from the 2022 AC drilling program returned anomalous gold values. A total of 71
one-metre split samples from these anomalous composite intervals were subsequently submitted for assay to
better define the distribution of mineralisation. The results from all 1 m split samples (at a cut-off grade of 0.1 g/t
Au) are below.
Hole_ID SampleID From To Au G/T
22BDAC002 MLC11397 11 12 0.00
22BDAC002 MLC11398 12 13 -
22BDAC002 MLC11399 13 14 -
22BDAC002 MLC11401 14 15 0.01
22BDAC002 MLC11402 15 16 0.01
22BDAC002 MLC11403 16 17 0.29
22BDAC002 MLC11404 17 18 0.02
22BDAC002 MLC11405 18 19 1.19
22BDAC002 MLC11406 19 20 0.07
22BDAC002 MLC11407 20 21 0.10
22BDAC002 MLC11408 21 22 0.00
22BDAC002 MLC11409 22 23 0.00
22BDAC002 MLC11410 23 24 0.06
22BDAC002 MLC11411 24 25 0.03
22BDAC002 MLC11412 25 26 0.03
22BDAC002 MLC11413 26 27 0.01
22BDAC002 MLC11414 27 28 0.06
22BDAC006 MLC11415 32 33 0.01
22BDAC006 MLC11416 33 34 0.02
22BDAC006 MLC11417 34 35 0.01
22BDAC006 MLC11418 35 36 0.00
22BDAC006 MLC11419 36 37 0.01
22BDAC006 MLC11420 37 38 0.01
22BDAC006 MLC11421 38 39 0.11
22BDAC006 MLC11422 39 40 1.22
22BDAC006 MLC11423 40 41 0.08
22BDAC006 MLC11424 41 42 0.05
22BDAC006 MLC11426 42 43 0.06
22BDAC006 MLC11427 43 44 0.04
22BDAC006 MLC11428 44 45 0.03
Collar Details
Hole ID
Hole
Type
Max
Depth
Grid East North Dip Azi RL (m)
22BDAC001 AC 50 MGA94_50 628100 6841839 -60 90 437
22BDAC002 AC 50 MGA94 50 628018 6841840 -60 90 439
22BD
Share your feedback
Discover