Central Yilgarn Project: Viper Prospect RC Drilling Supports Gold
Mineralisation Model
HIGHLIGHTS
➢ Phase 1 Reverse Circulation (RC) drilling completed at the Viper Prospects, Central
Yilgarn Project with drilling intersecting gold mineralisation associated with mafic
and banded iron formation (BIF) lithology
➢ Assays returned to date for the Viper Prospects include:
• 1 m @ 2.45 g/t Au from 77 m (25EVRC002)
• 1 m @ 1.60 g/t Au from 7 m (26EVRC019)
• 2 m @ 1.16 g/t Au from 28 m (26EVRC020)
• 1 m @ 1.43 g/t Au from 84 m (26EVRC021)
• 1 m @ 0.67 g/t Au from 9 m (26EVRC023)
➢ Gold mineralisation is interpreted to be associated with a mafic and banded iron
formation (BIF) sequence and to dip moderately to the north-west, informing
follow-up drill targeting
➢ Drilling outcomes continue to reinforce the prospectivity of the Evanston Project,
supporting the potential for a coherent and structurally controlled gold system
within the Central Yilgarn tenure
Catalina Resources Limited (“Catalina” or “the Company”) is pleased to provide an update on results
from the Phase 1 RC drilling program at the Viper Prospects, part of the Evanston Project within the
Central Yilgarn Gold District of Western Australia (figure 1).
These results form part of an ongoing Phase 1 drilling campaign totalling ~10,000m of RC and aircore
(AC) drilling across the Central Yilgarn Project1
, with drilling and assay results from multiple targets still
pending.
The Phase 1 program commenced prior to the Christmas period and forms the initial focus of
Catalina’s broader Central Yilgarn drilling campaign. Drilling was designed to follow up and test the
continuity of previously reported anomalous gold mineralisation intersected in historic drilling.
Executive Director, Ross Cotton, commented:
“The Viper drilling represents another encouraging step in the advancement of the Evanston Project.
The intersections and geological observations continue to align with our exploration model and highlight
the broader potential of the system we are testing. Importantly, these results are being integrated into
ongoing targeting as Phase 1 drilling progresses, with further assays pending across multiple prospects.
Catalina considers Evanston to be developing into a highly compelling component of the Central Yilgarn
Project”
ASX Announcement
18 February 2026
Page 2
Figure 1. Central Yilgarn Regional Location
PHASE 1 RC DRILLING RESULTS – CENTRAL YILGARN PROJECT
Drilling Summary – Viper Prospect
Results reported in this announcement relate to drilling completed at the Viper North and Viper South
Prospects, both of which form part of Catalina’s Phase 1 drilling program.
Catalina’s RC drilling program at Viper comprised 17 drill holes for a total of 2,694 metres, being:
➢ 3 RC holes for 463 metres at Viper North; and
➢ 14 RC holes for 2,231 metres at Viper South.
The program was designed to follow up anomalous gold mineralisation identified in historical AC
drilling2
, including:
➢ 2m @ 0.95g/t Au in BARAC0153
➢ 15m @ 1.5 g/t Au including 3m @ 6.7g/t Au in BARAC0136; and
➢ 33m @ 0.3 g/t Au including 3m @ 0.9 g/t Au in BARAC0945.
Drilling targeted the interpreted south-west strike extension of this mineralisation, consistent with the
regional structural trend associated with the Evanston Mine within the Leeuwin Metals Ltd (ASX:LM1)
Marda Gold Project (Figure 2).
Page 3
Figure 2. Regional geological interpretation of the Evanston Greenstone Belt.
Drilling at Viper North targeted a large, coherent soil anomaly that had remained largely untested by
previous drilling. Historical shallow AC drilling indicated shallow bedrock, while deeper gold intercepts
in adjacent southern drill holes suggested potential for mineralisation at depth. Assay results for Viper
North drilling have been received.
Drilling at Viper South was guided by historical shallow AC and deeper rotary air blast (RAB) drilling,
with several historical holes terminating in anomalous gold (0.7–0.9 g/t Au). This supported the
interpretation of potential mineralisation at depth and provided the basis for follow-up RC drilling.
Assay results have been partially received, with remaining results pending.
Geological Observations and Results
Drilling intersected a mafic lithological sequence comprising basalt and amphibolite, together with
associated banded iron formation (BIF). Observed mineralisation within the BIF is consistent with
styles recognised elsewhere within the Evanston Project area, including Evanston Mine.
Gold mineralisation is interpreted to be associated with the mafic and BIF sequence and is interpreted
to dip approximately 40 degrees to the north-west. This interpretation provides a basis for ongoing
targeting and future drill design.
Drilling along strike has confirmed the interpreted mineralisation model, with intersections including:
• 1m @ 2.45 g/t Au from 77m in 25EVRC002
• 2m @ 1.16 g/t Au from 28m in 26EVRC020
Page 4
These results confirm continuity of gold mineralisation along strike and at depth and support the
interpretation of a coherent mineralised system at the Viper Prospect.
Significant Intersections (>0.5g/t Au) and Interpretation
Hole Id
Depth
From (m)
Depth To
(m)
Width
(m)
Gold
(g/t)
Significant intersection
25EVRC002 77 78 1 2.45 1 m @ 2.45g/t Au from 77m
26EVRC019 7 8 1 1.60 1m @ 1.60 g/t Au from 7m
26EVRC020 28 30 2 1.16 2m @ 1.16 g/t Au from 28m
26EVRC021 84 85 1 1.43 1m @ 1.43g/t Au from 84m
26EVRC023 9 10 1 0.67 1m @ 0.67g/t Au from 9m
The interpreted mineralised zone is developed within a mafic and banded iron formation stratigraphic
sequence and exhibits continuity along strike, consistent with the geological model tested during the
Phase 1 drilling program. Drill hole locations, significant gold intersections, and projected mineralised
trends are shown to provide spatial context for reported results.
This interpretation provides a framework for refining follow-up drill targeting and assessing the broader
potential of the Viper Prospects within the Evanston Project area.
Figure 3. View of the Viper Prospects illustrating the interpreted extent and orientation of gold mineralisation
based on Phase 1 RC drilling, historical drilling data2
, and current geological interpretation
Page 5
Representative RC Rock Chip Images
Rock chip observations, supported by geological logging, indicate that gold mineralisation is
predominantly hosted within amphibolite, basalt, jasperoid and banded iron formation. The images are
not indicative of grade, tenor, or continuity of mineralisation, but assist in demonstrating the geological
setting, alteration styles, and structural characteristics relevant to ongoing interpretation and follow-up
targeting.
Hole ID
Figure
Number
Depth From
(m)
Depth To
(m)
Gold (g/t) Geological Observations
25EVRC002 4 77 78 2.45 Weakly foliated amphibolite with
massive-stringer style quartz
veining with sulphides
26EVRC019 5 7 8 1.60 Jasperoid (non-magnetic)
26EVRC020 6 28 30 1.16 Suspected basalt strongly
oxidised with smoky quartz
veining
26EVRC021 7 84 85 1.43 Weakly foliated magnetic
ultramafic unit with quartz
veinlets with up to 2.5%
sulphides
26EVRC023 8 9 10 0.67 Weathered banded iron
formation (BIF)
Figure 4. Representative RC rock chip samples from drill hole 25EVRC002 (60–80 m), Viper Prospect
Page 6
Figure 5. Representative RC rock chip samples from drill hole 26EVRC019 (0–60 m), Viper Prospect
Figure 6. Representative RC rock chip samples from drill hole 26EVRC020 (0–60 m), Viper Prospect
Page 7
Figure 7. Representative RC rock chip samples from drill hole 26EVRC021 (60–101 m), Viper Prospect
Figure 8. Representative RC rock chip samples from drill hole 26EVRC023 (0–60 m), Viper Prospect
Page 8
Ongoing Phase 1 Drilling and Assay Status
Phase 1 drilling of approximately ~10,000 metres of combined AC and RC drilling is continuing across
the Evanston and Yerilgee Projects, with multiple target zones tested as part of the current campaign.
Assay results from all other Phase 1 target areas are currently pending, with samples submitted to the
laboratory. These results will be reported progressively as they are received, validated, and interpreted.
Catalina considers the Viper results to represent one component of a broader, active exploration
program, with further updates expected as the Phase 1 campaign continues.
Contacts
Investors/ Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6165 8858
REFERENCES (ASX)
This Report contains information extracted from ASX market announcements reported in accordance
with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code reporting tables
where applicable) of exploration results referred to in this announcement can be found in the following
announcements lodged on the ASX:
1. Refer CTN ASX announcement 1 December 2025 Phase-1-Drilling-at-Evanston-Underway.pdf
2. Refer CTN ASX announcement 11 December 2025 Acquisition of Central Yilgarn
COMPETENT PERSONS STATEMENT
Newly reported information in this announcement that relates to exploration activities within the Central
Yilgarn Project is based on information compiled by Dr Nishka Piechocka, PhD, Vice President of the
Australian Institute of Geoscientists (AIG) and a full-time employee of Catalina Resources Limited. Dr
Piechocka has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves (JORC Code). Dr Piechocka consents to the inclusion in the report of the matters based on her
information in the form and context in which it appears.
Where the Company refers to the Mineral Resources in this report (referencing previous releases made
to the ASX), it confirms that it is not aware of any new information or data that materially affects the
information included in that announcement and all material assumptions and technical parameters
Page 9
underpinning the Mineral Resource estimate with that announcement continue to apply and have not
materially changed.
FORWARD-LOOKING STATEMENTS
This announcement contains forward-looking statements that are subject to a range of risks and
uncertainties. These statements relate to the Company’s expectations, intentions, or strategies
regarding the future. These statements can be identified by the use of words like “anticipate”, “believe”,
“intend”, “estimate”, “expect”, “may”, “plan”, “project”, “will”, “should”, “seek” and similar words or
expressions containing same. These forward-looking statements reflect the Company’s views and
assumptions with respect to future events as of the date of this release and are subject to a variety of
unpredictable risks, uncertainties, and other unknowns. Actual and future results and trends could
differ materially from those set forth in such statements due to various factors, many of which are
beyond our ability to control or predict. These include, but are not limited to, risks or uncertainties
associated with the acquisition and divestment of projects (including risks associated with completing
due diligence and, if favourable results are obtained, proceeding with the acquisition of the Beasley
Creek Project), joint venture and other contractual risks, metal prices, exploration, development and
operating risks, competition, production risks, sovereign risks, regulatory risks including environmental
regulation and liability and potential title disputes, availability and terms of capital and general
economic and business conditions.
Given these uncertainties, no one should place undue reliance on any forward-looking statements
attributable to the Company, or any of its affiliates or persons acting on its behalf. Subject to any
continuing obligations under applicable law the Company disclaims any obligation or undertaking to
disseminate any updates or revisions to any forward-looking statements in this announcement to reflect
any change in expectations in relation to any forward-looking statements or any change in events,
conditions or circumstances on which any such statement is based.
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development
company whose vision is to create shareholder value through the successful exploration of prospective
gold, base metal, lithium and iron ore projects and the development of these projects into production.
Page 10
APPENDIX 1: DRILLHOLE SPECIFICATIONS
Hole Id Type Easting
(GDA94z51)
Northing
(GDA94z51)
Elevation
(m)
Dip (⁰) Azi (⁰) Actual
Depth
(m)
25EVRC002 RC 748919 6714191 433 -60 135 154.00
25EVRC003 RC 748971 6714135 433 -60 133 160.00
25EVRC004
&
26EVRC013
RC
748866 6714232 433 -60 135 149
25EVRC005 RC 748122 6712855 433 -60 135 148.00
26EVRC014 RC 748815 6713289 433 -60 135 131.00
26EVRC015 RC 748761 6713347 433 -60 135 109.00
26EVRC016 RC 748709 6713398 433 -60 135 155.00
26EVRC017 RC 748660 6713448 433 -60 135 155.00
26EVRC018 RC 748601 6713501 433 -60 135 155.00
26EVRC019 RC 748546 6713553 433 -60 135 155.00
26EVRC020 RC 748472 6713625 433 -60 135 209.00
26EVRC021 RC 748443 6713662 433 -60 135 101.00
26EVRC022 RC 748350 6713186 439 -60 135 149.00
26EVRC023 RC 748307 6713224 439 -60 135 149.00
26EVRC024 RC 748189 6713353 439 -60 135 299.00
26EVRC025 RC 748070 6712903 432 -60 135 155.00
26EVRC026 RC 748018 6712953 432 -60 135 161.00
Page 11
APPENDIX 2: JORC CODE, 2012 EDITION - TABLE 1
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as down
hole gamma sondes, or handheld XRF
instruments, etc). These examples should
not be taken as limiting the broad meaning
of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
• Aspects of the determination of
mineralization that are Material to the
Public Report.
• In cases where ‘industry standard’ work
has been done this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3
kg was pulverised to produce a 30 g charge
for fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralization types (eg
submarine nodules) may warrant
disclosure of detailed information.
Catalina Resources completed 17 RC holes
for 2694 m at the Viper prospect Central
Yilgarn project over the period 2nd
December 2025 to 29 January 2026.
Drilling was supervised and samples
collected by geologists from Apex
Geoscience which is an independent
geological consultancy.
Drill samples were collected by Reverse
Circulation (RC) drilling. Drill hole details
are provided in Appendix 1.
RC drilling was used to obtain 1m samples
using a Sandvik Static Cone Splitter in calico
bags and weighing 2 to 3 kg each. Samples
were delivered to the ALS Lab in Kalgoorlie
(for photon assay).
The samples were analysed using the
photon assay method which uses a 0.5kg
sample and requires minimal handling. The
samples are riffle split at the lab and
crushed to 80% passing 2mm to ensure
homogeneity as uniform sample distribution
is important to a quality analysis.
The samples are considered to effectively
represent the drilling at the point of
collection. Sampling included Catalina
Resources standard QAQC procedures.
Quality control of the assaying comprised
the collection of a duplicate samples every
hole, along with regular insertion of industry
(Geostats) standards (certified reference
material) and (certified reference material)
and blanks.
Page 12
Criteria JORC Code explanation Commentary
Drilling
techniques
• Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diametre, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
Reverse Circulation (RC) drilling was
performed by McKay Drilling from Perth, using
a 5.25-inch diameter drill bit with 6 m length
drill rods with automatic rod handlers. Holes
were drilled at an angle of -60⁰.
An 8x8-mounted Schramm 685 RC drill rig,
supported by a Mercedes 8x8 booster truck, a
Sullair 900/1150 auxiliary compressor and a
Hurricane 1000-psi booster, was used to
complete the drilling program.
RC drilling produces dry rock chips, as large
capacity air compressors dry the rock out
ahead of the advancing drill bit.
Downhole Surveys employed a downhole
Gyro making readings every 5m.
Drill sample
recovery
• Method of recording and assessing core
and chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Sample recovery was assessed visually via
the sample size collected into the calico
bags. Where sample recovery was low due to
wet samples material was scooped from the
spoil pile.
Sample recovery and condition was noted for
every metre.
Ground water caused wet samples
occasionally, so splitting of the sample was
not possible.
In ground sumps were dug prior to drilling
commencing, to collect the excess
groundwater expelled by the rig.
Catalina Resources does not anticipate any
sample bias from loss/gain of material from
the drill rig cyclone.
Logging
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate
Mineral Resource estimation, mining
studies and metallurgical studies.
• Whether logging is qualitative or
quantitative in nature. Core (or costean,
channel, etc) photography.
• The total length and percentage of the
relevant intersections logged.
RC drill holes were logged for various
geological attributes, including colour,
lithology, oxidation, alteration, mineralisation
and veining. All holes were logged in full by
geologists from Apex Geoscience.
No geotechnical logging was possible as the
RC drilling method does not allow RQD
recording.
Geological logging was qualitative at 1m
intervals and was recorded at the sample
depth.
Representative 1m samples weighing 20 gms
were collected and placed into plastic chip
Page 13
Criteria JORC Code explanation Commentary
trays for later reference.
The recording was done at a level
commensurate with the early stage of
exploration.
Sub-
sampling
techniques
and sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet
or dry.
• For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for instance
results for field duplicate/second-half
sampling.
• Whether sample sizes are appropriate to
the grain size of the material being
sampled.
N/A
Dry and wet drill samples were collected at the
drill collar. After passing through the sample
hose and into the drill cyclone the samples
pass through a riffle splitter to homogenise the
sample and to nullify the effects of particulate
gold. After splitting, the sample was collected
in a calico bag, ready for assaying.
The samples are considered to effectively
represent the rock at the point of collection.
Sampling included Catalina Resources
standard QAQC procedures. Quality Control
on the RC drill rig included insertion of
duplicate samples to test lab repeatability,
insertion of standards to verify lab assay
accuracy and cleaning and inspection of
sample assembly. A standard or duplicate was
inserted every 20th to 25th sample.
The sample sizes and analysis size are
considered appropriate to correctly represent
the mineralisation based on the style of
mineralisation, sampling methodology and
assay value ranges for the commodities of
interest.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations factors
applied and their derivation, etc.
• Nature of quality control procedures
adopted (eg standards, blanks, duplicates,
external laboratory checks) and whether
acceptable levels of accuracy (ie lack of
bias) and precision have been established.
All samples were delivered to the ALS Labs in
Kalgoorlie for Photon Assay. Photon assay
method has shown to provide quick turn
around times and high accuracy.
The assay method and laboratory procedures
were appropriate for this style of
mineralisation. The fire assay technique for the
RC chips were designed to return precise
precious metal recoveries.
The ALS lab inserts its own standards and
blanks at set frequencies and monitors the
precision of the analyses. As well, the lab
performs repeat analyses at random intervals,
which return acceptably similar values to the
original samples.
Page 14
Criteria JORC Code explanation Commentary
Laboratory procedures are within industry
standards and are appropriate for the
commodities of interest.
Industry certified Geostats standards were
inserted in the RC chip sample stream every 25
samples, and field duplicates were collected
every 20 samples.
The samples are considered to effectively
represent the rock at the point of collection.
Sampling included Catalina Resources
standard QAQC procedures.
Verification
of sampling
and assaying
• The verification of significant intersections
by either independent or alternative
company personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
Consultant geologists, from Apex Geoscience,
were involved in the logging of the RC drilling.
Apex was involved in the whole process
including drill hole supervision, chip sample
collection and importing of the completed
assay results. Drill hole logs were inspected to
verify the correlation of mineralized zones
between assay results and
lithology/alteration/mineralisation. The entire
chain of custody of this recent drilling was
supervised by Apex Geoscience.
The drill hole data was logged in a locked excel
logging template and then stored in a
Micromine database structure for long term
storage and validation.
Data was reported by the laboratory and no
adjustment of data was undertaken.
All assay results were verified by alternative
company personnel and the Qualified Person
before release.
Analysis of the accuracy of the above QAQC
procedures needs to be within acceptable
limits.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic
control.
RC drill hole locations were picked up using a
handheld Garmin GPS, considered to be
accurate to ± 5 m.
Downhole surveys have been completed at 5 m
stations (and start and end of hole) using a
downhole gyroscopic survey tool.
All coordinates were recorded in MGA Zone 51
datum GDA94.
Page 15
Criteria JORC Code explanation Commentary
Topographic control is provided by a Digital
Terrain Model based on the 90 m Shuttle
Radar Topographic Mission data.
Drill hole details are in Appendix 1 of this
announcement.
Data
spacing and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution
is sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
Drill holes were sited in a position to
intercept the previously identified air core
mineralisation, aiming to obtain grade and
width information.
The orientation of the mineralisation is not
yet defined, at this stage of exploration.
N/A as no resource estimate is made.
RC drilling was on line spacing at 400m or
700m and 75m inbetween drill holes (at Viper
North) and 1000m and 1600m line spacing
and 75m inbetween drill holes. Deviations
from the 75m spacing occurred where
necessary to avoid restricted zones.
No compositing has been conducted.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material.
Appendix 1 tables the MGA coordinates, of
each hole.
RC drilling is a hammer percussion technique
to shatter the rock and does not allow rock
structures to be seen.
Drilling is assumed to intersect the
mineralised structures at right angles. All
holes were drilled at -60 degrees to the west.
Until Catalina ascertains all assays back or
conduct diamond drilling, Catalina is
uncertain of the geometry of the mineralised
structures
Sample
security
• The measures taken to ensure sample
security. Drill samples were placed into calico bags
measuring 14 in x 12 in. They were then
placed into larger poly weave bags which
were sealed with cable ties.
Large bulka bags were used to transport these
poly weave bags to the ALS lab in Kalgoorlie.
A sample submission outlining assay
instructions was provided to ALS.
Page 16
Criteria JORC Code explanation Commentary
ALS maintains the chain of custody once the
samples are received at the laboratory, with a
full audit trail available via the ALS website.
The chain of custody for samples from
collection to delivery at the laboratory was
handled by Apex Geoscience personnel.
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data. At this stage of exploration, no external audit
or review has been undertaken.
The work was carried out by reputable
companies and laboratories using industry
best practice.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings.
• The security of the tenure held at the time
of reporting along with any known
impediments to obtaining a licence to
operate in the area.
The Central Yilgarn Project consists of 8
granted Exploration Licenses (E16/495,
E30/493, E30/494, E77/2403, E77/2416,
E77/2432, E77/2634 and E30/584).
All tenements are 100% owned by Catalina.
E16/495, E30/493, E30/494, E77/2403,
E77/2416, E77/2432, E77/2634 are subject to
a 1% NSR retained by Arrow Minerals.
E30/584 will be subject to a 1% NSR retained
by Dreadnought Resources.
The Yerilgee, Evanston and South Elvire
greenstone belts are covered by the Marlinyu
Ghoorlie Native Title Claim (WC2017/007).
Exploration
done by other
parties
• Acknowledgment and appraisal of
exploration by other parties. At Central Yilgarn, historical exploration of a
sufficiently high standard was carried out by
a few parties including: Kia Ora Gold, Battle
Mountain, Aztec Mining, Titan Resources and
Roper River.
In more recent years since 2001, the ground
has been held and explored for Iron Ore by
Cleveland Cliffs, MacArthur Minerals
(Internickel Australia), Meteoric Resources,
Arrow Minerals and DRE. Prior to gold
Page 17
Criteria JORC Code explanation Commentary
exploration in the 1980s and 1990s, the
ground was explored by base metal
companies, though few details of their work
is recorded.
Geology
• Deposit type, geological setting and style
of mineralization.
The Central Yilgarn Project is located within
the Yerilgee, Evanston and South Elvire
Greenstone Belt within the Southern Cross
Domain of the Youanmi Terrane of the Yilgarn
Craton. The Central Yilgarn Project is
prospective for orogenic gold, iron ore, LCT
pegmatites, VMS and potentially komatiite
hosted nickel mineralisation.
Drill hole
Information
• A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes:
o easting and northing of the drill hole
collar
o elevation or RL (Reduced Level –
elevation above sea level in metres) of
the drill hole collar
o dip and azimuth of the hole
o down hole length and interception
depth
o hole length.
• If the exclusion of this information is
justified on the basis that the information
is not Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
The documentation for drill hole locations in
Share your feedback
Discover