Independent Review Confirms Gold Potential at Beasley Creek
Released
Released
Announcement PDF
Page 1
Beasley Creek Project – Independent Geological Review Confirms
Orogenic Gold Potential
HIGHLIGHTS
➢ Independent review confirms strong prospectivity for shear-hosted orogenic gold across
the project, positioned along the Mithgoondy Shear Zone and related structures
➢ Flamingo identified as the standout drill-ready target, defined by coincident soil
anomalism, magnetic features, favourable lithologies and structural trends
➢ Historical drilling1
returned 4m @ 11.4 g/t Au (20–24m) in RRC15, with the mineralised zone
remaining open to the north under updated structural interpretation
➢ Follow-up drilling is warranted, with prior work never properly testing the interpreted
extensions along strike or at depth
➢ Regional setting is consistent with Paulsens-style gold systems, influenced by the
northern Capricorn Orogen and mantle-tapping structures including the Soda Fault
➢ Pending tenements show gold-anomalous stream sediments, providing immediate
secondary targets once granted
Catalina Resources Limited (ASX: CTN) (“Catalina” or “the Company”) is pleased to announce it has
completed an independent technical review of the Beasley Creek Gold Project, undertaken by APEX
Geoscience. The assessment consolidates all historical drilling, surface geochemistry, geophysical datasets
and regional structural information into a unified exploration model across both the granted and pending
tenements.
The outcomes provide a coherent basis for an initial, tightly focused exploration program, with clearly defined
structural corridors, geochemical trends and drill-ready targets positioned to support the next phase of work.
Catalina Executive Director, Ross Cotton, commented:
“This review sharpens our understanding of the structural architecture at Beasley Creek and confirms the
presence of a coherent shear-hosted gold system. Importantly, it elevates Flamingo to a genuine high-priority
target — a rare opportunity where soil anomalism, geophysics and historical high-grade drilling all align, yet
the system remains effectively untested.
We now have a clear pathway to value: tighten the geochemical coverage, step north of the 11.4 g/t intercept,
and prepare for targeted drilling once access and approvals are in place. With additional anomalies emerging
on the pending ground, Beasley Creek is shaping as a project capable of delivering meaningful discovery
outcomes for shareholders, and we will advance it aggressively.”
ASX Announcement
8 December 2025
Page 2
Regional Context
Catalina’s 100% owned Beasley Creek Project lies within a broader district (Figure 1) that hosts several
established gold deposits, including the former Paulsens Gold Operation, previously operated by Blackcat
Syndicate (ASX :BC8).Paulsens produced 907,344oz at 7.3 g/t Au, averaging approximately 75koz per annum
between 2005 and 2017. The operation was subsequently acquired by Black Cat Syndicate for remnant
mining of the existing resource, with first gold poured in December 2024.
Beasley Creek occupies a geologically prospective and underexplored portion of this district, where
historical work has been limited in scope and depth, with minimal modern geophysics or systematic
geochemical testing undertaken to date.
Figure 1. Regional location diagram of the Beasley Gold Project (E47/3490)
Structurally Controlled Orogenic Gold Setting
The Beasley Creek Project (fugure 2) lies within the northern Capricorn Orogen, a region characterised by
multiple tectonothermal events and deep crustal structures that have repeatedly channelled hydrothermal
fluids. Within this framework, the project is influenced by the major Soda and Nanjilgardy Fault systems,
which are interpreted to extend to the Moho and are recognised conduits for gold-bearing fluids, with
documented associations to deposits such Blackcat Syndicate’s (ASX:BC8) Paulsens gold operation.
At the project scale, the Mithgoondy Shear Zone forms a north-dipping mylonitic corridor marking the
boundary between Archean granite–greenstone terrain and Fortescue Group stratigraphy, focusing
deformation, alteration and fluid movement along its length. Importantly, the Mithgoondy Shear Zone passes
Page 3
directly through the Beasley Creek tenement, where it represents the principal structural feature controlling
the distribution of lithologies and the localisation of hydrothermal pathways.
Together, the deep regional faults and the well-developed local shear system establish a structural
architecture capable of supporting orogenic gold deposition, providing a strong and coherent geological
basis for exploration targeting within the project area.
Figure 2. Beasley Creek Regional Geology
Flamingo Target Confirmed as a First-Order Drill Priority
The Flamingo Target has been identified as the Company’s highest-ranked exploration priority due to the
convergence of independent datasets.Surface geochemistry defines a linear, kilometre-scale multi-element
(Au–Cu–As) anomaly that tracks the Mithgoondy Shear Zone, while RTP magnetics display a discrete
structural discontinuity coincident with sheared mafic and felsic host rocks (figures 3 ,4 and 5).
The combined structural architecture, geochemical footprint and favourable lithological setting are
consistent with signatures typical of shear-hosted orogenic gold systems within the Capricorn Orogen.
Importantly, despite several generations of surface sampling, the target area has not been drill-tested, and
the integration of geophysical, geochemical and structural evidence now provides a clear and coherent basis
for advancing Flamingo as a priority early-stage drill target.
Page 4
Figure 3. Rocklea map sheet overlain on TMI magnetic image showing the Flamingo target coinciding with
the termination of a mapped structural trend and a NW-SW trending dolerite.
Figure 4. Anomalous Au, Cu, and As soil sample and magnetics coinciding with the structural trend north of
the Mithgoondy Shear.
Page 5
Figure 5. 100k Geology and soil sampling associated with Flamingo Target area
High-Grade Historical Intersection at RRC15 Provides Immediate Drill Opportunity
GSWA’s analysis of gold from historical alluvial workings confirms a hydrothermal origin with minimal
transport, indicating a proximal vein-related source rather than detrital or conglomerate-hosted
mineralisation. This conclusion aligns with the structural model applied at Beasley Creek and supports the
interpretation that mineralisation is associated with the principal shear systems in the area. Within this
context, the historical intersection of 4m at 11.4 g/t Au1
in RRC15 occurs at the contact between the basal
Fortescue conglomerate and underlying sheared greenstones, a position consistent with a structurally
controlled hydrothermal system (Figure 6.)
The historic structural interpretation indicates that the mineralised zone dips to the north, leaving the original
vertical hole sub optimally oriented and the down-dip extension untested. Given the shallow position of the
historical intercept and its location on a favourable structural plane, a targeted confirmation hole offers a
technically justified, low-cost opportunity to determine continuity and validate a result that has remained
untested for more than two decades.
Page 6
Figure 6. Interpreted Geology Beasley Central prospect
Persistent Pathfinder Anomalism Reinforces Regional Potential
Multiple generations of soil and stream-sediment sampling define a consistent multi-element geochemical
signature (Au, Cu, As,) aligned with the Mithgoondy structural corridor. These anomalies are present across
different datasets, sampling vintages and analytical methods, demonstrating a persistent geochemical
response that is spatially coherent with the project’s principal structural trends.
The anomalism extends onto the pending tenements (E47/5364 & E47/5366), indicating potential continuity
of the mineralised system beyond the currently granted tenure. The presence of these pathfinder elements—
supports the interpretation of hydrothermal fluid movement associated with orogenic gold systems and
provides reliable geochemical vectors for both immediate drill targeting within the core project area and
early-stage reconnaissance across the broader holdings.
Page 7
Figure 7. Generational Soil and Stream soil and stream-sediment sampling
2026 Exploration Incentive Scheme (EIS) Co-Funding Application
Catalina intends to apply for co-funding under the Western Australian Government’s Exploration Incentive
Scheme (EIS) to support the initial drilling program at Beasley Creek.
The independent technical review has identified several high-priority structural and geochemical targets that
have never been drill-tested with modern methods, including the down-dip continuation of the historical
high-grade intercept at RRC15 and the untested Flamingo structural corridor.
These targets represent technically robust, early-stage opportunities where EIS support is well aligned with
the program’s objective of encouraging drilling in underexplored geological settings. Securing co-funding
would enable Catalina to accelerate first-pass andconfirmatory drilling activities while applying capital more
efficiently across the broader portfolio.
Next Steps
➢ Complete soil infill and extension sampling across the Flamingo Target and other identified
locations along strike to refine drill collar locations and finalise target footprints.
➢ Undertake early-stage reconnaissance across the pending tenements as soon as they are granted,
with results used to refine RC drill planning.
➢ Prepare and submit a formal EIS co-funding application during the 2026 funding cycle to support the
initial drilling program at Beasley Creek.
➢ Finalise heritage engagement, access planning and operational logistics required in advance of
exploration activity.
➢ Commence drilling activities—including the RRC15confirmation hole and first-pass drilling along the
Flamingo structural corridor.
Page 8
Catalina will provide further updates as each stage of the work program is advanced and finalised.
This announcement has been approved for release by the Executive Directors of the Company.
Contacts
Investors/ Shareholders
Ross Cotton
Executive Director
T: +61 (0)8 6165 8858
References (ASX)
This Report contains information extracted from ASX market announcements reported in accordance with
the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves” (“2012 JORC Code”). Further details (including 2012 JORC Code reporting tables where
applicable) of exploration results referred to in this announcement can be found in the following
announcements lodged on the ASX:
1
CDT ASX Announcement 21 February 2018: Beasley Creek Prospectivity Enhanced
The Company confirms that it is not aware of any new information or data that materially affects the
information in the original reports, and that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original reports.
Competent Person Statement
The information in this announcement that relates to exploration activities within the Beasley River Project
is based on information compiled by Dr Nishka Piechocka, PhD, Vice President of the Australian Institute of
Geoscientists (AIG) and a full-time employee of Apex Geoscience. Dr Piechocka has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration and to the activity being
undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves (JORC Code). Dr Piechocka
consents to the inclusion in the report of the matters based on her information in the form and context in
which it appears.
Where the Company refers to the Mineral Resources in this report (referencing previous releases made to
the ASX), it confirms that it is not aware of any new information or data that materially affects the
information included in that announcement and all material assumptions and technical parameters
underpinning the Mineral Resource estimate with that announcement continue to apply and have not
materially changed.
Forward-Looking Statements
This announcement contains forward-looking statements that are subject to a range of risks and
uncertainties. These statements relate to the Company’s expectations, intentions, or strategies regarding
the future. These statements can be identified by the use of words like “anticipate”, “believe”, “intend”,
“estimate”, “expect”, “may”, “plan”, “project”, “will”, “should”, “seek” and similar words or expressions
containing same. These forward-looking statements reflect the Company’s views and assumptions with
Page 9
respect to future events as of the date of this release and are subject to a variety of unpredictable risks,
uncertainties, and other unknowns. Actual and future results and trends could differ materially from those
set forth in such statements due to various factors, many of which are beyond our ability to control or
predict. These include, but are not limited to, risks or uncertainties associated with the acquisition and
divestment of projects (including risks associated with completing due diligence and, if favourable results
are obtained, proceeding with the acquisition of the Beasley Creek Project), joint venture and other
contractual risks, metal prices, exploration, development and operating risks, competition, production
risks, sovereign risks, regulatory risks including environmental regulation and liability and potential title
disputes, availability and terms of capital and general economic and business conditions.
Given these uncertainties, no one should place undue reliance on any forward-looking statements
attributable to the Company, or any of its affiliates or persons acting on its behalf. Subject to any continuing
obligations under applicable law the Company disclaims any obligation or undertaking to disseminate any
updates or revisions to any forward-looking statements in this announcement to reflect any change in
expectations in relation to any forward-looking statements or any change in events, conditions or
circumstances on which any such statement is based.
ABOUT CATALINA RESOURCES LIMITED
Catalina Resources Limited is an Australian diversified mineral exploration and mine development
company whose vision is to create shareholder value through the successful exploration of prospective
gold, base metal, lithium and iron ore projects and the development of these projects into production.
Page 10
Beasley River Project
APPENDIX 1: JORC CODE, 2012 EDITION - TABLE 1
JORC Code, 2012 Edition – Table 1 report template
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralization that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been done this would be relatively simple (eg
‘reverse circulation drilling was used to obtain
1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In
other cases more explanation may be
required, such as where there is coarse gold
that has inherent sampling problems.
Unusual commodities or mineralization types
(eg submarine nodules) may warrant
disclosure of detailed information.
• Exploration activities on the Beasley project
have been completed by CRA, Vageta Pty Ltd,
and Castle Minerals between 1993 and 2022.
CRA completed initial stream sediment
sampling in 1993 (primarily targeting Nickel),
Vageta Pty Ltd completed RC drilling in
1998/1999 targeting gold, and between 2017
and 2022 Castle Minerals Ltd completed
several stream sediment and soil sampling
programs targeting gold.
• CRA stream sediment samples were
collected from active stream channels.
Samples were sieved in field and 150-250
grams of minus 80 mesh material was
retained for analysis.
• Vegata Pty Ltd conducted Reverse Circulation
(RC) drilling. Sampling was carried out using
protocols established by Vageta Pty Ltd at the
time. RC samples were described as being
collected as single metre intervals. No other
details are available. The gold mineralisation
expected in the conglomerate unit is coarse
grained with a high nugget component
causing sampling to be problematic. No
description of the methods used to undertake
the sampling have been described. It is
assumed standard industry techniques were
applied. Four metre composite samples were
routinely collected down the hole and
submitted for assay.
• Castle Minerals Ltd collected stream
sediment samples from streams draining
areas downstream from prospective
conglomerate beds. Stream sediment
samples were collected from the base of the
stream bed by digging. Sample material was
Page 11
Criteria JORC Code explanation Commentary
sieved to - 2mm to remove coarser material.
Approximately 15kg of sieved material was
collected at each trap site for processing. The
stream sediment sample technique collects
material from a large area drained by the
creek. The technique is used widely in the
exploration industry as a first pass tool to
access areas for anomalous metal
concentrations that can be tracked up stream
to their source. The stream sediment sample
collection method is industry standard. The
samples were processed using a portable wet
sluice to produce a concentrate. This
concentrate was panned off to reveal
recovered gold. The company employed field
personnel with experience operating similar
equipment in order to ensure accurate results
were obtained. A subsample of the bulk
stream sediment sample was collected for
laboratory analysis.
Castle Minerals Ltd soil samples are
homogenised by the collection process. Soil
sampling results are a first pass exploration
technique that can assist in vectoring toward
mineralisation. Soil sampling is regarded as a
standard first pass exploration techniques.
For soil sampling, at the selected sample
site, a small hole is dug to a depth of
approximately 20 cm. The soil material at the
base of the hole was sieved, and
approximately 2kg of –2mm soil material was
collected into a numbered calico bag.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (eg core diametre,
triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether
core is oriented and if so, by what method,
etc).
• Reverse Circulation drill technique was used
by Vegata Pty Ltd
Drill
sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results assessed.
• Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• The gold mineralisation in the conglomerate
rocks is believed to be coarse grained with a
high nugget effect. The size of the sample and
method of processing the samples is critical
in establishing accurate grades for the
intersections. The small sample size
collected by RC drilling is not sufficient to
accurately estimate the grade of the
mineralisation.
Logging
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• All drill holes were geologically logged. The
descriptions appear to be complete and
provide a geological framework to constrain
the mineralisation.
• Geological logging recorded a description of
Page 12
Criteria JORC Code explanation Commentary
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
the major lithologies recovered from the drill
chips. Quantitative estimates of the
percentage of quartz veining were made.
• All drill holes were geologically logged.
Sub-
sampling
techniques
and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling is
representative of the in situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• CRA stream sediment sample preparation
included riffling out enough material required
for assay and store remainder. Dry and fine
pulverise to minus 200 mesh in Cr free bowl
with quartz wash between samples.
• Vegata composite 4m samples were prepared
from the 1m samples collected during the
drilling. No details were provided on how the
composite samples were collected. For
sampling gold mineralisation with an
expected high component of coarse gold the
sample size is not considered representative.
The sample size is not considered sufficient
to adequately represent the mineralisation.
Castle subsample from the bulk stream
sediment sample was collected by PVC tube
sampling through the sieved and
homogenized bulk sample. The entire bulk
sample (stream sediment) was processed
through the field concentrator and panned
off. The concentration and panning was
undertaken by field personnel familiar with
the equipment or similar equipment.
Between each sample the concentrator and
pan dish was thoroughly cleaned The entire
subsample was bottle roll leached in a
solution of cyanide to dissolve any gold in the
sample. The liquor was analysed for gold by
atomic absorption technique (AAS). No
specific quality control measures were
adopted for the subsampling of the bulk
stream sediment samples. The process was
undertaken by experienced personnel in the
field. No field duplicates were collected
during stream sediment sampling. Due to the
coarse nature of the gold, sample size is
important to obtain a representative sample
of the material to be tested. No work has
been undertaken on the appropriate sample
size however 15kg samples are being
collected by other companies undertaking
similar exploration in the area.
Page 13
Criteria JORC Code explanation Commentary
Castle soil samples were sieved to collect
the -2 mm fraction. All samples were dry. The
entire sample was pulverized to a nominal -
80 micron at the laboratory. Once the
sample was pulverized a 25 gm subsample
was taken by a scoop for digestion. There
was no subsampling. Field repeat soil
samples were collected every 50th sample.
The sample size is considered appropriate
for the material being sampled.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
• CRA samples were submitted to Analabs in a
single batch. Gold was analysed by fire assay
using a 50 g charge with a detection limit of
0.001 pmb. Platinum and palladium were
determined by ICP-MS following lead
collection, with detection limits of 0.5 ppb.
Other elements were analysed using partial
acid digestion (HClO₄, HCl, HNO₃) and
Atomic Absorption Spectroscopy (AAS) for
major and trace metals, including: Mg (HF,
HClO₄, HNO₃, HCl digestion; AAS; detection
limit 100 ppm), Fe (HClO₄, HCl, HNO₃
digestion; AAS; detection limit 5 ppm), Ag (1
ppm), Co (3 ppm), Cr (7 ppm), Cu (2 ppm), Mn
(3 ppm), Ni (5 ppm), Pb (3 ppm), Zn (2 ppm).
Eight samples were duplicated in field and
secreted into the analytical batch.
• Vegata RC samples were submitted to ALS
Laboratories Pty Ltd. Gold was analysed by
the PM205 technique with a lower detection
limit of 0.001 ppm. Cu, Pb, Zn, Ag, As, Fe, Bi,
Cd, Co, Mg, Mn, Mo, Ni, P, Sb, Cr were
analysed by the IC 205 technique. Only
internal laboratory QA/QC was undertaken for
RC drilling and stream sediment sampling
programs.
• The Castle stream sampling program utilised
a two stage process. The presence or
absence of visual gold was determine using
the field concentrator and panning technique.
Cyanide leachable gold was determined
using the bottle roll technique. Both
techniques are considered suitable for the
style of mineralisation being explored. Both
techniques are considered partial. No
geophysical surveys undertaken. No external
duplicates or blanks were submitted.
Standard internal laboratory checks were in
place.
Castle 25g sub sample of the soils were
digested in an aqua regia solution and
analysed for a multielement suite by ICP OES
Page 14
Criteria JORC Code explanation Commentary
or MS. The aqua regia technique is not a
complete digestion but for soil material is
considered adequate. A 30g subsample of
form the pulverized rock chip sample was
fire assayed and analysed for Au, Pt, Pd.
Another subsample was digested in a 4 acid
solution and analysed for a multielement
and REE . The 4 acid digestion is considered
a total digestion. Field repeat sample was
collected every 50th sample and given a
separate sample number. These samples
were collected in an identical manner to the
original sample.
Verification
of sampling
and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• There is no documentation of the verification
of anomalous Au intercepts by CRA.
• There is no documentation of the verification
of anomalous intercepts by Vegeta Pty Ltd
however during the 2018 Castle field
campaign, the remnants of sample bags from
several holes were located close to drill
collars. The bags were in a highly degraded
condition and depth intervals obscured.
Metal detecting of the sample bags failed to
identify any gold nuggets or flakes.
• Castle stream sediment sampling was
considered early stage exploration and the
type of work completed to date, no
independent verification or assaying has been
undertaken.
As part of the Castle soil program anomalous
geochemical thresholds were determined by
a senior geologist. Pre-numbered sample
bags were used. Field operators were
provided with an electronic file of the
planned sample locations to load into a GPS.
The actual sample location was recorded as
a waypoint with the sample number of the
sample collected. The operator provided a
digital copy of the downloaded GPS file. No
adjustments to assay data were undertaken.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• CRA stream sediment sample locations were
determined with GPS instruments and
marked on air photographs for back up in
cases where poor satellite configuration
caused wildly erroneous readings.
• Vegata initially recorded coordinates for the
drill holes in local grid coordinates. During the
Castle field mapping campaign, the
Page 15
Criteria JORC Code explanation Commentary
coordinates of the drill holes were measured
by hand held GPS with an accuracy of
approximately 3m. The hole identifications
were made by comparing drill plans in the
report with the GPS drill pickup.
Local grid and GDA 94 Zone 50 datum. The
topography in the area of drilling has
moderate relief, the accuracy of the
elevation data from a GPS may only be
accurate to +/-10m, and is not considered to
be an absolute elevation reading.
• Castle stream sediment sample locations
were recorded from a hand-held GPS.
Accuracy is approximately +/- 2m, and
locations compared with recent colour aerial
photography. GDA94 zone 50 projection. The
combination of aerial photography and GPS
readings are considered sufficiently accurate
for the stage of exploration.
During the Castle soils programs the
operator used a GPS unit to navigate to each
predetermined soil sample site. The actual
sample site was recorded as a way point.
GDA 94, zone 50. GPS measurements of soil
sample positions are sufficiently accurate for
first pass geochemical sampling.
Data
spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
• Whether sample compositing has been
applied.
• CRA collected 198 stream sediment samples
at a density of about 2-3 samples per square
kilometre.
Share your feedback
Discover