Annual Report to shareholders
Released
Released
Announcement PDF
C ATA L I N A R E S O U R C E S LT D
(Formerly Shree Minerals Limited)
ACN 130 618 683
2023 ANNUAL REPORT
CATALINA RESOURCES LTD
TABLE OF CONTENTS
Corporate Directory
Directors’ Report
Auditor’s Independence Declaration
Statement of Profit or Loss and Other Comprehensive Income
Statement of Financial Position
Statement of Changes in Equity
Statement of Cash Flows
Notes to the Financial Statements
Directors’ Declaration
Independent Auditor’s Report
Additional Information
Corporate Governance Statement
1
2
30
31
32
33
34
35
60
61
65
67
CORPORATE DIRECTORY
DIRECTORS
Sanjay Loyalka
Richard Beazley (appointed 2/8/2022)
Michael Busbridge (appointed 19/1/2023)
COMPANY SECRETARY
Sanjay Loyalka
REGISTERED OFFICE
Unit 38
18 Stirling Highway
Nedlands WA 6009
Ph: (08) 61181672
Email: info@catalinaresources.com.au
Website: www.catalinaresources.com.au
AUDITOR
Stantons
Level 2, 40 Kings Park Road
West Perth WA 6005
Ph: (08) 94813188
Fax: (08) 93211204
SHARE REGISTRY
Boardroom Pty Limited
Level 8
210 George Street
Sydney NSW 2000
Ph: (02) 92909600
Fax: (02) 92790664
.
Page 1
DIRECTORS’ REPORT
The Directors present this report together with the financial report of Catalina Resources (formerly Shree
Minerals Limited), (“CTN”, “Catalina” and/or “the Company”) for the year ended 30th June 2023.
DIRECTORS
The names of the Directors in office during the financial year and until the date of this report are as follows.
Directors were in office for this entire period unless otherwise stated.
Sanjay Loyalka
Amu Shah (retired 28/11/2022)
Davide Bosio (resigned 19/1/2023)
Richard Beazley (appointed 2/8/2022)
Michael Busbridge (appointed 19/1/2023)
COMPANY SECRETARY
Sanjay Loyalka
PRINCIPAL ACTIVITIES
The principal activities of the Company during the financial year consisted of mineral exploration, development,
and mining.
OPERATING RESULTS
The net loss of the Company after providing for income tax amounted to $1,431,533 (2022: net profit $131,370).
The loss of FY 2023 is mainly due to:
– loss on fair valuation of financial asset of $427,500, being shares of MetalsGrove which were received as
consideration for sale of interest in Arunta Joint Venture which resulted in gain in FY 2022 of $785,076;
– Impairment of exploration assets of $ 115,590 due to relinquishment of tenements; and
– Impairment of mine development asset of $231,070 due to ongoing delays in the permitting process of
Nelson Bay River Iron project and consequent uncertainty about the timing of re-commencement of the
project.
DIVIDENDS PAID OR RECOMMENDED
The Directors do not recommend the payment of a dividend and no amount has been paid or declared by way of
a dividend to the date of this report.
REVIEW OF OPERATIONS AND ACTIVITIES
Highlights:
Nelson Bay River Iron Ore Project
•
Progressing re-permitting of the direct shipping ore (“DSO”) project at Nelson Bay River Iron Project
(“NBR”)
•
the Company continues to engage with relevant stakeholders to progress the NBR project. Catalina is
encouraged by the visit to NBR mine by Hon. Felix Ellis, Minister for Resources, Tasmania in March 2023.
•
Referral Application under EPBC Act lodged in early June 2023 following completion of an additional
targeted Autumn Fauna Survey in April 2023 and report received in May 2023.
•
Lodged in early August 2022, Development Proposal and Environmental Management Plan (“DPEMP”)
Supplement No. 2 in response to "Request for Additional Information (“RFI”) – Waste Rock and Mine
Closure" issued by EPA in late June 2022.
Lachlan Fold Belt Project
•
Soil and rock chip assays outline a robust southwest orientated anomaly exceeding 600m in strike
length at EL9346, Oak Hill
o
Assays up to 1.4 g/t Au, 28 g/t Ag, 0.44% Pb and 1.27% As have been received from rock chips.
o
Southwestern extension of a mineralised trend in a neighbouring tenement (EL 7544) that
contains two gold resources with a combined JORC Mineral Resource of 154koz Au ( EL7544 is
not owned by Catalina- refer Company’s ASX announcement of 8th February 2022).
Page 2
DIRECTORS’ REPORT
•
Follow up studies including RC drill planning underway at EL9346, Oak Hill.
•
Landholder Access Agreement negotiated and executed at EL9346, Oak Hill, with one landowner for a
part of the tenement.
•
During the year completed activities agreed to enable consideration of revoking of suspension at
EL9155, Rock Lodge:
•
o
Independent review of compliance systems.
o
Biodiversity Assessment.
o
Report on the findings, recommendations and corrective actions arising from these reviews.
o
Aboriginal cultural heritage assessment.
o
Application lodged for Aboriginal Heritage Impact Permit.
Resources Regulator, NSW has in July 2023 accepted the Mining Act Enforceable Undertaking (“EU”) by
Catalina Resources Ltd, concerning EL9155, Rock Lodge.
Laverton Project
•
Access Agreements negotiated and executed with following parties having existing tenements
(miscellaneous licence) over parts of areas within our ELAs:
o
Focus Minerals (Laverton) Pty Ltd
o
Murrin Murrin Operations Pty Ltd
o
GSM Mining Company Pty Ltd
•
Heritage Agreement negotiated and executed with NTS Goldfields Limited as agent for the Nyalpa
Pirniku, native title party.
•
Pursuing access agreements with another adjacent tenement owner having existing tenements
(miscellaneous licence) over parts of the area within our ELAs.
Dundas Project
•
Air core re-splits from the maiden air core drilling program in the southern part of E63/2046 at Dundas
project reveal assays exceeding 1% TREO (total rare earth element oxides).
•
Hole 22DAC095 intersected 3m @ 0.92% TREO, including 1m @ 1.78% TREOs. Adjacent holes (100m
apart) are also very anomalous. Hole 22DAC066 intersected 2m @ 1.02% TREOs. This hole also
contained 2m @ 0.18% TREO in the bedrock at the EOH.
•
Very high Nd₂O₃ assays received with up 0.35% intersected in 22DAC095 and 0.23% in hole 22DAC066.
•
Latest assays confirm a valuable Heavy Rare Earth Elements ratio of 19% HREO/TREO and critical
magnet metals NdPr + DyTb ratio of 24% of total REE’s.
•
Pursuing follow up exploration studies, drill planning including regulatory approvals for next stage of
exploration including Conservation Management Plan (“CMP”) including:
o
Deeper follow up drilling near the air core drilling done in FY 2023.
o
Testing of lithium pegmatite potential identified in the northern part of E63/2046 at Dundas
Project where previous drilling intersected pegmatites that have not been assayed for lithium.
Dundas Project is interpreted to possibly be along strike from Liontown Resources’ Anna
Lithium Resource
Business Development
•
Catalina is continuing to identify and assess exploration and early development opportunities in lithium,
rare earths, gold and base metals projects.
Page 3
DIRECTORS’ REPORT
Nelson Bay River Iron Project
Catalina is pleased to advise that it lodged a Referral Application under the Environment Protection and
Biodiversity Conservation Act, 1999 (EPBC Act), in early June 2023. This follows advice received from the
Department of Climate Change, Energy, the Environment and Water (“DCCEEW” and or “The Department”) that
they consider the development proposal would likely require “Referral” for a new assessment under the EPBC
Act.
Prior to lodgement of the referral application, an additional targeted autumn fauna survey was completed in
April 2023 and consequential engineering designs for the mitigation strategies were completed in May 2023.
The Department has advised that it has successfully received and completed validation of our Referral
Application (EPBC 2023/09571) regarding the NBR DSO Project for consideration under the Environment
Protection and Biodiversity Conservation Act 1999 (EPBC Act). Information about this proposed action has been
published on the Department’s website for public consultation on 16th August 2023 for comments till 30th August
2023. At the end of the consultation period, the information included in the referral, along with any comments
received, will be used to help decide whether this proposed action:
• is a controlled action (one that is likely to have a significant impact on matters protected under the
EPBC Act and therefore needs to be assessed and approved by the Minister for the Environment and
Energy before it can proceed), or
• is not a controlled action and may be undertaken but only as described in the referral, or
• does not require approval under the EPBC Act.
As per previous company announcements, the State Government’s process is advanced, and the process was put
on hold until the resolution of the EPBC issues. The DPEMP version of August 2021 was accepted by EPA
Tasmania to have been compliant with the guidelines and the public consultation process was completed in
February 2022, with subsequent RFIs responded by way of supplementary DPEMPs.
On that basis, the Company hopes to be in a position to consider the decision for recommencement of the mine
once the permitting process is completed. The Company remains committed to driving value for Shareholders
and look forward to updating the market as it continues to progress this advanced junior iron ore project
towards recommencement in a very strong macro environment for producers.
Meanwhile, the Company continues to engage with relevant stakeholders to progress the NBR project. Catalina
is encouraged by the visit to NBR mine by Hon. Felix Ellis, Minister for Resources, Tasmania in March 2023.
Photos: Hon. Felix Ellis, Minister for Resources, Tasmania at NBR project, March 2023.
The NBR Project (Mining Lease 3M/2011) is located in the far north-west of Tasmania and is approximately
150km from the Burnie Port. The Project is within an established mineral province in the region. Operating mines
include Grange Resources Ltd’s (ASX: GRR) Savage River Iron Ore.
Page 4
DIRECTORS’ REPORT
The Direct Shipping Ore (DSO) project at NBR is an all-contract mining, processing and haulage operation using
local contractors in the region. It requires no major processing beyond crushing and screening after which the
ore is then trucked to the port and shipped. It was developed in 2013 with the first shipment of ore leaving the
Port of Burnie in January 2014. The NBR project was placed on care and maintenance in June 2014 following
sharp iron ore price falls.
Figure 1. Existing development NBR DSO project. (Source: Google Earth)
Historical production from the previous mining campaign totalled 181,000 tonnes shipped with average grades
of Fe 57.5%, SiO2 7.7%, Al2O3 1.3%, P 0.07% and S 0.04%.
The historic price received for NBR ore was enhanced with premiums (in line with market benchmarks) for
low Alumina and Lump (About 40% of the DSO Iron ore at NBR is Lumps with Iron ore Fines being approximately
60%).
Historic costs during FY2014 when the mine was last in production was approximately AUD $72 per tonne FOB
Burnie Port (as derived from 2014 Annual Report to Shareholders).
With the improvement in the iron ore price in recent years, the Company has been actively working to re-permit
the NBR project. The strategy has been to recommence the production of the DSO resources from the existing
open pit at NBR project.
Lachlan Fold Belt Project
Catalina’s Oak Hill Project (EL9346) is located 25 kms northwest of Albury in NSW (Figure 2). It abuts EL7544 on
its eastern side (Figure 2). Within EL7544 the Stoney Park and Elm Park gold prospects, discovered in 2015 by
Minerals Aust Pty Ltd, have a combined JORC 2012 Mineral Resource of 154koz Au.
In April 2023, Catalina collected 15 rock chip samples and 65 soil samples during a regional mapping exercise of
the tenement, EL9346. Best rock chip assays are provided in Table 1 and their locations are illustrated in Figure
3. The rocks are anomalous in a range of elements including Au, As, Ag, Bi, Cu, Pb, Sb and Mo.
Page 5
DIRECTORS’ REPORT
Figure 2. Aerial image of Oak Hill. Historical geochemical gold in soil contours overlie a
prominent structure that contains the Elm and Stoney Park gold deposits. Also shown is
the location of Figure 3.
Sample_ID
MGA_E
MGA_N
Au
ppb
Ag
ppm
As
ppm
Bi
ppm
Cu
ppm
Pb
ppm
Sb
ppm
Mo
ppm
198430
481341
6025488
386
5
933
96
232
4560
222
0
198431
198435
198436
198437
198438
198439
481353
481778
481928
481942
481850
481850
6025473
6024503
6024970
6024980
6024812
6024830
779
513
1390
488
381
146
28
0
0
0
0
0
577
32
5210
3410
796
223
48
73
3
1
2
1
297
53
70
98
98
13
4280
39
108
9
39
23
187
1
64
33
5
9
1
26
2
1
18
1
198440
198441
198442
481918
6024980 1400
2
8920
0
213
481938
6024990 1020
2
12700 0
187
481938
6024980 360
1
3020
0
55
Table 1. Anomalous rock chip assays from EL9346.
52
15
11
85
45
25
1
1
1
Figure 3 is a summary of Catalina’s soil and rock chip sampling geochemistry overlain on the RTP aeromagnetic
image. Outcropping rocks in the area are rare and the undulating terrain is covered by extensive grasslands
suitable for cattle grazing.
Page 6
DIRECTORS’ REPORT
Au and As soil contours together with rock chip assay data suggest anomalous geochemistry is present over
600m within EL9346 as illustrated in Figure 3 (green dotted line). Hosting the anomalous geochemistry is a
distinctive and separate NE-SW orientated elliptical aeromagnetic feature. It lends support for an underlying
structure coincident with the soil and rock chip geochemical anomaly. This feature is in an offset position to the
trend of the Stoney Park historical drilling and its magnetic susceptibility is suggestive of a different protolith to
that seen in the historical resources. Possible protolith alternatives include a highly altered granitic intrusive or
porphyry style source rocks.
Additionally, an old gold working (for its location, see callout ‘Rock chip assays from old gold working’ in Figure 3)
revealed rocks with a strongly recrystallized and silicified igneous texture, a rock type unlike that described for
the Elm and Stoney Park deposits. Petrography suggests these rocks are indicative of an igneous petrogenesis
with late stage silicification of feldspars by hydrothermal activity, as evidenced by banding in an alteration
overprint and common clay altered fine veins and groundmass containing sericite and muscovite. Common strain
is recognised through quartz populations and suggests a high strain regime / shear zone.
A feature of these altered rocks is the presence of abundant euhedral arsenopyrite and trace scorodite. Other
sulphides include pyrite and galena. These arsenopyrite rich rocks, also containing anomalous gold, may be the
source of the anomalous soil geochemistry seen in Figure 3 and testing by RC drilling for economic gold
mineralization is a high priority. The company is working on follow up exploration studies including RC drill
planning at Oak Hill.
RC drilling at the Rock Lodge
prospect (EL 9155) in the Lachlan
Fold Belt Project, NSW has
intersected
significant
mineralisation. The Rock Lodge
Project covers an area of 163
km² and is located 35 km south
of Cooma. It is prospective for
orogenic, Intrusion Related Gold
Systems (IRGS) and skarn related
gold mineralisation.
RC drilling completed in April
2022 tested prioritised drill
targets consisting of extensive
and continuous IP anomalies
that are coincident with very
anomalous soil and rock chip
geochemistry.
Figure 3. Summary diagram of
the rock and soil Au and As
geochemistry within EL9346. The
trend
of
anomalous
geochemistry is shown by the
green dotted line. Background
image is the Reduced to Pole
(RTP) aero magnetics.
Page 7
DIRECTORS’ REPORT
Catalina’s drilling has intersected a wide zone of stacked vertical lenses of polymetallic mineralisation at Rock
Lodge. For example, RC hole SRLRC005 intersected four (4) significant mineralised zones over a width of 24m,
from 75m to 99m (including 2m @2.13 g/t Au and another 2m @2.12 g/t Au), illustrated in Table 2. At the end of
hole, 102m, rocks were still pervasively hydrothermally altered (pyrite, silica, sericite) suggesting that additional
downhole zones may have been intersected if excessive water flows had not stopped drilling. West of SRLRC05,
Catalina’s drilling has intersected mineralisation in SRLRC002 (8m @ 1.08 g/t Au including 3m @2.12 g/t Au).
As suggested by the range in elements present, the mineralisation signature suggest a high temperature fluid
may have been responsible. Apart from Au and Ag, the mineralisation includes varying amounts of Bi, As, Cu, Sb,
Pb, Cd and Zn. Table 2 tabulates the significant intersections received from Catalina’s RC drilling.
Table 2. Significant RC drilling Intersections.
Total
From To Interval
Hole No
Intersection
Depth (m) (m) (m)
(m)
SRLRC001
35
11
12
1
1m @ 3.7 g/t Au, 1.7 g/t Ag, 94 g/t Bi,
21
22
1
SRLRC001
1m @ 0.76 g/t Au, 2.1 g/t Ag
SRLRC002
35
0
8
8
8m @ 1.08 g/t Au, 4.2 g/t Ag, 0.28% As, 61 g/t Bi
0
3
3
SRLRC002
incl. 3m @ 2.12 g/t Au, 6.67 g/t Ag, 0.6% As
SRLRC005
102
75
77
2
2m @ 2.13 g/t Au, 2.4 g/t Ag, 0.6% As, 54 g/t Bi, 0.07% Cu
SRLRC005
78
84
6
6m @ 0.75 g/t Au, 0.8% As, 22 g/t Bi, 0.05% Cu
SRLRC005
82
84
2
incl. 2m @ 2.12 g/t Au, 2.4 g/t Ag, > 1% As, 0.07% Cu, 0.06% Zn
SRLRC005
89
96
7
7m @ 0.33 g/t Au, 1.13 g/t Ag, 0.51% As, 51 g/t Bi, 0.06% Cu,
SRLRC005
89
91
2
incl. 2m @ 0.49 g/t Au, 1.7 g/t Ag, 0.37% As, 60 g/t Bi, 0.13% Cu
97
99
2
SRLRC005
2m @ 0.78 g/t Au,1.9 g/t Ag, 65 g/t Bi, 0.2% Cu
SRLRC006
50
27
29
2
2m @ 6.1 g/t Ag, 0.26% Pb, 0.5% Zn, 28 g/t Cd
27
28
1
SRLRC006
incl. 1m @ 10.6 g/t Ag, 0.44% Pb, 0.88% Zn, 51 g/t Cd
The intersections from Catalina’s drill holes SRLRC002 to SRLRC005 and also the historical drilling, including
MYRC01, constitute a very wide (60m) mineralised envelope of stacked vertical lenses of significant polymetallic
sulphide at Rock Lodge. Two hundred meters to the north, IP anomalies and similar anomalous rock chip
geochemical signatures (Figure 4), suggest the mineralisation envelope may be continuous at least to this area.
As the envelope is open in all directions further drilling focusing on the continuity, depth and lateral extent of the
stacked veins is now a very high priority and represents an exciting drill target for Catalina Resources.
Page 8
DIRECTORS’ REPORT
Figure 4. Summary plan showing significant drilling intersections and RC pre-collars, IP anomalies, rock chip Au
geochemistry and location of drilling cross-section C-C’.
The Company continues progressing activities advised by the Resources Regulator to enable consideration for
revoking the suspension at Rock Lodge EL9155. During the year following activities were completed:
•
•
•
•
•
Independent review of compliance systems.
Biodiversity Assessment.
Report on the findings, recommendations and corrective actions arising from these reviews.
Aboriginal cultural heritage assessment.
Application lodged for Aboriginal Heritage Impact Permit.
Resources Regulator, NSW has, in July 2023, accepted the Mining Act Enforceable Undertaking (“EU”) by Catalina
Resources Ltd, concerning alleged contraventions at EL9155, including a minimum expenditure of $141,964 in
carrying out terms of the EU.
After the lifting of the suspension, the Company plans to drill two or three deeper angled diamond drill holes
beneath previously drilled RC holes. Down Hole Electro Magnetic Surveys (DHEM) will also be employed,
searching for off-hole conductors, which may represent wider massive sulphide mineralisation than what has
already been found in the RC drilling. Additionally, diamond drilling will enable the collection of orientated
structural data, including dips and strikes of mineralised veins, necessary for future drill hole planning and
calculations of the true widths of mineralisation. Planning for one of these diamond holes is illustrated in Figure
5. Additionally, diamond drilling will enable the collection of orientated structural data, including dips and strikes
of mineralised veins, necessary for future drill hole planning and calculations of the true widths of mineralisation.
Page 9
DIRECTORS’ REPORT
Figure 5. Cross section C-C’ at Rock Lodge, containing SRLRC005, SRLRC002 and the proposed diamond hole. It
illustrates the wide zone (approx. 60m) of polymetallic mineralisation intersected in all drilling, from SRLRC02 to
MYRC001.
Laverton Project
During the year, the Company advanced negotiations for various access agreements with neighbouring
companies and native title parties. Access agreements negotiated and executed with following neighbouring
tenement owners having existing tenements (miscellaneous licence) over parts of areas within our ELAs.
• Focus Minerals (Laverton) Pty Ltd
• Murrin Murrin Operations Pty Ltd
• GSM Mining Company Pty Ltd
Heritage agreement negotiated and executed with NTS Goldfields Limited as agent for the Nyalpa Pirniku, native
title party.
These access agreements will pave the way for the granting of the Exploration Licences.
Page 10
DIRECTORS’ REPORT
The Laverton Project consists of seven tenements, illustrated in Figure 6, located within the world class
Laverton Province. This province is known to contain some 30 million ounces of gold, making it the second
highest endowed gold district in Western Australia behind Kalgoorlie. The Laverton gold district is also the
highest growth gold district in Australia over the last 25 years. The region hosts several important gold and
nickel deposits including Sunrise Dam (>10Moz), Wallaby (> 8Moz), Granny Smith (>2Moz, closed) and
Lancefield (>2Moz, closed), Windara Nickel (combined 85K tonnes nickel sulphide). Lynas Rare Earth also
operates the Mt Weld Rare Earth Element (REE) operation only 2 km to the south of Catalina’s application.
Figure 6. Regional location of the Laverton project.
The company has identified a series of very prospective under-cover gold and nickel mineralised drill targets
within the tenements. The targets have been generated through an integrated approach using detailed
interpretation of aeromagnetic and gravity images, historical exploration drilling programs and the
mineralisation models developed from the neighbouring world class gold deposits.
Exploration plans will be finalised once all the ELAs are granted as ELs. Meanwhile desktop studies are
continuing over the tenements.
Dundas Project
A 105-hole air core drill program was completed at the Dundas Project in December 2022 for a total of
2,909m with an average depth of 27.7m (Figure 7). Air core drilling was completed to blade refusal (rock too
hard to penetrate).
Page 11
DIRECTORS’ REPORT
Figure 7. Summary of the highlights of resplit assays from air core drilling. Also illustrated are locations of drill
traverse (A-A’) and soil sampling traverse (B-B’) discussed in text. Underlying image is the regional
aeromagnetic image.
A 6-20m blanket of transported colluvium and lake clays overlies and masks the bedrock geology. To look
below this blanket air core drilling successfully intersected geochemical and lithological information of the
bedrock to plan follow up RC drilling. Essentially the air core work has identified the geochemical halo to a
potentially larger target at depth.
Significant REE intersections include:
•
6m @ 0.6% TREO from 16 – 22m in hole 22DAC066, including:
• 2m @ 1.02% TREO from 16-18m, includes 0.23% Nd₂O₃, 0.42% Ce₂O₃,
223 ppm Dy₂O₃, 0.12% and La₂O₃.
•
3m @ 0.92% TREO from 22 – 25m in hole 22DAC095, including:
• 1m @ 1.8% TREO, includes 0.35% Nd₂O₃, 0.75% Ce₂O₃, 284 ppm Dy₂O₃,
and 0.31% La₂O₃.
The assays display an ‘exceptional’ critical magnet metal (NdPr+DyTb) ratio of 24% to total TREOs. These four
HREEs are the core ingredients for the manufacturing of permanent magnets which are used in electric
motors and generators. The growth in permanent magnets is attributed to increased use in the automotive
industry and electric vehicle drivetrains. The Lynas owned rare earth mine at Mt Weld in the Eastern
Goldfields of WA is the sole producer of REEs in Australia.
Page 12
DIRECTORS’ REPORT
Significant REE enrichment in the regolith at Dundas is the result of weathering induced clay formation and
REEs can be either enriched or depleted in different depth horizons of the regolith. Critically, the presence of
anomalous REE mineralisation in bedrock in hole 22DAC066 below the regolith horizons suggests potential
exists at Dundas for higher grade, higher commercial value, hard fresh rock REE mineralisation. The last 2m
re-split samples assayed 2m @ 0.18% TREO at the end of the hole.
The Conservation Management Plan (CMP) which was lodged with the Department of Biodiversity,
Conservations and Attractions (“DBCA”) in February 2023 after feedback received on the November 2022
draft version. The CMP contains details for the next phase of exploration including deeper drilling on the two
existing granted ELs (“exploration licences”) in the Dundas project and exploration plans for the two ELAs
(“exploration licence applications”).
Catalina understands that the DBCA has recently completed the review of the draft CMP and are finalising
their comments to be sent to us, while they are seeking clarifications from Department of Mines, Industry
Regulation and Safety (“DMIRS”) regarding access tracks that need to be cleared (to reach one of the ELAs)
that traverse tenements which Catalina do not hold and where consent to undertake exploration activities
has not been granted.
Background of CMP: As the project is in the Dundas National Park, additional tenement conditions over and
above that for normal exploration licences are in force. These tenement conditions include, prior to any
environmental disturbance, the licensee preparing a detailed CMP for each phase of proposed exploration for
approval. The Minister for Environment and the Conservation and Parks Commission has formal requirements
under Section 24 of the Mining Act 1978 (Mining Act) to provide formal recommendations on proposed
activities in Dundas Nature Reserve prior to the Minister for Mines and Petroleum providing his consent.
DBCA reviews and presents the information prepared by and on behalf of the applicant (including copies of
the proposal document(s) to the Minister for Environment and the Conservation and Parks Commission in the
form of a CMP.
The Dundas Project area is situated within the inferred southeast extensions of the mineralised Norseman –
Wiluna Belt of the Archaean Yilgarn Craton and comprises a tectonostratigraphic assemblage of mafic,
ultramafic and sedimentary dominated units. A major northwest trending fault system transects the
tenements and may represent the prospective Boulder-Lefroy Fault Zone (BLFZ) and the Zuleika Shear
Systems (ZS), illustrated in Figure 8. These shears and faults are highly prospective for gold (Swager et al.,
1995). The tenements are also prospective for lithium mineralisation, being only 25 kms to the southwest of
Liontown’s Buldania Lithium Project, also along the Zuleika Shear Zone.
Page 13
DIRECTORS’ REPORT
Figure 8. Regional location of Catalina’s tenements in the Albany Fraser Belt. Also illustrated are the
projects and highlights of respected neighbouring companies including Metal Hawk and Dundas
Minerals.
Page 14
DIRECTORS’ REPORT
Business Development
Catalina is continuing to identify and assess exploration and early development opportunities in lithium, rare
earths, gold and base metals projects. The Company has successfully built up an exciting portfolio of exploration
projects in world class mineral provinces. These exploration tenements/projects acquired are at an early stage and
the Company is systematically completing the initial steps of access agreements, heritage agreements, surveys and
desktop studies to enable the advancement of exploration activities. As the Company continues its efforts to seek
new projects and advance its exploration projects, it has also implemented a process of continuous evaluation and
prioritisation of its project portfolio. Accordingly, rationalisation of its portfolio was also done including
relinquishing of the lower priority tenements.
Resource and Reserves
Mineral Resources and Reserves Estimates, summarised by JORC classification are as follows:
The in-situ DSO Mineral Resource Estimates, September 2015
Category
Tonnes
Fe %
Al2O3 %
P ppm
S ppm
SiO2 %
LOI %
Measured
300,000
57.6
1.3
947
362
9.2
6.4
Indicated
190,000
57.5
1.4
919
377
9.3
6.3
Inferred
150,000
57.3
1.2
945
421
10.0
6.2
Total
640,000
57.5
1.3
938
380
(Nominal 54% Fe cut off; average density 3t/m3; minor rounding errors)
BFO Resource Estimates 2012
9.4
6.4
Category
Tonnes
Fe %
Al2O3 %
P ppm
S ppm
SiO2 %
LOI %
Inferred
730,000
46.8
2.7
180
680
23.7
4.7
Total
730,000
46.8
2.7
180
680
23.7
4.7
(30% Fe cut off; average density 3t/m3; minor rounding errors)
“This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to
comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last
reported.”
Skarn Dyke Global Iron Resource Estimates
(Includes Magnetite Resource)
Category
M Tonnes
Iron %
Indicated
1.8
38.6
Inferred
9.5
35.9
Total
11.3
36.3
(30% Fe cut off; fresh rock material; minor rounding errors)
“This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to
comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last
reported.”
Skarn Dyke Recoverable Magnetite Resource Estimates
Category
M Tonnes
DTR Mag %
Magnetite Kt
Indicated
1.7
38.5
667
Inferred
6.1
38.2
2,324
Total
7.8
38.3
2,991
(20% DTR cut off; average density 3.71t/m3; fresh rock material; minor rounding errors)
“This information was prepared and first disclosed under the JORC Code 2004. It has not been updated since to
comply with the JORC Code 2012 on the basis that the information has not materially changed since it was last
reported.”
Page 15
DIRECTORS’ REPORT
Magnetite Resource Estimate Concentrate Grad
Share your feedback
Discover